Pre-Operation Safety Check
- Conduct a visual walk-around inspection for leaks or damage
- Ensure area is clear of obstacles and hazards
- Verify load capacity plate is visible and legible
- Check all safety decals and signage are intact
Tire & Wheel Inspection
- Inspect tire pressure and adjust if needed
- Check tires for cuts, cracks, or punctures
- Verify tread depth and even wear patterns
- Inspect rims for cracks or damage
Fluid Level Checks
- Check engine oil and hydraulic fluid levels
- Inspect coolant and brake fluid levels
- Check for any fluid leaks under the forklift
- Ensure fuel level is sufficient for operations
Mast & Fork Assembly Check
- Inspect forks for damage, wear, and proper attachment
- Check mast chains for lubrication and tension
- Verify lift cylinder operation for smooth movement
- Test backrest and carriage for alignment and security
Safety Systems Test
- Test horn, lights, and backup alarms
- Verify seat belt functionality
- Ensure steering and brakes are responsive
- Check fire extinguisher availability and charge