Tire & Wheel Inspection
- Check tire pressure and document deviations
- Inspect tires for cracks, cuts, and embedded objects
- Measure tread depth and wear patterns
- Inspect wheel bearings for wear and lubrication
Fluid System Analysis
- Check engine oil, hydraulic, brake, and coolant levels
- Inspect for fluid contamination or degradation
- Drain water from fuel separator (if applicable)
- Document fluid analysis findings and service needs
Mast & Fork Assembly Check
- Inspect forks for cracks, heel wear, and secure attachment
- Check mast chains for lubrication and proper tension
- Lubricate mast rollers and moving parts
- Ensure proper lift cylinder operation and alignment
Brake & Safety Systems Test
- Test service and parking brakes for functionality
- Inspect brake pads and lines for wear and damage
- Verify lights, horn, and backup alarms
- Ensure fire extinguisher is present and charged
Hydraulics & Engine Check
- Check hydraulic system for leaks and pressure loss
- Inspect hoses, cylinders, and connections for wear
- Verify engine starts easily and operates smoothly
- Inspect exhaust system and cooling system components