General System Overview
- Comprehensive visual inspection of Magnitude™ unit and surrounding areas for leaks, damage, or abnormal conditions
- Record operating hours, compressor starts, and magnetic bearing runtime for maintenance tracking
- Verify all safety systems, alarms, and emergency shutoffs are functional and accessible
- Check proper labeling, warning signs, and safety documentation for regulatory compliance
- Inspect for vibration anomalies, unusual noises, or magnetic bearing system alerts
Advanced Control System
- Daikin intelligent control display functional with clear readings and no error codes
- Review active alarms, warnings, and predictive maintenance alerts
- Control system responsiveness and user interface functionality verified
- Operating parameters and setpoints within manufacturer specifications
- Data logging and trending functions operating correctly
- Energy monitoring and efficiency tracking data accurate and updating
Magnetic Bearing Compressor System
- Magnetic bearing system status indicators showing normal operation with no fault codes
- Bearing position sensors functioning properly with stable readings
- Compressor operation smooth with no unusual vibrations or magnetic field disturbances
- Backup bearing system (if equipped) ready for emergency operation
- Magnetic bearing controller temperature within normal operating range
- Impeller clearances and thrust position monitored and documented
Variable Frequency Drive System
- VFD operating parameters including output frequency, voltage, and current within specifications
- Motor temperature monitoring showing normal thermal conditions
- Drive cooling system functioning properly with adequate airflow
- Harmonic distortion levels within acceptable limits per electrical standards
- Power factor and electrical efficiency readings documented and optimized
- Soft start/stop sequences operating smoothly without electrical anomalies
Refrigerant System Monitoring
- Low-GWP refrigerant levels checked with no leaks detected using approved detection methods
- Pressure and temperature readings throughout refrigerant circuit within normal ranges
- Evaporator and condenser approach temperatures optimized for maximum efficiency
- Expansion device operation and superheat/subcooling values verified
- Refrigerant quality and purity maintained per manufacturer specifications
- Leak detection system functional with calibrated sensors and alarms
Water Systems & Heat Exchangers
- Chilled water flow rates optimized with pumps operating within design parameters
- Condenser water system flow adequate with no obstructions or fouling detected
- Water temperatures throughout system within design specifications for optimal efficiency
- Water treatment system functioning with proper chemical levels and pH balance
- Heat exchanger performance monitoring showing optimal heat transfer rates
- Water filtration systems clean and operational with no bypass conditions
Safety & Protection Systems
- All safety interlocks, emergency stops, and protection devices tested and functional
- Pressure relief systems and safety valves properly seated and operational
- Fire suppression and detection systems (if applicable) tested and ready
- Lockout/tagout procedures accessible and safety signage clearly visible
- Emergency shutdown sequences tested for rapid system isolation
- Personnel safety equipment and procedures verified for regulatory compliance
Performance & Efficiency Monitoring
- System efficiency metrics monitored with kW/ton performance documented
- Energy consumption trends analyzed for optimization opportunities
- Part-load efficiency performance verified against manufacturer curves
- Capacity control responding appropriately to building load variations
- Heat recovery system (if equipped) performance optimized for maximum efficiency
- Predictive maintenance indicators reviewed for proactive service planning
Documentation & Compliance
- Daily operation log maintained with all parameters and observations recorded
- Maintenance activities documented per manufacturer requirements and warranty compliance
- Environmental compliance verified including refrigerant management and disposal
- Safety inspection records updated and regulatory compliance maintained
- Performance data archived for trend analysis and efficiency reporting
- Training records and certification requirements current for all operators