Daikin WLPB – Yearly Chiller Maintenance Procedure

Use this checklist for annual service of Daikin WLPB vapor absorption chillers to ensure system longevity, reliability, and energy performance.

Comprehensive System Overhaul

  • Complete detailed inspection of all components including internal vessel examination
  • Review total annual operating hours and reset service counters
  • Test all alarms under simulated fault conditions and document response
  • Replace all gaskets, seals, and soft goods per manufacturer schedule
  • Update all equipment documentation and as-built drawings
  • Perform vibration analysis on all rotating equipment

Solution System Overhaul

  • Perform complete solution reconditioning or replacement as needed
  • Clean all solution vessels internally during shutdown
  • Rebuild solution pumps including seal replacement
  • Replace all solution strainers and filter elements
  • Calibrate all solution level controls and alarms
  • Verify solution spray nozzle patterns and replace worn nozzles

Heat Exchanger Service

  • Perform eddy current testing on all heat exchanger tubes
  • Clean all tubes mechanically or chemically as appropriate
  • Inspect tube sheets and repair any erosion or corrosion
  • Replace tubes showing excessive wall thinning
  • Perform hydrostatic test on all heat exchangers
  • Document heat transfer performance for baseline comparison

Electrical System Overhaul

  • Perform complete electrical system inspection and testing
  • Test motor insulation resistance and perform polarization index test
  • Clean and test all electrical components including contactors and relays
  • Verify power quality and install monitoring if not present
  • Update electrical drawings and panel labeling
  • Test and certify all safety circuits and emergency stops

Vacuum System Rebuild

  • Rebuild vacuum pump with new seals and gaskets
  • Replace all accessible gaskets and O-rings in vacuum boundary
  • Perform comprehensive helium leak test on entire system
  • Service or replace purge unit components
  • Test and recertify rupture disk assembly
  • Document vacuum decay test results for trending

Water System Overhaul

  • Inspect and clean all water boxes and distribution systems
  • Rebuild water pumps including impeller inspection
  • Replace all water strainers and flow control valves
  • Verify water treatment system effectiveness with analysis
  • Calibrate all flow meters and pressure transmitters
  • Update water balance report for system optimization

Control System Upgrade

  • Update control system software to latest version
  • Replace aging control components and sensors
  • Perform complete control system calibration
  • Test all control sequences and document responses
  • Implement any available efficiency optimization features
  • Train operators on any new control features

Safety Compliance Audit

  • Test and certify all pressure relief devices
  • Verify compliance with current OSHA and local codes
  • Update all safety documentation and procedures
  • Conduct confined space entry assessment if applicable
  • Review and update emergency response procedures
  • Certify all safety training records are current

Annual Performance Review

  • Compile annual performance metrics and efficiency data
  • Perform comprehensive energy audit and cost analysis
  • Compare performance to industry benchmarks
  • Identify opportunities for efficiency improvements
  • Update equipment life cycle cost analysis
  • Generate executive summary report with recommendations