Tire & Wheel Check
- Inspect tire pressure, tread depth, and wear pattern.
- Check for rim cracks, lug nut torque, and wheel alignment.
- Look for cuts, bulges, or embedded objects.
Engine & Fluid Systems
- Check engine oil, hydraulic fluid, transmission fluid, and coolant levels.
- Inspect for fluid leaks, dirty filters, and cap seal integrity.
- Test for unusual engine noise or exhaust emissions.
Hydraulics & Mast Assembly
- Inspect hoses for chafing, leaks, or loose fittings.
- Lubricate mast channels and check chain tension.
- Test lift, tilt, and side-shift for smooth operation.
Brake & Steering
- Check service and parking brakes for proper function.
- Inspect brake fluid, pedal firmness, and responsiveness.
- Test steering operation and inspect for free play or leaks.
Electrical Systems
- Test horn, lights, backup alarm, and indicator panel.
- Inspect battery terminals for corrosion and secure mount.
- Verify alternator output and charging functionality.
Safety Checks & Documentation
- Inspect seat belt, overhead guard, and load capacity plate.
- Verify extinguisher is present and properly charged.
- Record all findings, sign checklist, and notify of any issues.