Forklift Hangcha XC20T Diesel – Daily Inspection Procedure
Perform these structured steps daily to ensure forklift readiness, safety, and regulatory compliance.
1. Pre-Operation Visual Inspection
- Walk around forklift and inspect for visible damage or leaks
- Verify overhead guard and load backrest are secure
- Check mast, forks, and tires for damage or wear
- Ensure warning labels and safety decals are visible
- Confirm operator manual is present and accessible
2. Tyres and Wheels
- Inspect tyre pressure and tread wear
- Check for cracks or embedded objects
- Verify lug nuts and rim integrity
3. Fluid Checks
- Check engine oil, coolant, hydraulic, and brake fluid levels
- Verify fuel tank is at operational level
- Look for any signs of fluid leaks
4. Forks & Mast Assembly
- Ensure forks are straight and securely mounted
- Check for wear on fork heels
- Lubricate mast chains and inspect lift cylinder bushings
5. Safety & Controls
- Test seatbelt, horn, backup alarm, and all lights
- Check steering and brake responsiveness
- Verify fire extinguisher presence and charge
6. Operational Functionality Test
- Start engine and observe for unusual sounds or smoke
- Test lift, tilt, and travel in both directions
- Inspect hydraulic performance under load
7. Documentation & Reporting
- Log all completed inspection steps
- Report any faults or safety concerns to supervisor
- Tag out equipment if unsafe for operation