Detailed Visual Check
- Inspect forklift thoroughly for damage or signs of wear.
- Check for loose or missing bolts and fasteners.
Battery & Charging System
- Perform thorough battery check including electrolyte levels.
- Ensure charger performance meets specifications.
Tyres and Wheel Assemblies
- Inspect and adjust tyre pressures.
- Check tyre wear patterns and rotate tyres if necessary.
Fork and Mast Inspection
- Measure fork wear and check alignment.
- Inspect mast and roller bearings, lubricate if needed.
Hydraulic System Maintenance
- Check hydraulic oil levels and top up as required.
- Inspect hydraulic cylinders and lines closely for damage.
Safety Systems and Controls
- Verify operational status of all safety features including lights, alarms, and seat belts.
- Check functionality of all emergency controls.
Performance Testing
- Perform braking system tests under load conditions.
- Test steering for proper alignment and ease of operation.
Documentation & Follow-Up
- Complete weekly inspection documentation accurately.
- Follow up on unresolved issues from daily inspections.