Battery & Charging System
- Check battery electrolyte levels.
- Inspect battery charger for proper operation.
- Clean battery terminals and apply protectant.
- Perform battery load test.
Hydraulic & Fluid System
- Inspect and replace hydraulic filters if needed.
- Check hydraulic fluid for contamination.
- Inspect hoses and fittings for leaks.
- Lubricate moving parts as per specifications.
Tyres & Wheels
- Check tyre pressure and tread depth thoroughly.
- Inspect wheels and bearings.
- Verify lug nuts are secure and undamaged.
- Inspect wheel alignment.
Fork & Mast
- Measure fork wear and document results.
- Inspect mast chains and adjust tension.
- Check mast rollers for wear.
- Ensure mast and forks operate smoothly.
Brake & Steering Systems
- Check brake pads, discs, and drums for wear.
- Test parking brake for holding ability.
- Inspect steering components for tightness.
- Verify proper fluid levels in steering system.
Electrical & Lighting Systems
- Inspect wiring for damage or corrosion.
- Test all lights, signals, and indicators.
- Check battery connections and cables.
- Inspect electrical controls and switches.
Operator Safety & Controls
- Verify seatbelt condition and functionality.
- Inspect operator controls for proper labeling.
- Test emergency stop controls.
- Ensure clear visibility and unobstructed mirrors.