Handwashing Sink – Inspection Procedure

Follow these structured procedures to ensure safe, hygienic, and compliant handwashing sink operation.

Water Temperature Testing

Drainage Evaluation

Sensor Function Testing

ADA Compliance Verification

Use Checklist Online