Room Entry & Initial Inspection
- Knock and announce housekeeping before entering
- Check door lock, peephole, and latch operation
- Switch on all lights and inspect for odors or pests
- Verify emergency signage is visible and undamaged
Cleanliness & Surfaces
- Wipe all countertops, tables, and surfaces
- Inspect headboard, lamps, switches for dust or stains
- Clean and sanitize frequently touched surfaces
- Ensure waste bins are empty and liners replaced
Bathroom Area
- Disinfect toilet, sink, and shower areas
- Replenish toiletries and tissue supplies
- Check mirrors, faucets, drains, and plumbing
- Ensure towels are fresh, folded, and in place
Furniture & Fixtures
- Test TV remote, lamps, and AC unit
- Inspect bed linens for stains and tucking
- Ensure mattress and pillows are clean and odor-free
- Inspect drawers, closet, and safe for debris or damage
Final Review & Sign-Off
- Complete inspection checklist and note deficiencies
- Report repair needs to maintenance
- Sign inspection log and confirm readiness
- Lock and tag the room for occupancy