Entrance & Exit Safety
- Inspect all entry and exit points for obstruction or malfunction
- Ensure emergency exits are clearly marked and illuminated
- Check for posted evacuation maps at every floor or zone
- Confirm fire doors are accessible and not blocked
Electrical and Fire Safety
- Verify surge protectors and extension cords are used properly
- Ensure circuit panels are unobstructed and labeled
- Check for operational fire extinguishers and service tags
- Test fire alarms and smoke detectors for function
Workstation Ergonomics
- Review seating posture and height adjustment availability
- Ensure monitors are positioned at eye level
- Verify keyboards and mice are ergonomic and accessible
- Identify tripping hazards near desks or cables
Housekeeping and Cleanliness
- Confirm common areas are free of clutter and spills
- Inspect janitorial closets and cleaning supply storage
- Check for overflowing waste bins or recyclables
- Ensure cleaning logs are up to date and verified
Hazard Identification & Reporting
- Check if hazard signage is displayed where required
- Review incident report records and near-miss logs
- Ensure first aid kits are stocked and accessible
- Verify that emergency contact lists are visible