Noblelift Intelligent Equipment Co Electric JS35 – Yearly Maintenance Checklist

Comprehensive annual inspections to maximize forklift lifespan and ensure safety compliance.

Comprehensive Visual Inspection

  • Inspect entire forklift for structural integrity and corrosion.
  • Check paint and surface protection.

Battery and Electrical System

  • Perform battery capacity testing.
  • Inspect and replace battery cables if necessary.

Tyres and Wheels

  • Inspect tyres for tread wear and replace if required.
  • Check wheel bearings and hubs.

Forks and Mast Assembly

  • Conduct non-destructive testing (NDT) on forks and mast.
  • Inspect mast bearings and rollers; replace or service as needed.

Hydraulic and Fluid Systems

  • Drain and replace hydraulic fluid.
  • Replace hydraulic filters and seals.

Brake and Steering Systems

  • Inspect brake pads, rotors, and drums; replace as needed.
  • Perform full steering system check.

Safety and Emergency Equipment

  • Verify the functionality of all safety interlocks and emergency systems.
  • Ensure fire extinguisher is serviced and certified.

Operational Performance Testing

  • Conduct full load testing and capacity verification.
  • Assess operational response including lift, tilt, and travel controls.

Documentation & Compliance

  • Complete annual maintenance records.
  • Review compliance documentation for accuracy.

Cooling and Ventilation Systems

  • Inspect and clean cooling system components.
  • Check ventilation fans for proper operation and replace if necessary.

Cab and Operator Station

  • Inspect seat and restraint systems for wear and functionality.
  • Verify proper operation of all control systems and displays.