Battery & Electrical System
- Check battery charge and connections.
- Inspect for corrosion or damage.
- Verify charger operation.
- Check cable integrity and insulation.
Hydraulic System Inspection
- Inspect hydraulic fluid levels.
- Check for leaks and hose damage.
- Test hydraulic controls operation.
- Examine cylinders and seals for wear.
Tyres & Wheels
- Check tyre pressure and tread depth.
- Inspect wheels for damage or corrosion.
- Verify lug nuts are secure.
- Ensure wheel bearings operate smoothly.
Fork & Mast Assembly
- Inspect forks for wear, bends, or cracks.
- Lubricate mast chains and check tension.
- Check mast rollers and bearings.
- Verify carriage locks and alignment.
Safety Systems & Controls
- Test horn, alarms, and warning lights.
- Check emergency stop functionality.
- Inspect seatbelts and restraints.
- Ensure overhead guard integrity.
Operational Checks
- Test steering responsiveness.
- Verify braking effectiveness.
- Check acceleration and deceleration.
- Ensure smooth directional control.
Documentation & Compliance
- Complete daily inspection records.
- Report any defects immediately.
- Verify operator certification.
- Ensure data plate visibility and accuracy.