AI Vision Camera

Transform maintenance with AI-powered visual inspection. Detect equipment defects in real-time, monitor asset conditions continuously, and ensure safety compliance—reduce manual inspection time by 80%.

AI Vision Camera

Trusted by over 1000+ clients across the world

brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands

Intelligent Detection Process

6-Step AI Vision Workflow

From camera capture to automated work orders, streamline your visual inspection process with AI.

1
Capture
Camera Feed
2
Analyze
AI Processing
3
Detect
Find Defects
4
Classify
Severity Level
5
Alert
Notify Team
6
Action
Create WO

Smart Detection

AI-Powered Defect Detection

Our AI analyzes visual data in real-time to detect cracks, corrosion, leaks, wear patterns, and other equipment defects with 99%+ accuracy. Catch problems before they cause failures.

Crack Detection

Identify hairline cracks and fractures invisible to naked eye.

Corrosion Analysis

Detect rust, oxidation, and surface degradation early.

Leak Detection

Spot fluid leaks, stains, and moisture accumulation.

Wear Pattern Analysis

Track wear progression on belts, bearings, and parts.

Thermal Anomalies

Detect overheating components with thermal imaging.

99%+ Accuracy

Industry-leading detection accuracy with minimal false positives.

AI Defect Detection
Real-time analysis

Defects detected by AI in last 24 hours

Crack Detected
Pump Housing - Unit #12
Critical
Overheating
Motor Bearing - Line 3
High
Oil Leak
Hydraulic Cylinder - Bay 5
Medium
AI Confidence: 99.2% • 0 false positives today

Live Monitoring

24/7 Real-Time Visual Monitoring

Deploy AI cameras across your facility for continuous equipment monitoring. Our system watches your assets around the clock, detecting issues the moment they appear.

Multi-Camera Support

Connect unlimited cameras across multiple locations.

Live Video Feed

Stream real-time video with AI overlay annotations.

Motion Detection

Trigger recording when unusual motion is detected.

Cloud Recording

Store footage securely in the cloud for review.

Zone Monitoring

Define specific zones for focused inspection areas.

Night Vision

Monitor equipment in low-light conditions with IR.

Live Camera Grid
CAM-01 Live
CAM-02 Live
CAM-03 Alert !
CAM-04 Live
Monitoring Status
Online 24
Offline 0
Alerts 3
Uptime 99.9%

Safety AI

Safety & Compliance Monitoring

AI vision ensures workplace safety by monitoring PPE compliance, detecting hazardous conditions, and alerting supervisors to violations in real-time. Stay OSHA compliant effortlessly.

PPE Detection

Verify hard hats, vests, gloves, and safety glasses.

Hazard Zone Alerts

Detect unauthorized personnel in danger zones.

Spill Detection

Identify liquid spills and chemical leaks instantly.

Fire & Smoke Detection

Early warning for fire hazards before alarms trigger.

Ergonomic Monitoring

Detect unsafe lifting and posture violations.

Compliance Reports

Auto-generate OSHA compliance documentation.

Safety Compliance
PPE & hazard monitoring

96%

Compliance Score
Today's safety rating
PPE Compliance Status
Hard Hat
98%
Safety Glasses
97%
Safety Vest
92%
Safety Boots
99%
2 Violations Today Missing vest detected at Bay 3

Auto Work Orders

Automated Work Order Creation

When AI detects a defect, it automatically creates a work order with the detected issue, photos, location, and severity. No manual data entry—your team gets notified instantly.

Auto WO Generation

Create work orders automatically when defects found.

Photo Evidence

Attach AI-captured images with annotations.

Priority Assignment

AI sets priority based on defect severity.

Asset Linking

Auto-link to the correct asset based on camera zone.

Team Notifications

Instantly notify assigned technicians via mobile.

SLA Tracking

Monitor response times against service level targets.

AI-Generated Work Order
Auto Created
WO-AI-2025-001
Critical
Crack Detected - Pump Housing Unit #12
Pump-012
Building A, Bay 3
AI_Detection_001.jpg Captured 2 mins ago • With annotations
Notification Sent John Smith assigned • Notified via push

Predictive AI

Predictive Maintenance Analytics

AI learns from visual patterns to predict when equipment will fail. Track degradation over time, forecast maintenance needs, and prevent unexpected downtime with data-driven insights.

Failure Prediction

Predict equipment failures days or weeks in advance.

Trend Analysis

Track wear progression and degradation patterns.

Health Scoring

AI-generated health scores for every asset.

RUL Estimation

Estimate Remaining Useful Life of components.

Maintenance Windows

Recommend optimal maintenance timing.

Cost Optimization

Balance maintenance cost vs. failure risk.

AI Asset Health Scores
85%
Pump-012
62%
Motor-005
38%
Conv-008
AI Predictions
Conveyor Belt Conv-008 Failure predicted in 5 days
Urgent
Motor Bearing Motor-005 Replacement in 2 weeks
Soon
Pump Seal Pump-012 Healthy for 3+ months
Good

Getting Started

How to Deploy AI Vision Cameras

Setting up AI vision cameras is straightforward. Our team helps you position cameras, configure detection models, and train the AI for your specific equipment.

1
Install Cameras

Position cameras at strategic points monitoring critical equipment.

2
Connect to OxMaint

Link cameras to OxMaint via WiFi, Ethernet, or cellular connection.

3
Train AI Models

Customize detection models for your specific equipment types.

✓
Start Monitoring

AI begins real-time monitoring and automated defect detection.

Deployment Steps:

Install IP cameras or use mobile devices as cameras

Connect cameras to your network and OxMaint cloud

AI learns your equipment and starts detecting issues

Receive automated alerts and work orders

Pro Tip
Start with 2-3 cameras on critical equipment, then expand as you see ROI.

Integrated Modules

AI Vision Connected to Your CMMS

AI vision insights seamlessly integrate with work orders, assets, inventory, and your entire maintenance workflow.

Work Orders
Auto WO creation
Assets
Health monitoring
Safety
PPE compliance
Analytics
Predictive insights
Notifications
Instant alerts
Locations
Zone monitoring
Inspections
Visual audits
Team
Auto-assignment

We are proud of our results

We bring AI vision to make maintenance smarter and safer.

target

80%

Reduced Inspection Time

bar-chart

99%

Detection Accuracy

employees

60%

Less Unplanned Downtime

"AI cameras caught a bearing failure 3 days before it would have caused a line shutdown. The ROI was immediate."

AutoParts Manufacturing

Manufacturing

"PPE compliance went from 85% to 98% after deploying AI vision. The automatic alerts changed behavior."

SafetyFirst Construction

Construction

"We reduced manual inspections by 80%. The AI finds issues we would have missed."

PetroChem Industries

Oil & Gas

"Automated work orders from AI detection save our team 10 hours per week in data entry."

FoodProcess Corp

Food & Beverage

FAQ

Frequently Asked Questions

Everything you need to know about OxMaint's AI Vision Camera capabilities.

OxMaint AI Vision can detect a wide range of equipment defects including: cracks and fractures, corrosion and rust, oil and fluid leaks, wear patterns on belts and bearings, thermal anomalies and overheating, misalignment, loose components, surface degradation, and more. The AI continuously learns from your equipment to improve detection accuracy over time. We achieve 99%+ accuracy with minimal false positives.

OxMaint AI Vision works with standard IP cameras (ONVIF compatible), USB webcams, industrial cameras, thermal imaging cameras, and even smartphone cameras. We support resolutions from 720p to 4K. For best results, we recommend 1080p cameras with good low-light performance. Our team can advise on optimal camera placement and specifications for your specific use case.

OxMaint uses transfer learning to quickly adapt pre-trained models to your equipment. During setup, we collect baseline images of your equipment in normal condition. The AI then learns what "healthy" looks like and can detect deviations. You can also provide feedback on detections to improve accuracy. Most deployments reach 95%+ accuracy within the first week of operation.

Yes! OxMaint AI Vision includes safety compliance features that detect PPE usage including hard hats, safety vests, safety glasses, gloves, and safety boots. It can also monitor hazard zones, detect unauthorized access, identify spills, and watch for unsafe behaviors. All violations are logged and can trigger instant alerts to supervisors. This helps maintain OSHA compliance and creates a safer workplace.

OxMaint AI Vision offers both cloud and edge processing options. With cloud processing, video is sent to our servers for AI analysis—this requires internet connectivity. For sites with limited connectivity or strict data policies, we offer edge processing where AI runs locally on your network. Edge devices can buffer alerts and sync when connectivity is restored. Both options provide the same detection capabilities.

See with AI vision today.

Deploy AI-powered cameras for real-time defect detection, safety monitoring, and predictive maintenance. Transform how you inspect equipment.

OxMaint is available to download from both App Store and Google Play Store.

iphone