Create digital checklists, conduct inspections, track incidents & ensure compliance 50% faster with OxMaint's AI-powered CMMS. Transform your inspection workflow from paper to digital—all from one powerful platform.
Everything you need for digital inspections. From checklists to incident reporting, each step ensures nothing is missed.
Replace paper forms with powerful digital checklists. Build comprehensive inspection templates with multiple sections, item types, and automated workflows that ensure nothing gets missed.
Organize checklist items into logical groups like Safety, Visual, Performance checks.
Pass/Fail, Yes/No, Numeric ranges, Text input, Multiple choice options.
Flag mandatory items that trigger work orders or alerts when failed.
Require photo evidence for specific items to ensure documentation.
Capture inspector signatures for compliance and accountability.
Define pass/fail thresholds and weighted scoring for overall results.
Let artificial intelligence do the heavy lifting. Synapse AI can automatically generate comprehensive inspection checklists based on your asset type, industry standards, and compliance requirements—saving hours of manual work.
Describe your asset and get a complete checklist with sections and items.
AI recommends items based on DOT, OSHA, IMO, and other regulations.
Get checklist items based on industry standards and common practices.
AI automatically flags safety-critical items that require attention.
AI suggests which items need photo documentation for evidence.
Get recommended acceptable ranges for pressure, temperature, etc.
"Create an inspection checklist for a MAN B&W 6S50ME-C marine diesel engine with IMO Tier III compliance"
Initiate inspections in seconds with our streamlined workflow. Select your asset, choose a checklist, configure environmental conditions, and start inspecting—all from your mobile device or desktop.
Search and select from your asset database with QR code scanning.
Choose from saved templates or create a new checklist on the fly.
Auto-capture GPS location or select from predefined locations.
Record temperature, humidity, weather conditions during inspection.
Assign inspection to yourself or other team members.
Start and complete inspections without internet connection.
Set it and forget it. Our smart reminder system ensures your team never misses a scheduled inspection. Configure daily, weekly, monthly, or custom recurrence patterns with automatic notifications.
Daily, weekly, monthly, quarterly, or custom recurrence patterns.
Push notifications, email alerts, and in-app reminders.
Notify supervisors if inspections are overdue or missed.
Assign reminders to specific inspectors or teams.
Configure how far in advance reminders are sent.
Sync with Google Calendar, Outlook, and other calendars.
Document safety incidents comprehensively with severity ratings, cost tracking, root cause analysis, and corrective actions. Ensure OSHA compliance and create a safer workplace.
Classify incidents as Low, Medium, High, or Critical severity.
Record estimated and actual costs associated with incidents.
Track equipment downtime caused by safety incidents.
Attach photos and documents to incident reports.
Create and track corrective action plans with due dates.
Generate OSHA-compliant incident reports and documentation.
Hydraulic hose burst on Excavator #EX-042 during operation. Immediate shutdown performed. No injuries reported.
Go beyond symptoms to find the real cause of failures. Link inspections, work orders, and incidents together to identify patterns and implement effective corrective actions that prevent recurrence.
Connect inspections, work orders, and incidents for full picture.
Built-in methodology to drill down to root causes.
Create action plans with assignees and due dates.
Identify recurring issues and failure patterns.
Document measures to prevent future occurrences.
Monitor if corrective actions actually resolved the issue.
DOT-compliant vehicle inspections before every trip.
OSHA safety inspections and hazard identification.
IMO and USCG compliant vessel inspections.
Routine maintenance inspections for machinery.
OxMaint supports multiple inspection types to help you maintain compliance, ensure safety, and track asset conditions across your organization.
Pre-built templates for DOT, FMCSA, OSHA, IMO, and USCG regulations.
Conduct inspections anywhere with iOS and Android apps, even offline.
Capture and attach photos directly to inspection items for proof.
OxMaint's inspection management integrates seamlessly with all maintenance modules for complete operational visibility.
We bring solutions to make inspections easier for our customers.
Faster Inspections
Compliance Rate
Customer Satisfaction
"OxMaint's inspection module has transformed how we conduct safety audits. The digital checklists and photo documentation make compliance tracking effortless."
SafetyFirst Inc.
Construction
"The AI-powered checklist generation is incredible. We created comprehensive marine inspection checklists in minutes that used to take hours."
Oceanix Maritime
Maritime
"Automated reminders ensure our fleet inspections are never missed. The mobile app works perfectly offline in remote areas."
TransGlobal Fleet
Transportation
"Root cause analysis linked to inspections and work orders gives us complete visibility into equipment failures. Highly recommended!"
PowerGrid Utilities
Utilities
Everything you need to know about OxMaint's inspection management capabilities.
Inspection management software is a digital solution that helps organizations create, schedule, conduct, and track asset inspections. It replaces paper-based checklists with digital forms, automates reminders, tracks compliance, and provides analytics on inspection performance.
Yes, OxMaint allows you to create fully customizable inspection checklists with multiple sections, various item types (pass/fail, numeric, text), photo requirements, digital signature collection, and custom scoring methods. You can also use our AI-powered Synapse feature to automatically generate comprehensive checklists.
Yes, OxMaint includes comprehensive incident reporting with severity ratings (low, medium, high, critical), priority levels, estimated cost tracking, downtime recording, weather conditions, operator information, equipment damage documentation, and photo attachments.
Yes, OxMaint's mobile apps for iOS and Android support offline inspections. You can download checklists, conduct inspections, capture photos, and collect signatures without an internet connection. All data automatically syncs when connectivity is restored.
OxMaint supports various compliance standards including DOT (Department of Transportation), FMCSA (Federal Motor Carrier Safety Administration), OSHA (Occupational Safety and Health Administration), IMO (International Maritime Organization), USCG (U.S. Coast Guard), and industry-specific regulations.
Create digital checklists, conduct inspections and track compliance from anywhere. Perfect for safety and maintenance teams.
OxMaint is available to download from both App Store and Google Play Store.
