GPS & Telematics Integration for Fleet Management

Connect Geotab, Samsara, Verizon Connect, and 25+ telematics providers to automatically sync vehicle locations, odometer readings, engine hours, and geofence alerts every 30 seconds. Eliminate manual mileage entry and schedule maintenance by actual GPS-verified usage.

1200k+ Active users Real-time location tracking

Live GPS Tracking Dashboard

245

Vehicles Tracked

187,452

Total Miles (Month)

8,247

Engine Hours

12

Geofence Alerts

Live GPS Activity

Moving Truck #2451 - 67,842 mi, 2,145 hrs

Idle Van #1204 - Idle 15min at depot

Stopped Truck #3567 - Parked at shop

Zero

Manual Odometer Entry

25+

Telematics Providers

30 Sec

Location Update Interval

100%

Auto Odometer Sync

Supported Telematics Providers

25+ Leading GPS Platforms

Plus Fleetmatics, Omnitracs, Trimble, AT&T Fleet Complete, Spireon, and more

Simple Process

How GPS Integration Works

Seamless vehicle location and usage data flow from GPS to maintenance scheduling

Track
Live GPS Coordinates
Import
Odometer & Hours
Sync
Auto Updates

Real-Time GPS Location & Odometer Sync

Connect to your telematics provider's API to automatically import vehicle positions, odometer readings, and engine hours every 30 seconds. GPS coordinates update continuously on live maps with exact locations and street addresses. Odometer readings sync automatically eliminating manual entry errors. Engine hour meters update for equipment-based service intervals. Vehicle status shows moving, idle, or stopped with speed and direction.

  • 30-second GPS position updates
  • Automatic odometer sync
  • Engine hours tracking
  • Live vehicle status monitoring

Geofencing Alerts & Complete Trip History

Create virtual boundaries around shop locations, customer sites, or restricted zones to trigger automatic alerts when vehicles enter or exit. Geofence arrivals at your shop automatically check vehicles in for scheduled service. Departure alerts notify when vehicles leave unauthorized areas. Complete trip history stores every route with timestamps, start/end locations, distance, and speed. Verify service calls and investigate unauthorized use with historical GPS data.

  • Custom geofence boundaries
  • Auto shop arrival check-in
  • Unauthorized zone alerts
  • Complete route history
Create
Virtual Boundaries
Monitor
Entry/Exit Events
Alert
Instant Notifications

Usage-Based Maintenance Scheduling

Use GPS odometer and engine hours to automatically schedule preventive maintenance by actual usage. Service reminders trigger at mileage thresholds (5,000 miles, 10,000 miles) or engine hour targets (250 hours). Route nearby vehicles to the closest shop for efficiency. Correlate GPS routes with maintenance needs to identify terrain impacts. Track daily mileage, idle time, and operating hours to optimize fleet size.

  • Mileage-based service triggers
  • Engine hour PM scheduling
  • Location-based shop routing
  • Vehicle utilization analytics

GPS Maintenance Analytics

67,842

Current Odometer Service Due

2,145

Engine Hours

187,452

Total Miles (Month) +8% vs LM

Why Choose Oxmaint

Why GPS Integration

1

Eliminate Manual Odometer Entry

Stop wasting 10-15 hours weekly collecting odometer readings from drivers and typing mileage into spreadsheets. GPS automatically syncs exact odometer readings every 30 seconds with 99.9% accuracy versus 85-90% from handwritten logs. Service intervals trigger at precise mileage thresholds without relying on driver reports. Eliminate missed preventive maintenance from forgotten odometer checks.

2

Know Exact Vehicle Locations

See real-time GPS locations on live maps showing current position, movement status, speed, and heading. Instantly locate nearest vehicles when maintenance is due or breakdowns occur. Geofence your shop to auto-check vehicles in for scheduled service. Route mobile technicians to disabled vehicles using exact coordinates. Track arrivals at customer sites to verify service completion.

3

Optimize Maintenance by Usage Patterns

Analyze GPS route history to see if vehicles operate on highways (lower brake wear) or city streets (frequent stops requiring more brake service). Correlate terrain with failures—mountainous regions need more brake service, desert operations require additional cooling maintenance. GPS idle time identifies vehicles needing frequent oil changes. Use utilization metrics to optimize PM schedules and fleet size.

Powerful Features

Complete GPS Capabilities

Everything you need for comprehensive GPS tracking and location-based fleet management

Real-Time GPS Tracking

Live vehicle positions updated every 30 seconds with street-level accuracy, movement status, speed, heading, and address lookup for complete fleet visibility.

Automatic Odometer Sync

Real-time odometer readings from GPS devices automatically update vehicle mileage eliminating manual entry, with historical odometer trend tracking and validation.

Engine Hours Monitoring

Track accumulated engine hours from telematics for equipment-based maintenance intervals, idle time analysis, and accurate utilization metrics.

Geofencing Alerts

Create virtual boundaries around locations and receive instant alerts when vehicles enter or exit zones, including automatic shop arrival check-in for scheduled service.

Complete Trip History

Historical route data with start/end locations, timestamps, distance traveled, average speed, and idle time for every trip with unlimited retention.

Mileage-Based PM Scheduling

Automatic preventive maintenance reminders triggered by actual GPS odometer readings at configurable mileage intervals (3K, 5K, 10K, 25K miles).

Driver Behavior Scoring

Import telematics driver scores for harsh braking, rapid acceleration, speeding, and cornering events that correlate with increased maintenance needs.

Fleet Utilization Analytics

Daily mileage, idle time percentage, operating hours, and usage patterns to identify underutilized vehicles and optimize fleet size.

Diagnostic Fault Code Alerts

Automatic import of vehicle diagnostic trouble codes (DTCs) from advanced telematics systems for proactive maintenance problem identification.

More Integrations

Related Integrations

Explore other powerful integrations to enhance your CMMS

Fuel Card Integration

Combine GPS odometer data with fuel card transactions to validate MPG and detect fuel theft through location verification.

Learn More

OEM Telematics

Supplement GPS tracking with factory-installed telematics for comprehensive vehicle diagnostics and fault codes.

Learn More

Accounting Integration

Use GPS mileage data for accurate cost-per-mile calculations and automated expense allocation in your accounting system.

Learn More

FAQ

Frequently Asked Questions

Everything you need to know about GPS & telematics integration

Oxmaint integrates with 25+ GPS and telematics providers including Geotab, Samsara, Verizon Connect, GPS Insight, Fleet Complete, Teletrac Navman, Omnitracs, Trimble, AT&T Fleet Complete, Spireon, Zonar, Azuga, and CalAmp. We support direct API integration for real-time data sync and file-based imports for providers without API access. Integration captures GPS coordinates, odometer, engine hours, vehicle status, speed, geofence events, trip history, and driver behavior scores. For advanced systems, we import diagnostic codes, fuel levels, and engine metrics.

GPS devices track odometer readings directly from the vehicle's computer (OBD-II/CAN bus), transmitting current mileage to Oxmaint every 30-60 seconds. This eliminates manual driver logs or technician walk-arounds. Odometer syncs automatically in real-time, accurate to 0.1 miles. When PM intervals approach (oil change at 70,000 miles, vehicle at 69,500 miles), service reminders trigger automatically based on GPS-verified mileage. Historical odometer data with timestamps allows you to audit changes, detect tampering, and generate accurate mileage reports.

Geofences are virtual boundaries around locations like your shop, customer sites, or restricted areas. Draw circular geofences by radius (500-foot around shop) or polygon for irregular boundaries. When GPS-tracked vehicles enter zones, automatic actions trigger: Shop Arrival auto-checks vehicles in for scheduled maintenance, notifying technicians. Customer Site validates service completion by confirming vehicles were at job locations. Unauthorized Zone sends instant alerts for restricted areas or after-hours locations. Multiple geofences can overlap with different actions. Historical logs show all entry/exit events with timestamps and duration.

Yes. GPS provides usage metrics that optimize maintenance beyond standard schedules. Actual Mileage schedules service by real miles driven rather than estimates. Engine Hours bases maintenance on operating hours for vehicles with significant idle time (delivery trucks, emergency vehicles). Route Terrain uses GPS history to adjust intervals—highway vehicles need less frequent brake work than city delivery routes. Idle Time identifies vehicles needing more frequent oil changes. Geographic Environment shows dusty conditions requiring frequent air filter changes or corrosive coastal areas needing undercarriage inspections. Utilization-Based PM adjusts frequency for underutilized vehicles while ensuring active assets receive timely service.

Oxmaint provides comprehensive GPS reports combining location with maintenance metrics: Vehicle Location History with complete routes, start/end points, distance, speed, and idle time. Odometer Accuracy Reports comparing GPS mileage to manual entries to identify discrepancies. Geofence Activity Logs documenting zone entries/exits with timestamps. Maintenance by Location showing where vehicles were when service became due. Fleet Utilization Analysis tracking daily mileage, idle percentage, and operating hours. Driver Location Validation matching GPS to claimed service locations. Shop Arrival Patterns analyzing when vehicles arrive for service. Unauthorized Use Reports flagging off-hours activity. All reports export to Excel, PDF, or CSV with map visualizations.

GPS integration typically completes in 3-5 business days. Process includes: Initial Assessment (1 day) identifying provider, device types, and data access. API Connection Setup (1-2 days) obtaining credentials and configuring secure authentication. Vehicle Matching (1 day) mapping GPS device IDs to fleet vehicles. Geofence Configuration (1 day) creating boundaries around shop locations and service areas. Historical Data Import (1 day optional) loading past 90 days of GPS history. Testing and Validation (1 day) verifying odometer sync, geofence alerts, and location updates. For Geotab and Samsara with direct API, integration is often live within 2-3 days.

Ready to Eliminate Manual Odometer Entry with GPS Automation?

Join thousands of fleets using GPS to automatically track mileage, schedule maintenance by actual usage, and gain complete vehicle location visibility. Connect your Geotab, Samsara, or Verizon Connect telematics to Oxmaint today.