Every school building manager is quietly running two safety programs on the same water heater, and they pull in opposite directions. Set the tank too cool, and Legionella bacteria — the organism behind Legionnaires' disease — multiplies happily in
Oxmaint helps K-12 districts, universities, community colleges and independent schools run work orders, preventive maintenance, campus asset registers, safety inspections and school bus servicing — from one platform tuned to the academic calendar.
Open WOs
PM On-Time
Buildings
Buses PM'd
Teacher request · Classroom 208 lighting
Portal submission · Routed to custodial
Playground check · Elementary East
Monthly safety walk complete · Passed
Bus #47 mileage PM at 12K
Auto-created · Parts kit staged
Dorm Hall B · Summer turnover PM
Batch WOs generated · Break window
Rolls out without disrupting instructional time — from paper request slips to one CMMS covering every campus, classroom, playground and bus.
QR-label every building, dorm, gym, playground, lab and bus.
Calendar, break, meter and deadline PM per asset class, plus the staff request portal.
Integrate the BMS, bus telematics and your district ERP.
PM compliance, backlog and cost per campus — board-ready exports on demand.
Teachers, coaches, dorm residents and food-service managers submit through a simple form, and the request arrives tagged to the right building, room and team — custodial, HVAC, plumbing, electrical, grounds or bus shop. Crews pick up work orders on mobile and close them with photo evidence, while directors see every open request across every campus in one queue.
Teachers, staff, dorm residents, coaches
Custodial, trades, grounds, bus shop
Close from any classroom, field, garage
Every request across every campus
Room 208 · Teacher-submitted · Priority 2
Athletic field 2 · Coach-submitted
Res Hall B, Rm 304 · RA-submitted
Middle School kitchen · Priority 1
Every asset is registered by campus, building, floor, room and system, with model, install date, warranty and PM cadence attached. An elementary boiler, a playground structure, a gym rooftop unit, a university fume hood and a bus in the yard all sit in the same register — and any crew member scans a QR label to see full history, open work orders and next scheduled PM.
Classrooms, playgrounds, buses
Register mirrors real school layout
Every WO, PM, cost per asset
Bond-ready backlog reporting
Classrooms, offices, libraries, labs
Dorm rooms, common areas, laundry
Gyms, pools, fields, tracks, courts
Age-graded structures, surfacing, fencing
VIN-tagged units, mileage & PM tracked
A monthly playground walk is completed on mobile against the specific structure, with photos, e-signature and any deficiency auto-creating a corrective work order. Fire inspections, boiler certifications, elevator checks, backflow testing and ADA surveys all attach to the responsible asset — and when an insurer or state department asks, records filter by campus, standard or date and export in seconds.
Age-graded checks, photo evidence
Drills, alarms, sprinklers, extinguishers
EPA-driven checks recorded per building
Filter by campus, standard or date
All 12 playgrounds current this month
Drills, alarms, sprinklers on schedule
Lead testing, radon, air quality logged
Building-by-building walkthroughs current
Work orders, PM schedules, asset registers, spare parts, safety inspections, predictive alerts, bus servicing and compliance records in one CMMS.
Every teacher request, PM task and safety inspection in one queue — auto-routed by team, closed on mobile with photo evidence.
Calendar, academic-break, meter and deadline PM per asset class — WOs generate with SOPs and team assignments attached.
QR-tag every classroom, dorm, gym, playground, lab and bus — organised by campus, building and room, one scan from full history.
Custodial supplies, filters, belts, lamps and bus parts across school storerooms — min-max levels and reservation on every PM.
Mobile checklists for playground walks, fire drills, boiler inspections and ADA surveys — failed items auto-create a corrective WO.
BMS and sensor signals ingested — boiler, chiller and rooftop-unit drift becomes a WO before instructional days are disrupted.
Every bus by VIN with mileage-based PM, digital pre- and post-trip inspections and brake and tire tracking — same CMMS as the campus.
PM compliance, deferred maintenance backlog, request response times and cost per campus — board-ready exports on demand.
A K-12 district, a university, a multi-site community college and an independent boarding school — four typical deployments.
The Situation
A K-12 district ran multiple campuses plus dozens of buses. Teacher requests arrived by email and sticky note, playground walks lived in a binder, summer PM was planned on a whiteboard, and deferred maintenance grew invisibly.
How Oxmaint Helped
Every school and bus became an asset. Teachers submitted through a portal that routed by team, playground inspections went digital, summer PM was batch-generated, and board reports came from dashboards.
One district CMMS
No more sticky notes
Backlog visible
Every teacher, secretary and coach submitted a form that arrived tagged to the right school, room and team.
Deep cleans, roof repairs, HVAC overhauls and floor refinishing batch-generated the week schools closed, with parts and crews assigned.
Every bus VIN-registered with mileage-based PM and digital pre-trip inspections — the yard used the same tool as buildings.
Backlog, PM compliance and response times pulled from dashboards for every board meeting and bond planning cycle.
The Situation
A university facilities office maintained an academic core, residence halls, specialty labs, an arts complex and athletics — each on a different PM cadence. Semester dorm turnovers demanded fast work, and student requests crawled through housing staff.
How Oxmaint Helped
Every building was catalogued by category with its own PM templates. A resident-facing portal replaced the housing-staff bottleneck, and semester-break turnover work was pre-planned in the CMMS.
One campus CMMS
Direct-to-work-order
Pre-planned in software
Academic, residential, athletic and arts buildings sat in distinct categories, each with the PM cadence its type needed.
Students filed requests that arrived tagged to the right dorm, room and trade instead of chaining through RAs.
Residence-hall turnover was batch-planned — paint, plumbing, HVAC and cleaning WOs generated per room before move-out.
Boiler, chiller and rooftop-unit signals from the campus BMS flowed in — drift became a WO before classes were disrupted.
The Situation
A community college system ran a main campus plus satellite locations, each facilities lead using different PM cadences, vendors and reporting. Leadership couldn't compare sites, and budgeting relied on gut feel.
How Oxmaint Helped
Every campus became a site under one system-wide setup — shared PM templates, standard checklists and consistent asset categories. Local leads kept autonomy; leadership got cross-campus visibility.
One CMMS
Applied network-wide
Cross-site comparison
Every campus its own site under a shared configuration — main campus and satellites on consistent asset and PM standards.
PM templates built once and applied everywhere — satellites ran the same standard of preventive maintenance as the main campus.
Fire safety, ADA and air quality checks standardised — leadership audited any campus directly, not through site leads.
Facility spend, PM compliance and backlog compared campus-to-campus, surfacing which sites needed capital first.
The Situation
An independent boarding school maintained an academic building, boarding houses, a chapel, dining hall, athletic centre and extensive grounds — with students on site most of the year and trustees expecting consistent facility metrics.
How Oxmaint Helped
Every building and outdoor asset was registered with distinct academic, boarding house and grounds workflows. Housemasters submitted from a mobile portal, crews pulled WOs on the app, and trustee reporting drew from dashboards.
Registered in CMMS
Boarding house issues
Board reports on demand
Each boarding house catalogued with rooms, common areas and shared facilities, so submissions arrived tagged to the exact location.
Playing fields, gardens and chapel grounds sat in the same register as buildings, with seasonal PM on a residential calendar.
Fire drill logs, extinguisher checks and health-and-safety walks captured against the specific building for audit review.
Monthly and termly reports came straight from Oxmaint — facility health, PM compliance and backlog ready for governance.
Oxmaint connects with building management systems, school bus telematics and district ERP platforms — equipment, cost and PM data move without duplicate entry.
Explore All IntegrationsK-12 districts, public and private universities, community college systems, and independent day and boarding schools. Multi-site from the ground up, one deployment handles a single school or a whole district — classrooms, residence halls, playgrounds and buses in the same register.
Yes. The register runs district → campus → building → floor → room → sub-asset, with academic buildings, residence halls, gyms, libraries, labs and playgrounds in the same hierarchy. Each asset carries its own PM cadence, and leadership sees cross-campus performance in one filter.
Yes. Academic-break scheduling is a distinct trigger type — WOs batch-generate per building at the start of summer, winter or spring break with parts reserved and crews assigned. Roof repairs, floor refinishing and HVAC overhauls get planned in software, with completion tracked day by day.
Yes. Teachers, staff, coaches, dorm residents and food-service managers submit a simple digital form. Each request arrives tagged to the right campus, building and room, then auto-routes to custodial, HVAC, plumbing, electrical, grounds or the bus shop — sitting in the same queue as PM and safety inspections.
Yes. Buses are registered by VIN alongside classrooms and playgrounds — mileage-based PM, digital pre- and post-trip inspections, tire and brake tracking and DOT-ready records. Transport uses the same mobile app as buildings and grounds, and fleet uptime shows in the same dashboards.
Yes. Playground safety walks, fire drill and extinguisher records, air quality and water testing logs, ADA surveys and state-mandated inspections each attach to the asset they protect with e-signature, photos and time stamp — filterable by campus, standard or date and exportable in seconds.
Join 1,000+ maintenance teams running work orders, PM schedules, campus asset registers, safety inspections and bus servicing in one CMMS.