NVIDIA Server Integration

Connect your NVIDIA DGX, HGX, and EGX AI infrastructure to OxMaint's intelligent CMMS. Monitor GPU health in real-time via DCGM integration, predict hardware failures 7-21 days ahead, and maximize uptime for your AI workloads. Reduce GPU downtime by 45%.

NVIDIA Server

Trusted by over 1000+ clients across the world

brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands

Enterprise Integration

How NVIDIA DCGM Works with OxMaint

OxMaint integrates directly with NVIDIA's Data Center GPU Manager (DCGM) to collect real-time telemetry from your entire GPU fleet. Our AI analyzes 100+ metrics per GPU to predict failures, automate maintenance, and maximize uptime for AI workloads.

NVIDIA DCGM → OxMaint AI Pipeline

NVIDIA GPUs
DGX / HGX / EGX
DCGM Exporter
100+ Metrics
OxMaint API
Data Ingestion
AI Analysis
Predictions
Auto Actions
Work Orders

Kubernetes Native

DCGM Exporter container with Prometheus-compatible endpoints for K8s GPU clusters.

Bare Metal

Direct DCGM API integration for standalone DGX systems and HPC clusters.

Enterprise Security

TLS encryption, RBAC, audit logging. SOC 2 Type II compliant.

Live Monitoring

GPU Health Monitoring via DCGM

OxMaint integrates with NVIDIA's Data Center GPU Manager (DCGM) to provide comprehensive health monitoring across your entire GPU fleet. Track 100+ metrics per GPU including temperature, power consumption, memory utilization, clock speeds, and error counts—all in real-time.

GPU Temperature

Core, memory, and board thermal monitoring.

Power Consumption

Track watts per GPU and total rack power.

Memory Utilization

HBM usage, bandwidth, and allocation.

ECC Error Tracking

Correctable & uncorrectable memory errors.

NVLink Health

Inter-GPU interconnect status & bandwidth.

XID Error Detection

NVIDIA error codes decoded & alerted.

GPU Health Dashboard
Live
DGX-01 GPU TEMPERATURES (H100 SXM)
GPU 0 67°C
GPU 1 65°C
GPU 2 69°C
GPU 3 74°C
GPU 4 66°C
GPU 5 68°C
GPU 6 67°C
GPU 7 70°C
5.6 kW
Power Draw
78%
HBM Usage
94%
Utilization
ECC Memory Status
No uncorrectable errors detected
Healthy

Telemetry Categories

100+ DCGM Metrics Monitored

OxMaint captures comprehensive GPU telemetry organized into key categories. Each metric is tracked historically, analyzed for anomalies, and used to drive predictive maintenance and automated alerts.

Thermal Metrics

GPU core, memory, board temperatures.

Power Metrics

Current, peak, limits, efficiency.

Utilization Metrics

SM, memory, encoder/decoder usage.

Reliability Metrics

ECC errors, XID events, throttling.

DCGM Metric Categories
Thermal
Temp, Throttle, Fan
Power
Watts, Limits, PUE
Thermal Metrics
GPU Core Temp
Memory Temp
Throttle Events
Board Temp
Reliability Metrics
ECC SRAM Errors
ECC DRAM Errors
XID Errors
Page Retirements

Artificial Intelligence

AI-Powered Predictive Maintenance

OxMaint AI analyzes historical GPU telemetry patterns to predict hardware failures 7-21 days in advance. Anticipate GPU degradation, memory failures, thermal issues, and power supply problems before they impact your AI workloads.

GPU Degradation

Detect declining performance patterns.

Memory Failure

ECC error trends predict HBM issues.

Thermal Anomalies

Identify cooling system degradation.

Power Supply Health

Predict PSU failures from power patterns.

NVLink Degradation

Interconnect bandwidth trend analysis.

Workload Correlation

Link AI jobs with hardware stress.

AI Predictive Insights
Thermal Throttling Risk
Critical

DGX-02 GPU #3 shows progressive temperature increase (+2.5°C/week). Cooling system inspection recommended.

Predicted throttle: 5-7 days
HBM Memory Degradation
Warning

DGX-03 GPU #7 elevated correctable ECC errors (127 → 342 in 30 days). Memory approaching end of life.

Replace within: 3 weeks
Preventive Maintenance Due
Routine

DGX-01 approaching 10,000 GPU-hours. Firmware update and thermal paste refresh recommended per NVIDIA guidelines.

Optimal window: 2 weeks

Infrastructure Monitoring

Thermal & Power Management

Modern NVIDIA GPUs can draw 700W+ each, with DGX systems pushing 6-10kW per node. OxMaint monitors thermal conditions across your entire cooling infrastructure—from direct-to-chip liquid cooling to CRAC units—ensuring optimal temperatures and preventing thermal throttling.

Liquid Cooling

CDU flow rates, coolant temp, pressure.

Hotspot Detection

AI identifies thermal anomalies early.

HVAC Integration

CRAC/CRAH unit health tracking.

PUE Tracking

Power Usage Effectiveness monitoring.

Thermal Management Console

18°C

Cold Aisle Temp

34°C

Hot Aisle Temp
COOLING INFRASTRUCTURE
CDU-01 (Liquid Cooling)
Flow: 45 GPM | Delta T: 12°C | Pressure: 28 PSI
Optimal
CRAC Unit A
Supply: 16°C | Return: 24°C | Fan: 85%
Running
CRAC Unit B
Supply: 17°C | Return: 26°C | Fan: 92%
Filter Due
Power Usage Effectiveness
Industry-leading efficiency

1.18

Full Ecosystem

Supported NVIDIA Systems

OxMaint integrates with the complete NVIDIA AI infrastructure ecosystem—from DGX SuperPOD clusters to EGX edge deployments. Full support for data center, cloud, and edge GPU environments across all current NVIDIA architectures.

DGX Systems

B200, B300, H100, H200, A100, Station.

HGX Platforms

HGX B200, B300, H100, H200.

SuperPOD & BasePOD

Enterprise-scale AI infrastructure.

EGX & Edge AI

EGX Platform, IGX Orin, Jetson.

NVIDIA Ecosystem Support
DGX Systems
DGX B200
DGX B300
DGX H100
DGX H200
DGX A100
DGX Station
SuperPOD & Enterprise
DGX SuperPOD
DGX BasePOD
HGX Platform
OEM Partner
EGX & Edge AI
EGX Platform
IGX Orin
Jetson AGX
T4/L4/L40S

Intelligent Automation

Automated Work Order Generation

When GPU anomalies are detected or failures predicted, OxMaint automatically creates detailed work orders with full diagnostic context. Reduce mean time to repair by 60% with intelligent automation that gets the right information to the right technician immediately.

Auto-Triggered WOs

GPU alerts create tickets automatically.

Diagnostic Attachments

DCGM logs, error codes, telemetry.

Priority Routing

Critical issues to senior GPU techs.

Parts Forecasting

Auto-suggest replacement components.

Auto-Generated Work Order
Critical
#WO-GPU-2847 Auto-created 2 min ago
GPU Thermal Alert - DGX-02 GPU #3
Temperature exceeded 80°C threshold (currently 82°C)
ATTACHED DIAGNOSTICS
DCGM_diag_20250102.log temp_history_7d.csv XID Error Report
AI-SUGGESTED ACTIONS
1 Inspect liquid cooling quick-disconnect for GPU #3
2 Check CDU flow rate to affected GPU position
3 Consider thermal paste reapplication if >8000 hrs
DC
David Chen
Sr. GPU Infrastructure Tech
Assigned

Closed-Loop Maintenance

From GPU Alert to Resolution

OxMaint connects GPU monitoring directly to maintenance—when DCGM detects an issue, the system automatically triggers corrective actions through your CMMS with full diagnostic context.

GPU Alert
DCGM triggers
AI Diagnosis
Root cause
Work Order
Auto-created
Repair
Tech dispatched
Verified
GPU healthy
60% Faster MTTR

Work orders include DCGM diagnostics, error logs, and suggested actions.

Full Traceability

Every GPU issue linked to root cause, repair history, and verification.

Continuous Learning

Historical data improves AI predictions and prevents recurring failures.

Proven GPU Infrastructure Results

AI infrastructure teams using OxMaint achieve measurable improvements in GPU uptime and efficiency.

target

45%

Less GPU Downtime

bar-chart

60%

Faster MTTR

employees

99.7%

GPU Fleet Uptime

"OxMaint predicted a GPU memory failure 12 days before it happened on our DGX SuperPOD. Saved us $180K in potential downtime costs."

Cloud AI Provider

256 H100 GPUs

"DCGM integration gives us complete visibility into our GPU cluster. We went from reactive 'something broke' calls to proactive maintenance."

Research University

HPC with 64 A100s

"We're a small team managing 3 DGX systems. OxMaint's automated work orders mean we don't need dedicated operations staff."

AI Startup

3× DGX H100 Systems

"Thermal management alerts caught a cooling issue before any GPUs throttled. Our LLM training jobs run uninterrupted now."

Enterprise AI Team

DGX BasePOD

FAQ

Frequently Asked Questions

Everything you need to know about OxMaint's NVIDIA server integration and GPU infrastructure maintenance.

OxMaint integrates with NVIDIA's Data Center GPU Manager (DCGM) via the DCGM Exporter, which exposes GPU metrics in Prometheus format. For Kubernetes environments, we use the official NVIDIA DCGM Exporter container. For bare-metal deployments, we support direct DCGM API integration or custom metric exporters. Setup typically takes 15-30 minutes per cluster with our guided configuration wizard.

OxMaint monitors 100+ GPU metrics including: temperature (GPU core, memory, board), power consumption (current, peak, limits), memory utilization (used, free, bandwidth), clock speeds (SM, memory), ECC errors (correctable/uncorrectable), PCIe throughput, NVLink bandwidth and errors, compute utilization, encoder/decoder usage, XID errors, thermal throttling events, and fan speeds where applicable.

Yes, OxMaint fully supports liquid-cooled DGX systems including the latest Blackwell-based DGX B200 and B300. We monitor coolant distribution unit (CDU) metrics including flow rates, inlet/outlet temperatures, pressure differentials, and pump status. For direct-to-chip cooling systems, we track per-GPU coolant temperatures and alert on thermal anomalies that indicate cooling system degradation.

OxMaint's AI typically predicts GPU failures 7-21 days in advance, depending on the failure mode. Thermal degradation patterns are usually detectable 2-3 weeks ahead. Memory issues (via ECC error trends) can be predicted 1-4 weeks out. Power supply problems often show patterns 7-10 days before failure. Our prediction accuracy improves over time as the AI learns your specific workload patterns and infrastructure characteristics.

OxMaint scales from a single DGX Station to enterprise DGX SuperPOD deployments with thousands of GPUs. Our architecture is designed for high-volume telemetry ingestion, processing millions of metrics per minute. Pricing is based on the number of GPU nodes (systems) rather than individual GPUs, making it cost-effective for dense 8-GPU DGX systems. There are no hard limits on GPU count.

Most NVIDIA infrastructure integrations are completed within 1-2 weeks. Day 1-2: DCGM Exporter deployment and OxMaint connection. Day 3-5: Asset registration, threshold configuration, and alerting setup. Week 2: Team training, workflow optimization, and AI model calibration. Our team provides hands-on implementation support for enterprise deployments, including on-site assistance for large SuperPOD installations.

Maximize your GPU investment with AI maintenance.

Stop losing GPU compute time to unexpected failures. OxMaint connects NVIDIA DCGM telemetry to intelligent maintenance management for maximum uptime.

Join AI infrastructure teams already protecting their GPU investments with OxMaint.

iphone