Stock Management Software

Monitor and manage inventory stock levels in real-time with OxMaint's powerful CMMS. Track total stocks, critical items, low stock alerts, and stock valuation—never run out of critical maintenance parts again.

Stock Management

Trusted by over 1000+ clients across the world

brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands

Complete Stock Solution

6-Step Stock Management Workflow

Everything you need for inventory control. From adding stock to automated reorder alerts, each step ensures optimal stock levels.

1
Add Stock
Material & Location
2
Set Levels
Reorder & Safety
3
Track Stock
Monitor Levels
4
Alerts
Low Stock Notify
5
Cycle Count
Verify Accuracy
6
Reorder
Replenish Stock

Easy Entry

Add New Stock Entry

Create stock entries with comprehensive details. Select materials, define storage locations, set quantity levels, track costs, and integrate with SAP—all from a simple form. Only materials without existing stocks are available for selection to prevent duplicates.

Material Selection

Choose from available materials in your catalog with smart filtering.

Storage Location

Define warehouse locations with shelf-level precision tracking.

Quantity Tracking

Track current stock and reserved quantities separately for accuracy.

Cost Tracking

Track average cost per unit for accurate inventory valuation.

Status Management

Set Active or Inactive status to control stock availability.

Duplicate Prevention

Only materials without existing stocks available for selection.

Add New Stock Entry
Create a new stock entry for inventory management
Select a material
e.g., Warehouse A - Shelf 1
0
0
0
0
0
0
Active

Level Control

Smart Stock Level Management

Configure reorder points, maximum stock levels, and safety stock thresholds for each item. Automatic alerts when stock falls below critical levels ensure you never run out of essential parts.

Reorder Point

Auto-alert when stock hits this level to trigger replenishment.

Max Stock

Prevent overstocking with maximum inventory limits.

Safety Stock

Buffer quantity for unexpected demand or supply delays.

Reserved Stock

Track items reserved for specific work orders or jobs.

Visual Indicators

Color-coded progress bars show stock health at a glance.

Available Calculation

Auto-calculate available stock minus reserved quantities.

Stock Level Configuration
Live
SKF 6205-2RS Bearing
Warehouse A - Shelf 3
Low Stock
Current: 15 Max: 100
  Safety: 5   Reorder: 20   Current: 15
Hydraulic Oil 10W
Warehouse B - Bay 2
Healthy
Current: 75 Max: 100
Reserved: 5 Available: 70

ERP Integration

SAP Integration

Seamlessly integrate with SAP ERP system. Map storage locations and batch numbers directly to your SAP configuration for unified inventory management across platforms.

SAP Storage Location

Map stock entries to SAP SLOC codes for unified tracking.

SAP Batch

Batch number tracking for lot-controlled materials.

Two-Way Sync

Real-time data synchronization between OxMaint and SAP.

Material Master

Link to SAP material master data for consistency.

Cost Import

Import cost data directly from SAP for accurate valuation.

Auto Posting

Automatic goods movements posted to SAP system.

SAP Integration
Connected
e.g., SLOC-001
Maps to SAP storage location code
e.g., BATCH001
Batch number for tracking
Last Sync: 2 mins ago All data synchronized
Synced
Material master data linked
Stock levels synchronized
Cost data imported

Cycle Counting

Stock Count & Verification

Track last count dates for each stock item. Schedule regular cycle counts to maintain inventory accuracy. Record count dates with timezone support (GMT) for global operations.

Last Count Date

Track when each stock item was last physically counted.

GMT Timezone

Global timestamp support for multi-location operations.

Cycle Count Scheduling

Schedule regular counts for high-value or critical items.

Variance Tracking

Identify discrepancies between system and actual counts.

Count History

Full audit trail of all previous cycle counts recorded.

Adjustment Tracking

Record adjustments made after variance investigation.

Stock Count Tracking
Cycle Count
Recent Stock Counts
SKF 6205-2RS Bearing
Warehouse A - Shelf 3
Counted 25-12-2025
System: 15 Counted: 15 Match
Hydraulic Filter HF-200
Warehouse B - Bay 5
Variance 24-12-2025
System: 50 Counted: 48 -2
Mechanical Seal Kit
Warehouse A - Shelf 7
Pending Due: 27-12-2025
Parts Catalog

Master catalog with specs, pricing, and suppliers.

Stocks

Track quantities, locations, and values.

Vendors

Supplier management and purchase orders.

Scraps

Track scrapped and disposed materials.

Inventory Suite

Complete Inventory Management

OxMaint's inventory module includes Parts, Stocks, Vendors, and Scraps—all working together for complete material management across your organization.

Parts Catalog

Master list of all materials with specifications, pricing, and supplier info.

Multi-Location Support

Track same part across multiple warehouses and storage locations.

Work Order Integration

Auto-reserve and issue parts directly from maintenance work orders.

Integrated Modules

Stock Connected to Every Module

OxMaint's stock management integrates seamlessly with all maintenance modules for complete operational visibility.

Work Orders
Auto-reserve parts for jobs
Assets
Link parts to equipment
Preventive Maintenance
Forecast part needs
Purchasing
Create purchase orders
Team
Track who issued parts
Reports & Analytics
Inventory insights
Documents
Attach spec sheets
Inspections
Parts for findings

We are proud of our results

We bring solutions to make inventory management easier for our customers.

target

40%

Reduced Stockouts

bar-chart

25%

Lower Carrying Costs

employees

99%

Inventory Accuracy

"Low stock alerts have eliminated emergency orders. We always have critical parts when needed."

Manufacturing Co.

Manufacturing

"SAP integration means our ERP and CMMS are always in sync. No more manual data entry errors."

Energy Corp

Oil & Gas

"Real-time stock valuation helps us manage budgets and forecast accurately. Total visibility."

Facility Services

Facilities

"Cycle count tracking improved our inventory accuracy from 85% to 99%. Huge improvement."

Logistics Plus

Transportation

FAQ

Frequently Asked Questions

Everything you need to know about OxMaint's stock management capabilities.

Parts are the master catalog of items you use—containing specifications, supplier information, and pricing. Stocks track the actual quantity of those parts at specific storage locations. A single part can have stock entries at multiple warehouses. For example, "SKF Bearing 6205" is a Part, while "15 units at Warehouse A - Shelf 3" is a Stock entry for that part.

The Reorder Point is the stock level at which you should place a new order to replenish inventory. When current stock falls to or below this level, OxMaint marks the item as "Low Stock" and can trigger alerts. Calculate your reorder point based on lead time demand plus safety stock to ensure you never run out of critical parts.

Safety Stock is a buffer quantity held to protect against unexpected demand or supply delays. It's the minimum stock you always want to have on hand. When stock falls below safety stock level, it's marked as "Critical" requiring immediate attention. Safety stock helps you avoid stockouts during emergencies or when suppliers have delays.

OxMaint integrates with SAP ERP through storage location (SLOC) and batch number mapping. You can link each stock entry to its corresponding SAP storage location code and batch number. This enables two-way synchronization of inventory data between OxMaint and SAP, eliminating manual data entry and ensuring both systems show consistent stock information.

Reserved Stock is the quantity of items that have been allocated to specific work orders or jobs but not yet physically issued. Available Stock = Current Stock - Reserved Stock. This prevents the same inventory from being promised to multiple jobs and ensures accurate availability information when planning maintenance work.

Take control of your inventory today.

Track stock levels, set reorder points, and never run out of critical parts again. Perfect for maintenance and operations teams.

OxMaint is available to download from both App Store and Google Play Store.

iphone