Residents see sweepers pass by and assume the job is done, but the city often has little proof of what was actually swept, when, or how well. Routes are drawn on paper maps, curb miles are tallied at month end, and a broken broom or hydraulic leak
Oxmaint is a maintenance management software (CMMS) that helps municipal public works departments, county fleet operations, water and sewer utilities and city facility teams manage work orders, preventive maintenance, inspections, spare parts and compliance records for every public asset — roads, bridges, water mains, public buildings, parks and municipal vehicles — from a single platform.
Open WOs
PM On-Time
Fleet Ready
Depts Live
Roads · Pothole repair on Elm St
Request routed to Roads crew · WO created
Water Main #47 · Quarterly PM
Auto-generated · Assigned to utility crew
Fleet DVIR · Plow Truck #23
Passed inspection · Recorded in Oxmaint
Playground Safety · Riverside Park
Monthly check complete · All items passed
From paper work orders and departmental silos to one CMMS covering every asset class and field crew — with no disruption to essential services.
Import every asset class, then QR-label and organise by department.
Build PM per asset class, load DVIR checklists and set request routing.
Integrate fleet telematics, water sensors, GIS and ERP, both ways.
Monitor PM compliance and backlog, with OSHA, EPA and FHWA records ready.
A citizen-reported pothole, a water-main PM, an overdue fleet DVIR, a playground inspection and a city hall HVAC repair all enter the same platform and route to the right department automatically — replacing spreadsheets, paper DVIRs, binders and email threads. Crews get assignments on mobile with asset, checklist, parts and history attached, and close jobs with photo evidence.
Every request in one platform
Roads to Roads, water to Utilities
Citizen submissions become WOs
Crews work from any device, offline
Elm St & 3rd Ave · Citizen-reported · Crew assigned
Station #5 quarterly · Utility crew · Scheduled
Unit 12 · Pre-shift inspection · In progress
Central branch · Filter change · Complete
Linear assets (roads, water mains), discrete (bridges, pump stations), mobile (snowplows, patrol vehicles), occupied (libraries, city halls) and recreational (playgrounds) all sit in one hierarchy, tagged and categorised by department. Every intervention — a chip-seal, a bridge inspection, a playground check, mileage PM on a fire engine — lands on the same asset record, so five years of spend on a specific bridge is one filter away.
Scan on-site, see full history
Linear, discrete, mobile, occupied
Every WO, PM, cost per asset
Actionable data for capital planning
78 road sections · 14 bridges
Mains, pump stations, hydrants
437 vehicles · 6 departments
68 facilities · HVAC, elec, plumbing
Playgrounds, fields, trails, shelters
OSHA crew safety, EPA water logs, FHWA bridge inspections, DOT fleet DVIR, CPSC playground checks and ADA access are each captured as a digital form the moment the task is completed — e-signed against the asset it protects. When an auditor or grant officer asks, filter by asset, date or standard and export the evidence bundle in seconds.
Crew PPE, LOTO, permit-to-work
Flushing, sampling, incident reports
Bridge, road, DVIR & driver logs
Filter by asset, date or standard
All crew records logged this month
Flushing & sampling records current
14 of 14 within reporting window
Pre-shift inspections e-signed daily
Work orders, PM schedules, asset registers, spare parts, digital inspections, predictive alerts and compliance records in one CMMS.
Create, assign and close every request, PM task and inspection from one queue — with auto-routing by asset class and mobile execution.
Build calendar, seasonal, mileage and deadline-based PM per asset class — work orders with checklists and crews generate automatically.
QR-tag every road, bridge, water main, building and vehicle — one scan opens its full maintenance history.
Parts, salt bins, filters and fleet consumables with min-max levels and automatic reservation on WO creation.
Mobile checklists for bridge inspections, playground checks, fleet DVIR and safety walks — failures auto-create a corrective WO.
Water pressure monitors, pump station SCADA and BMS feeds ingested — drift signals become work orders automatically.
Capture OSHA, EPA, FHWA, DOT DVIR and playground records as immutable digital evidence — exportable as audit packs by asset or date.
Track PM compliance, backlog, cost per asset and open-WO trends — filter by department, asset class or crew for council-ready visibility.
A DPW, a county emergency fleet, a utility under EPA scrutiny and a city facilities team — four typical deployments.
The Situation
A city public works department ran Roads, Water, Parks and Facilities on four tracking systems. Complaints came through five channels, council reporting took weeks, and the deferred backlog grew invisibly.
How Oxmaint Helped
Every asset was registered with its department, criticality and PM cadence. Citizen requests entered one form that auto-routed to the right division, and council reports came straight from dashboards.
Four divisions
Requests to right crew
Reports in minutes
Every request flowed into one queue with auto-routing by asset class, replacing four disconnected systems.
Citizen-facing forms replaced phone tag — every request became a WO with department, priority and asset attached.
Roads, water mains, playgrounds and buildings each tagged with their own PM cadence and cost history.
Council-ready dashboards showed spend, PM compliance and backlog by division in one filter.
The Situation
A county fleet division maintained patrol cars, fire engines, ambulances and sanitation trucks across multiple garages. DVIRs were on paper, mileage PM lived in mechanic logbooks, and breakdowns pulled emergency vehicles out of service.
How Oxmaint Helped
Every vehicle was loaded with its class, department, PM cadence and DOT requirements. DVIRs became pre-shift forms on the driver's phone and mileage PM auto-generated WOs before units broke down.
One CMMS record
Pre-shift on phone
Miles-based triggers
Every patrol car, ambulance and snowplow QR-tagged with model, mileage, engine hours and service history.
WOs generated automatically at each mileage or engine-hour threshold — no mechanic memory or paper logbooks.
Drivers completed pre-shift DVIRs on mobile — failed items auto-created a WO and flagged the vehicle out-of-service.
Every DVIR, inspection and driver log captured as evidence — DOT audit prep became a filter query.
The Situation
A utility district managed hundreds of miles of mains, dozens of pump stations and a treatment plant under strict EPA reporting. Sampling records, flushing logs and pump PM lived across three systems, so every audit took weeks to prepare.
How Oxmaint Helped
Every asset was registered with its inspection and sampling cadence. Crews captured readings on mobile at the asset, and SCADA alerts generated WOs before pressure drops caused main breaks.
One utility register
Sensor data to WOs
Audit packs on demand
Mains, hydrants, valves and pump stations mapped with unique IDs, criticality tiers and service history.
EPA-mandated sampling, flushing and valve exercise schedules ran automatically, with overdue tasks escalated.
Pump station SCADA signals flowed in — pressure drift and amperage anomalies became WOs before customers noticed.
Evidence bundles filtered by asset, date and sampling type exported in seconds when regulators asked.
The Situation
A city facilities team maintained city hall, police and fire stations, libraries and community centers. HVAC, plumbing, electrical and fire safety spanned dozens of properties, with issues reported by email and WOs in a weekly spreadsheet.
How Oxmaint Helped
Every building became a site with HVAC, electrical, plumbing and fire safety as sub-assets. Managers used a request portal feeding the work queue, and seasonal PM ran automatically across the portfolio.
One CMMS site
No more email chaos
Auto-scheduled
Every building its own site with HVAC, electrical, plumbing and fire safety catalogued as sub-assets.
A digital form replaced email reports — every issue became a WO tagged to the right building, system and trade.
Seasonal HVAC prep, annual extinguisher checks and monthly emergency lighting tests ran automatically across the portfolio.
Fire safety walks, ADA checks and code inspections captured on mobile, with evidence attached to the building.
Oxmaint connects with fleet telematics, GIS platforms, utility SCADA and municipal ERP or accounting systems — so equipment, cost and location data move both ways without duplicate entry.
Explore All IntegrationsMunicipalities, counties, townships, water and sewer districts, public works departments, parks divisions, city facilities teams and fleet operations. Being asset-class-agnostic, one deployment covers roads, bridges, water infrastructure, buildings, playgrounds and the fleet.
Yes. The asset register supports linear assets (roads, water mains), discrete (bridges, pump stations), mobile (snowplows, patrol vehicles), occupied (public buildings) and recreational (playgrounds) in one hierarchy — each with its own PM cadence, checklists, cost history and department.
Yes. Citizens or building managers submit through a simple digital form, and each submission becomes a work order with the correct department, asset and priority — auto-routed to the responsible crew. Requests sit alongside PM tasks and inspections, so crews see one queue.
Yes. OSHA safety sign-offs, EPA sampling and flushing logs, FHWA bridge inspections, DOT DVIR and CPSC playground checks are each captured immutable, e-signed and timestamped against the asset — filter by asset, date or standard and export in seconds.
Yes. Field crews open work orders, complete inspections, capture photos and record readings with no connectivity — essential in underground vaults and at remote trail sites. Data syncs the moment a connection returns. Available on iOS, Android and rugged tablets.
Yes. GIS brings asset location into the CMMS, fleet telematics updates odometer and engine hours automatically, utility SCADA turns sensor data into predictive work orders, and municipal ERP or accounting keeps equipment, part and cost data in sync without duplicate entry.
Join 1,000+ maintenance teams running work orders, PM schedules, spare parts, inspections and compliance records in one CMMS.