OEM Telematics Software for Fleet Management

Connect directly to factory-installed vehicle telematics from Ford, GM, Volvo, Caterpillar, and 20+ leading manufacturers. Get real-time diagnostics, predictive maintenance alerts, and comprehensive analytics—no additional hardware required.

1200k+ Active users No hardware installation needed

Oxmaint OEM Dashboard

245

Connected Vehicles

98.7%

Fleet Uptime

18

Active Alerts

$42.5K

Monthly Savings

Active Fault Codes

Critical Truck #2451 - P0301 Cylinder Misfire

Warning Van #1204 - Low DEF Level

Info Truck #3567 - Service Due in 500mi

100%

Factory Direct Data

20+

OEM Platforms Data

45%

Downtime Reduction

Live

Real-Time Diagnostics

Trusted OEM Partners

20+ Leading Manufacturers

Plus Ford, GM, Mercedes-Benz, RAM, Toyota, and more

Simple Process

How OEM Telematics Integration Works

Factory-direct connectivity that transforms your fleet management with manufacturer-grade intelligence

Connect
OEM Secure APIs
Stream
Real-Time Data
Sync
CMMS Integration

Direct OEM Data Streaming

Connect directly to your vehicle manufacturer's telematics platform through secure API integration. Real-time data streams continuously from factory-installed sensors and control modules, including engine diagnostics, fuel consumption, GPS location, driver behavior, fault codes, and maintenance indicators. No additional hardware installation required—leverage the sophisticated sensors already built into your vehicles by the manufacturer.

  • Factory-direct secure connectivity
  • Real-time OEM sensor data
  • No aftermarket hardware needed
  • Comprehensive diagnostics & alerts

Intelligent Fault Code Analysis & Predictive Alerts

Our AI-powered diagnostic engine continuously monitors all incoming fault codes and diagnostic trouble codes (DTCs) from your OEM telematics. When issues are detected, the system automatically cross-references manufacturer specifications, evaluates severity, predicts failure timelines, and generates maintenance work orders. Technicians receive detailed diagnostic information including fault descriptions, recommended repairs, parts lists, and labor estimates—all before the vehicle breaks down.

  • Automatic fault code interpretation
  • Predictive failure analysis
  • Automated work order generation
  • Manufacturer-specific repair procedures
Detect
Fault Codes Identified
Analyze
AI Severity Prediction
Prevent
Auto Work Orders

Comprehensive Performance Analytics & Optimization

Transform raw OEM telematics data into actionable insights with advanced analytics dashboards. Track key performance indicators including fuel efficiency trends, engine operating conditions, idle time patterns, maintenance costs per mile, asset utilization rates, and driver performance metrics. Benchmark individual vehicles against your fleet average and manufacturer standards. Generate comprehensive reports for management, regulatory compliance, or warranty claims with complete historical data and trend analysis.

  • Real-time performance dashboards
  • Fleet-wide benchmarking analytics
  • Customizable KPI tracking
  • Historical trend analysis

Fleet Performance Dashboard

7.2 MPG

Fleet Average +4%

98.7%

Uptime Rate

23

Active Fault Codes 3 Critical

Why Choose Oxmaint

Why Oxmaint OEM Telematics Integration

1

Factory-Grade Diagnostics Without Additional Hardware

Access the same high-quality diagnostic data that dealerships use, directly from your vehicle manufacturer's platform. No need for aftermarket GPS devices or additional telematics hardware.

2

Predictive Maintenance Intelligence

Transform reactive maintenance into proactive prevention with AI-powered predictive analytics. The system analyzes engine performance trends, fluid conditions, component wear patterns, and operating conditions to predict failures before they occur.

3

Warranty Protection & Compliance Documentation

Maintain complete maintenance records with OEM-verified data that supports warranty claims and proves regulatory compliance. Automatic documentation of all service performed with exact odometer readings, operating hours, and diagnostic data from the manufacturer.

Powerful Features

Complete OEM Data Integration Capabilities

Everything you need to leverage manufacturer telematics data effectively

Real-Time Fault Codes

Instant notification of diagnostic trouble codes with manufacturer-specific descriptions and recommended actions.

GPS Location Tracking

Real-time vehicle location data with geofencing, route history, and proximity-based service scheduling.

Engine Performance Monitoring

Track engine hours, RPM patterns, temperature, oil pressure, and other critical operating parameters.

Fuel Consumption Analytics

Detailed fuel usage data with MPG calculations, idle time tracking, and efficiency benchmarking.

Driver Behavior Scoring

Monitor harsh braking, rapid acceleration, speeding, and other driving patterns affecting maintenance needs.

Automated Service Reminders

Automatic maintenance scheduling based on manufacturer intervals, odometer, or engine hours.

More Integrations

Related Integrations

Explore other powerful integrations to enhance your CMMS

GPS Tracking

Integrate aftermarket GPS telematics for vehicles without OEM systems or enhanced tracking capabilities.

Learn More

Geotab GPS & Telematics

Combine OEM data with Geotab's aftermarket telematics for comprehensive fleet intelligence and analytics.

Learn More

Fuel Card Integration

Combine OEM fuel data with fuel card transactions for complete fuel expense management and validation.

Learn More

FAQ

Frequently Asked Questions

Everything you need to know about OEM telematics integration with Oxmaint

Oxmaint integrates with 20+ OEM telematics platforms including Ford Commercial Solutions (Ford Data Services), GM Fleet (OnStar Business Solutions), Volvo Connect, Mercedes-Benz PRO (Fleetboard), RAM TruckCare, Toyota Connected, Caterpillar Product Link, John Deere JDLink, Komatsu KOMTRAX, and many others. We support light-duty commercial vehicles, medium and heavy-duty trucks, construction equipment, and agricultural machinery. Our flexible integration framework can connect to virtually any manufacturer telematics platform that provides API access. If you have a specific OEM platform not listed, contact us to discuss custom integration options.

No! That's the beauty of OEM telematics integration. Your vehicles already have sophisticated factory-installed sensors, GPS modules, and diagnostic systems built by the manufacturer. Oxmaint connects directly to your OEM's telematics platform through secure APIs, accessing the data that's already being collected by your vehicle's onboard systems. This means zero hardware installation, no device maintenance, no additional cellular data plans, and no concerns about aftermarket devices affecting vehicle warranties. Simply enable the telematics service with your vehicle manufacturer and connect it to Oxmaint.

OEM telematics provides comprehensive vehicle data including real-time GPS location and movement, odometer and engine hour readings, diagnostic trouble codes (DTCs) with manufacturer descriptions, engine performance metrics (RPM, temperature, oil pressure), fuel level and consumption data, battery voltage and electrical system health, brake system status, tire pressure monitoring, emissions system data, driver behavior metrics, and maintenance indicator status. The specific data available varies by manufacturer, model year, and vehicle type. Heavy-duty trucks and construction equipment typically provide more detailed diagnostic information than light-duty vehicles.

Oxmaint's AI-powered predictive maintenance engine continuously analyzes patterns in your OEM telematics data to identify potential failures before they occur. The system monitors trends in engine performance, examines fault code patterns, tracks fluid condition indicators, analyzes operating environment stress factors, and compares vehicle performance against manufacturer specifications and your fleet baseline. When concerning trends are detected, you receive alerts with predicted failure timeframes, specific components at risk, recommended preventive actions, and estimated cost comparisons between proactive service and breakdown repair. This typically reduces unexpected breakdowns by 45% and extends vehicle lifespan by 25%.

No, OEM telematics integration actually helps protect and strengthen your warranty position. Because we're accessing data through the manufacturer's official platform with no physical modifications to your vehicles, there's zero impact on warranties. In fact, the detailed maintenance records and OEM-verified service history can help support warranty claims by providing irrefutable documentation of proper maintenance, exact operating conditions, and timely response to fault codes. Many fleet managers use OEM telematics data to prove warranty claims that might otherwise be disputed, especially for powertrain failures or component issues covered under manufacturer warranties.

Initial setup typically takes 3-5 business days from start to finish. The process involves: verifying your vehicles have active telematics subscriptions with the manufacturer (1 day), obtaining API credentials and access permissions from your OEM platform (1-2 days), configuring the integration and mapping your vehicles in Oxmaint (1 day), and testing data flow and validating all information (1 day). Some manufacturers require additional approval steps or have specific security requirements that may extend the timeline. Our implementation team handles all technical coordination with the OEM platform while you focus on business configuration like alert thresholds and maintenance rules.

Ready to Unlock Your Factory Telematics Data?

Join hundreds of organizations that have transformed their maintenance operations with direct OEM telematics integration. Get started today and tap into the powerful diagnostic data already in your vehicles.