Connect PLC sensors from all major manufacturers to automatically collect data through multi-protocol connectivity, monitor cross-platform systems, standardize protocol communications, and unify equipment data for comprehensive vendor-agnostic operational visibility.
1200k+ Active users Universal PLC platform
PLC Brands
Protocols
Data Tags
Data Quality
Recent PLC Activity
Connected Siemens S7 - OPC UA protocol active
Collecting Data Tags - 4,847 points monitored
Integrated Systems - 12 brands unified
Protocol
Data Acquisition
Platform
Agnostic
PLC sensors provide universal multi-protocol connectivity integration for Oxmaint
Multi-protocol PLC connectivity supporting Modbus, OPC UA, EtherNet/IP, and PROFINET
Comprehensive data collection from all major PLC manufacturers and control systems
Unified monitoring across multiple PLC brands with standardized data formats
Independent solution working with Siemens, Rockwell, ABB, Schneider, and more
Seamless multi-manufacturer data flow from PLC systems to operational intelligence
Connect to programmable logic controllers from all major manufacturers through comprehensive protocol support including Modbus TCP/RTU, OPC UA, EtherNet/IP, PROFINET, PROFIBUS, and proprietary protocols. Automatically discover PLC devices on industrial networks for simplified configuration. Support both polling and subscription-based data collection methods for optimal performance. Handle protocol conversion and data translation between different manufacturer systems. Monitor communication health across all connected protocols. Generate unified connectivity reports showing device status, protocol performance, and data quality metrics across mixed-vendor environments.
Collect process data from diverse PLC systems through unified data acquisition framework supporting digital inputs, analog signals, registers, and structured data types. Map PLC tags to standardized data models for consistent cross-platform analysis. Configure data collection rates optimized for each protocol and network bandwidth. Buffer data locally during communication interruptions for guaranteed data integrity. Validate data quality through range checking, timestamp verification, and change detection. Archive raw PLC data and calculated metrics for historical analysis and reporting across all connected manufacturer systems.
Visualize operational data from multiple PLC manufacturers through unified dashboards providing single-pane visibility across mixed automation environments. Compare performance metrics between different PLC brands and systems. Analyze trends spanning multiple protocols and vendors for enterprise-wide insights. Generate consolidated reports combining data from Siemens, Rockwell, ABB, Schneider, Mitsubishi, Omron, Honeywell, and other manufacturers. Support equipment migration between different PLC platforms while maintaining historical continuity. Eliminate vendor lock-in through standardized data access enabling flexible technology choices for future automation investments.
Brands
Tags
Universal Platform
15 protocols supported
98.7% data quality maintained
Eliminate data silos through comprehensive multi-protocol PLC integration supporting all major manufacturers. Connect Siemens, Rockwell, ABB, Schneider, Mitsubishi, Omron, Honeywell, and other brands through single unified platform. Support Modbus, OPC UA, EtherNet/IP, PROFINET, and proprietary protocols simultaneously. Automatically discover devices and configure communication without vendor-specific programming.
Achieve consistent data access through standardized tag mapping and protocol conversion across diverse PLC systems. Transform manufacturer-specific data formats into unified information model. Compare performance metrics between different automation platforms. Generate consolidated reports combining data from multiple vendors. Support equipment standardization initiatives without data continuity loss.
Maintain technology flexibility through independent integration layer removing vendor dependencies. Select optimal PLC platform for each application based on technical requirements rather than data integration constraints. Migrate between manufacturers without losing historical data or rebuilding integration infrastructure. Support brownfield and greenfield projects with equal ease.
Everything you need for multi-vendor automation integration
Connect through Modbus, OPC UA, EtherNet/IP, PROFINET, and proprietary protocols.
Discover PLC devices automatically on industrial networks for simplified configuration.
Convert and translate data between different manufacturer protocol standards.
Map PLC tags to standardized data models for consistent cross-platform analysis.
Validate data quality through range checking, timestamps, and change detection.
Buffer data locally during communication interruptions for guaranteed integrity.
Visualize data from multiple PLC manufacturers through single-pane dashboards.
Compare performance metrics between different PLC brands and systems.
Generate unified reports combining data from multiple vendors and protocols.
Explore manufacturer-specific integrations for specialized features
Specialized Siemens integration with PROFINET diagnostics and TIA Portal support.
Learn MoreDedicated Rockwell integration with FactoryTalk and Studio 5000 connectivity.
Learn MoreFocused ABB integration with VFD monitoring and motor optimization features.
Learn MoreEverything you need to know about PLC sensor integration
Oxmaint connects to programmable logic controllers from all major manufacturers through universal protocol support. Multi-protocol connectivity enables simultaneous communication with Siemens, Rockwell, ABB, Schneider, and other brands. Data acquisition collects process tags and converts formats to standardized models. Cross-platform dashboards visualize data from mixed-vendor environments. Historical archiving maintains complete data continuity across equipment migrations and technology changes.
Universal PLC integration supports Modbus TCP and RTU, OPC UA, OPC DA, EtherNet/IP, PROFINET, PROFIBUS, BACnet, and manufacturer-specific protocols. Automatic protocol detection simplifies configuration. Support for both client and server modes enables bidirectional communication. Protocol conversion translates between different standards seamlessly. Compatible with legacy and modern PLC platforms for complete facility coverage.
Universal connectivity reduces integration costs 50-70% through elimination of vendor-specific custom development. Single unified platform replaces multiple point-to-point integrations. Standardized configuration accelerates implementation timelines. Reusable tag mappings reduce engineering effort for similar equipment. Automatic device discovery minimizes commissioning time. Vendor independence enables competitive sourcing without integration penalty for each manufacturer change.
Data acquisition features include universal tag mapping to standardized models. Support digital inputs, analog signals, registers, and structured data types. Configurable collection rates optimized per protocol. Local buffering during communication interruptions. Data quality validation through range checking and timestamp verification. Historical archiving with compression for long-term storage. Export capabilities for external analytics platforms and reporting systems.
Vendor-agnostic integration enables optimal PLC selection based on technical requirements rather than data constraints. Migrate between manufacturers without losing historical continuity. Support brownfield and greenfield projects equally. Mix equipment brands within single facility without integration complexity. Protect automation investments through future-proof connectivity. Enable best-of-breed strategies selecting ideal platform for each application without data integration penalty.
Universal PLC integration eliminates data silos across mixed-vendor environments. Integration costs reduce 50-70% through standardized connectivity. Cross-platform analytics enable enterprise-wide insights regardless of PLC brand. Technology flexibility supports best-of-breed equipment strategies. Historical continuity maintains through equipment migrations. Complete integration provides competitive advantage through vendor independence and strategic sourcing capabilities for automation investments.
Join facilities using universal PLC integration with Oxmaint to connect multi-protocol systems, acquire data from all manufacturers, monitor cross-platform operations, and achieve vendor-agnostic visibility for enhanced operational flexibility.