Safety & Compliance

Stay on top of safety and regulatory compliance with ease. Generate audit-ready reports, track incidents, conduct OSHA-compliant inspections, and maintain complete documentation—pass audits with confidence every time.

Safety & Compliance

Trusted by over 1000+ clients across the world

brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands

Complete Compliance Lifecycle

6-Step Safety Compliance Process

From scheduled inspections to audit-ready reports, streamline your entire safety compliance workflow.

1
Schedule
Inspections
2
Inspect
Checklists
3
Document
Findings
4
Track
Incidents
5
Resolve
Issues
6
Report
Audit Ready

Safety Inspections

OSHA-Compliant Safety Inspection Checklists

Conduct thorough safety inspections with digital checklists designed for OSHA compliance. Attach photos, add notes, and capture signatures—all from your mobile device. Never miss a safety check again.

Pre-Built Templates

OSHA, EPA, and industry-specific inspection templates.

Photo Documentation

Attach photos to inspection items for evidence.

Digital Signatures

Capture inspector and supervisor signatures.

Scheduled Inspections

Auto-schedule daily, weekly, monthly inspections.

Pass/Fail Scoring

Automatic pass/fail calculations with thresholds.

Mobile-First

Complete inspections on any device, even offline.

Safety Inspection
OSHA Compliance Checklist

Fire Safety Equipment Inspection

Fire extinguishers accessible
Pass
Emergency exits clear
Pass
Sprinkler system tested
Fail
Fire alarm functional
Pass
Inspection Score: 75% (3/4 Pass)
Needs Action

Incident Tracking

Incident Reporting & Tracking

Report and track workplace incidents, near misses, and hazards in real-time. Capture details, photos, witness statements, and corrective actions. Maintain complete records for OSHA compliance and root cause analysis.

Incident Types

Injuries, near misses, property damage, spills.

Root Cause Analysis

Document root causes and preventive measures.

Corrective Actions

Assign and track corrective action completion.

OSHA 300 Log

Auto-generate OSHA 300/300A recordkeeping forms.

Witness Statements

Collect and store witness information securely.

Trend Analysis

Identify incident patterns and high-risk areas.

Incident Dashboard
0
Lost Time
3
Near Miss
156
Safe Days
Recent Incidents
Near Miss - Forklift
Warehouse A • Dec 24
Resolved
Spill - Hydraulic Oil
Production Line 3 • Dec 22
Resolved
Days Without Lost Time Incident Keep up the great work!

156

Audit Trail

Complete Audit Trail & Documentation

Maintain complete, timestamped documentation of all safety activities. Every inspection, maintenance task, and incident is logged with full traceability. Generate audit-ready PDF reports at the click of a button.

Historical Records

Access complete history of all compliance activities.

PDF Reports

Generate formatted PDF reports for auditors.

Timestamped Logs

Every action logged with date, time, and user.

Digital Signatures

Electronic sign-offs for compliance verification.

Document Attachments

Attach certificates, permits, and SOPs to records.

Secure Cloud Storage

All documents securely stored and backed up.

Audit Trail
Complete compliance history

Recent compliance activities

Fire Safety Inspection 2h ago
Completed by John Smith • Signed
Incident Report #IR-2025-042 4h ago
Submitted by Sarah Johnson • Reviewed
LOTO Procedure Verified Yesterday
Pump Station #3 • Mike Wilson
Audit Report Generated 2 days ago
Q4 2025 Safety Audit • PDF exported
Export Audit Report (PDF)

LOTO Procedures

Lockout/Tagout (LOTO) Compliance

Manage LOTO procedures digitally to ensure worker safety during equipment maintenance. Track lockout points, verify isolation, and document energy control procedures for full OSHA 29 CFR 1910.147 compliance.

LOTO Checklists

Step-by-step lockout procedures for each asset.

Energy Source Tracking

Document all energy isolation points.

Verification Steps

Confirm zero-energy state before work begins.

Multi-Person LOTO

Track locks from multiple workers on same asset.

Removal Verification

Verify all locks removed before re-energizing.

Training Records

Track LOTO training for authorized employees.

LOTO Procedure
Active Lockout
Hydraulic Press #5
WO-2025-1842
Mike Wilson
LOCK-042
Energy Isolation Points
Electrical Disconnect (Panel B-5) Locked
Hydraulic Valve (HV-12) Locked
Pneumatic Line (Air-3) Locked
Equipment Locked Out Zero-energy verified • Safe to work

Compliance Reports

Compliance Reporting & Analytics

Generate comprehensive compliance reports and analytics. Track inspection completion rates, incident trends, and overall safety performance. Identify gaps and take proactive action before audits.

Compliance Score

Real-time compliance percentage across all areas.

Inspection Analytics

Track completion rates and pass/fail trends.

Incident Dashboard

Visualize incident types, locations, and trends.

Scheduled Reports

Auto-email compliance reports to stakeholders.

Export Options

Export to PDF, Excel, or share via email.

Regulatory Reports

OSHA 300, 300A, and custom regulatory formats.

Compliance Overview
98%
Overall
95%
Inspections
100%
Training
Compliance by Category
OSHA Compliance
98%
EPA Compliance
100%
Fire Safety
92%
LOTO Procedures
100%

Preventive Compliance

Preventive Maintenance for Safety Compliance

Stay up-to-date on safety-critical maintenance tasks. Schedule regular safety checks, equipment certifications, and compliance inspections. Never miss a deadline that could put your facility at risk.

1
Schedule Safety PMs

Create recurring preventive maintenance for safety equipment.

2
Automated Reminders

Get notified before inspections and certifications are due.

3
Track Certifications

Monitor expiration dates for equipment certifications.

✓
Maintain Compliance

Document all completed tasks for audit readiness.

Upcoming Safety Tasks

Fire Extinguisher Inspection

Monthly • All Locations
Due in 3 days

Safety Valve Testing

Quarterly • Boiler Room
Due in 2 weeks

Elevator Certification

Annual • Building A
Due in 45 days

Emergency Lighting Test

Weekly • All Exits
Completed
Auto-Reminders
Get notified 7, 3, and 1 day before due dates.

Integrated Modules

Safety Connected to Your CMMS

Safety and compliance integrates seamlessly with work orders, assets, inspections, and your entire maintenance ecosystem.

Inspections
Safety checklists
Incidents
Reporting & tracking
Audit Trail
Documentation
LOTO
Lockout/Tagout
Work Orders
Safety-linked WOs
Assets
Equipment safety
Reports
Compliance analytics
Training
Certifications

We are proud of our results

We bring solutions to make safety compliance easier.

target

50%

Reduce Breakdown

bar-chart

315%

Return on Investment

employees

99.7%

Customer Satisfaction

"With OxMaint it's easy to follow and track your work orders and supplies. You can keep everyone updated on where work orders stand."

Hanson

Australia

"Easy to use! Love this. I'm trying to get the company I work for to go paperless. Schedule helps so much to get reminder of maintenance tasks."

Ramky

India

"Using OxMaint has been an easy process, and it helps keep everything in one place. I also like that our Operations Manager sees everything."

TTCFL

USA

"Great program and customer service has been awesome. If you have a fleet of assets, especially larger assets, this app is great."

RCLEAMA

Brazil

FAQ

Frequently Asked Questions

Everything you need to know about OxMaint's Safety & Compliance capabilities.

OxMaint supports a wide range of compliance standards including OSHA (Occupational Safety and Health Administration), EPA (Environmental Protection Agency), ISO 45001 (Occupational Health & Safety), FDA regulations for pharmaceutical and food industries, Joint Commission for healthcare, and various local fire and building codes. Our inspection templates and reporting features are designed to help you meet these regulatory requirements with proper documentation and audit trails.

OxMaint helps maintain OSHA-compliant records by tracking all workplace incidents, near misses, and injuries. The system can auto-generate OSHA 300 Log (Log of Work-Related Injuries and Illnesses), OSHA 300A (Summary), and OSHA 301 (Injury and Illness Incident Report) forms. All incident data is timestamped, includes corrective actions, and is stored securely for the required retention period. This makes annual reporting and audits much simpler.

Yes! OxMaint allows you to create fully customized safety inspection checklists tailored to your specific equipment, processes, and regulatory requirements. You can add pass/fail items, numeric readings, photo requirements, and conditional logic. We also provide pre-built templates for common inspections like fire safety, electrical safety, machine guarding, and PPE compliance that you can use as-is or customize.

OxMaint's LOTO module allows you to create and manage energy control procedures for each piece of equipment. When maintenance is required, technicians follow step-by-step lockout procedures, document each energy isolation point, and verify zero-energy state. The system tracks who has locks applied, prevents removal until all workers are clear, and maintains complete documentation for OSHA 29 CFR 1910.147 compliance. Multi-person lockouts are fully supported.

Absolutely! OxMaint generates professional PDF reports that are ready to present to auditors. Reports include completed inspections with all details, incident reports with corrective actions, maintenance history for safety-critical equipment, training and certification records, and comprehensive compliance summaries. All reports are timestamped, include digital signatures where applicable, and maintain complete audit trails. You can generate reports on-demand or schedule automatic distribution.

Stay on top of safety compliance today.

Generate audit-ready reports, track incidents, and conduct OSHA-compliant inspections. Pass audits with confidence every time.

OxMaint is available to download from both App Store and Google Play Store.

iphone