Finding a refrigerant leak is only the first step. The harder part is making sure it gets a work order, a repair, a retest and a record, and that the next technician can see the same unit has leaked before. When that history lives in a technician'
Oxmaint is a maintenance management software (CMMS) that helps HVAC service contractors and facility teams manage work orders, preventive maintenance, asset registers, spare parts, refrigerant records and compliance documentation in one integrated platform — engineered for the multi-site, seasonal, contract-driven reality of HVAC operations.
Open WOs
PM Compliance
MTBF
Sites Live
Work Order · Chiller #2 compressor
Auto-created from sensor drift · Parts reserved
Seasonal PM · Fall heating prep
Auto-generated for 42 boiler units
Refrigerant Log · R-454B recharge
Recorded on WO-4218 · Cylinder ID tracked
QR Scan · RTU-7 asset opened
Full service history displayed on mobile
A four-stage path from paper-based maintenance to a live CMMS — for service contractors and in-house facility teams alike, with no disruption to scheduled service.
Import your equipment list and QR-label every unit by site.
Build seasonal and runtime PM schedules, and upload SOPs and checklists.
Connect Trane, Johnson Controls, Honeywell or Siemens, plus your ERP.
Track PM compliance, MTBF, MTTR and open-WO trends on dashboards.
Tenant complaints, scheduled PM, BMS alerts and failed inspections all enter one digital queue with clear priority, asset link and due time. Technicians get work orders on mobile with the asset, SOP, parts and checklist attached, capture photos and readings at the equipment and close from their phone while dispatchers track live progress.
Create, assign, execute and close from any device
RTU startups, boiler checks, chiller PM forms
Attached to every WO from the mobile app
Every intervention searchable by asset or site
Site: Metro Hospital · Assigned to Mike R. · Kit ready
Site: Skyline Office · Checklist attached · 55 min
Site: Westfield Mall · Sarah L. · Photo uploaded
All items passed · e-signed · Recorded in Oxmaint
Vibration, pressure, temperature, charge and amperage from your chillers, RTUs, AHUs and cooling towers are ingested via BACnet, Modbus or direct BMS integrations and monitored against a baseline learned from your own equipment. On drift it opens a work order with the failing asset linked, parts reserved and a certified technician assigned — structured jobs, not raw alarms.
BACnet, Modbus, direct BMS connectors
Oxmaint learns healthy signatures for each unit
Every drift signal opens a real WO in the CMMS
Site-by-site equipment health inside Oxmaint
Alert converted to WO · Bearing kit reserved
Cleaning WO added to next PM window
Signals within baseline · No WO required
Refrigerant records, certifications, cooling-tower test logs and safety sign-offs each become a digital form captured the moment the task is done. A recharge is logged on the work order that triggered it — type, quantity, cylinder ID and technician certification recorded automatically — while cert expiries trigger renewal WOs and evidence bundles export by asset, date or standard.
Captured on the work order that used it
Technician cert expiries tracked in Oxmaint
Legionella testing history per asset
Filter by date, asset or regulator
All logs linked to WOs and assets
All active · 2 renewals due Q4
6 towers · All tests within window
LOTO, PPE, permit-to-work logged
Work orders, PM schedules, equipment registers, spare parts, inspections, predictive alerts and compliance records in one platform.
Create, assign and close every service call, PM task and inspection from one digital queue — with mobile execution, photo evidence and full asset history.
Build calendar, seasonal, runtime and deadline-driven PM schedules that auto-generate work orders with linked SOPs and parts reserved.
QR-tag every chiller, RTU, AHU, boiler and VRF unit. Any phone scan opens its model, serial, refrigerant type and full service history.
Track every belt, filter, capacitor and refrigerant cylinder with min-max levels and automatic reservation when a PM or predictive WO is created.
Digital checklists on the mobile app — RTU startups to boiler safety checks. Any failed item opens a corrective WO with photo evidence.
Ingest sensor and BMS data via BACnet, Modbus or direct integrations, and turn every drift signal into a fully-attributed work order.
Capture refrigerant logs, certifications, cooling tower tests and safety sign-offs as immutable evidence — exportable by asset, date or standard.
Track PM compliance, MTBF, MTTR, open-WO trends and spend — filtered by site, technician, equipment class or asset.
A service contractor, a retail chain, a hospital campus and a commercial property portfolio — four typical deployments.
The Situation
A contractor servicing dozens of client sites ran dispatch on whiteboards, PM on spreadsheets and refrigerant records on paper — with technicians phoning the office for equipment history.
How Oxmaint Helped
Every site and unit was registered in Oxmaint. Work orders arrived in one queue with priority and technician assigned, and refrigerant use was logged on the WO that caused it.
All sites, one view
Techs work from phone
Digital, searchable
All service calls, PM tasks and inspections in one queue with clear priority and asset context.
Every chiller, RTU, AHU and boiler QR-tagged — technicians scanned on arrival instead of calling the office.
Technicians received WOs, completed inspections and logged refrigerant use offline on rooftops and in plant rooms.
Every recharge and recovery captured on the WO with type, quantity, cylinder ID and certification.
The Situation
A retail facility team maintained rooftop units and split systems across a store network. Managers reported issues by email, phone or text, with no portfolio view of PM compliance.
How Oxmaint Helped
Each store became a site with tagged assets. Managers submitted issues via a request form feeding the work queue, and seasonal PM built once applied to every rooftop unit.
Every store request
PM compliance visible
Prep every store
A digital request form replaced phone and email chaos — store issues arrived as work orders tagged to the correct site and asset.
Templates built once applied network-wide — cooling and heating prep ran without manual scheduling.
Each store's equipment was tagged in Oxmaint — regional technicians scanned the RTU and saw full context on arrival.
Regional teams saw PM compliance, open WO counts and spend by store — surfacing which locations needed intervention.
The Situation
A hospital team maintained OR air handlers, isolation-room pressure controls, chiller redundancy and tower testing across a campus — with evidence in binders and shared drives, audit prep took weeks.
How Oxmaint Helped
Every critical asset was registered with its PM cadence, checklists and required records. Checks, calibrations and tests were captured on mobile at the point of task, not reconstructed at audit time.
Never miss a check
Digital, e-signed
Minutes, not weeks
OR air handlers, isolation-room controls and redundant chillers on escalating PM — missed checks auto-notified the director.
Pressure differentials, filter checks and humidity readings logged on mobile at the point of measurement.
Tower tests, calibrations and safety sign-offs captured as immutable e-signed evidence, filterable by asset and date.
Complete evidence bundles for any critical asset exported in minutes when inspectors arrived.
The Situation
A property manager ran multiple office towers with rising HVAC costs. Chillers were fixed reactively, AHU belts replaced after failure, and BMS drift went unnoticed until tenants complained.
How Oxmaint Helped
The predictive module was connected to each tower's BMS, so chiller and AHU drift generated WOs with the failing asset linked and parts reserved — before tenants noticed.
Drift becomes WOs
Fixed before complaints
Extended asset years
BMS signals via BACnet and Modbus — chiller vibration, coil pressure and tower drift became attributed WOs.
Alerts converted straight to WOs with the failing component identified and parts reserved.
Complete service history per chiller and AHU backed refurbish-vs-replace capital decisions with real data.
Spend, PM completion and open-WO trends compared building-to-building, surfacing which towers needed capital.
Oxmaint connects with Trane Tracer, Johnson Controls Metasys, Honeywell, Siemens Desigo and Schneider via BACnet and Modbus — plus SAP, Oracle and accounting systems, so data flows without manual entry.
Explore All IntegrationsA CMMS for HVAC contractors and facility teams — work orders, PM schedules, asset records, spare parts, refrigerant inventory, digital inspections and compliance in one platform, built for multi-site seasonal work.
Work order books, whiteboard PM schedules, refrigerant binders and wall-calendar cert expiries all become digital records. Technicians get assignments on mobile, capture photos and readings at the asset and close with an e-signature — so the audit trail builds itself.
Yes. The scheduler supports calendar-based, seasonal, runtime-based and deadline-driven triggers — often combined on the same asset. Every scheduled task auto-generates a work order with linked SOP, spare parts and assigned technician.
Yes. The app works fully offline — technicians pull up asset history, complete work orders, log refrigerant transactions and capture readings without connectivity, and everything syncs when a connection returns. Available for iOS, Android and rugged tablets.
Yes. Refrigerant purchases, recharges, recoveries, cylinder IDs and technician certification are logged against the work order that used them. Tower test results attach to the asset, cert expiries trigger renewal alerts, and evidence bundles export by asset, date or standard.
Yes — Trane Tracer, Johnson Controls Metasys, Honeywell, Siemens Desigo and Schneider, through BACnet and Modbus. Health signals flow from the BMS into the CMMS, so compressor vibration drift or a coil pressure change becomes a work order without monitoring two systems.
Join 1,000+ maintenance teams running work orders, PM schedules, spare parts, inspections and compliance in one CMMS.