Scraps Inventory Management

Track and manage scrapped materials with OxMaint's powerful CMMS. Monitor disposal methods, environmental impact, hazardous waste, and recovery rates—reduce waste costs by 35% and ensure full EHS compliance.

Scraps Inventory

Trusted by over 1000+ clients across the world

brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands
brands

Complete Scrap Solution

6-Step Scrap Management Workflow

Everything you need for waste management. From logging scrap to disposal tracking, each step ensures compliance and cost recovery.

1
Log Scrap
Work Order Link
2
Scrap Details
Qty & Value
3
Disposition
Method & Location
4
Approval
EHS & Manager
5
Compliance
Env. Clearance
6
Dispose
Complete & Track

Basic Information

Create New Work Order Scrap

Log scrapped materials directly from work orders with comprehensive tracking. Link to specific work orders, materials, assets, and document the root cause for complete traceability and analysis.

Work Order Linking

Connect scrap entries to specific work orders for accurate job costing and tracking.

Material Selection

Select from inventory materials to track exactly what was scrapped and why.

Asset Association

Link scrap to specific assets to identify equipment with high scrap rates.

Scrap Reason Codes

Categorize scrap with predefined reason codes for trending and root cause analysis.

Description Field

Add detailed descriptions explaining the circumstances of the scrap event.

Root Cause Documentation

Document root cause for each scrap event to prevent future occurrences.

Create New Work Order Scrap
Basic Information
Select work order
Select material
Select asset
Defective Part
Enter description
Manufacturing defect detected during installation
Defective Part Expired Damaged Obsolete

Value Tracking

Scrap Details & Cost Analysis

Track the full financial impact of scrapped materials. Calculate total value, recovery potential, and disposition costs to optimize your waste management and maximize recovery rates.

Quantity & Unit Tracking

Record exact quantities with unit of measure (PCS, KG, LTR) for accurate inventory.

Unit Cost Capture

Auto-populate unit cost from inventory or enter manually for accurate valuation.

Total Value Calculation

Automatically calculate total scrap value (Quantity × Unit Cost) for reporting.

Recovery Value

Track expected recovery from recycling, resale, or salvage operations.

Disposition Cost

Record disposal fees, transportation, and handling costs for true net loss.

Net Loss Analysis

Calculate net loss (Total Value - Recovery + Disposition Cost) automatically.

Scrap Details
Auto-Calculate
25.00
PCS
$45.00
$1,125
$225
$50
Net Loss: $950.00 Total - Recovery + Disposition
20% Recovery

Disposal Tracking

Disposition Information Management

Track how scrapped materials are disposed of. Record disposition methods, locations, dates, and waste manifest numbers for complete regulatory compliance and audit trails.

Disposition Method

Select disposal method: Recycle, Landfill, Incineration, Resale, or Return to Vendor.

Disposition Date

Record actual disposal date for compliance reporting and tracking timelines.

Disposition Location

Track where materials are sent—recycling facility, landfill, or vendor location.

Waste Manifest Number

Record EPA waste manifest numbers for hazardous materials compliance.

Transporter Tracking

Document waste transporters for chain of custody and liability tracking.

Disposal Certificates

Attach certificates of disposal for regulatory proof and audit readiness.

Disposition Information
Required
Recycle
25-12-2025
ABC Recycling Facility
WM-2025-001234
Available Disposition Methods
Recycle Selected
Landfill
Incineration
Return to Vendor

Approval Workflow

Approval Information & EHS Compliance

Implement approval workflows for scrap disposal. Track approval status, assign approvers, document comments, and ensure Environmental, Health & Safety (EHS) compliance before disposal.

Approval Status Tracking

Track status: Pending, Approved, or Rejected with complete audit trail.

Approver Assignment

Assign team members as approvers with notification and escalation rules.

Approval Comments

Document approval decisions and comments for compliance records.

Environmental Clearance

Toggle for environmental clearance requirement before disposal approval.

EHS Approval Flag

Require EHS team approval for hazardous or regulated materials.

Photo Documentation

Attach photos of scrapped materials for visual verification and records.

Approval Information
Workflow
Pending
Select approver
Enter approval comments
Status & Flags
Photos Attached
Environmental Clearance
EHS Approval
Parts

Master catalog with specs and pricing.

Stocks

Track quantities and locations.

Vendors

Supplier management and POs.

Scraps

Track scrapped and disposed items.

Inventory Suite

Part of Complete Inventory Management

OxMaint's scraps module integrates seamlessly with Parts, Stocks, and Vendors—creating a unified inventory ecosystem that tracks materials from procurement to disposal.

Work Order Integration

Link scrap directly to work orders for accurate job costing and material tracking.

Inventory Deduction

Automatically deduct scrapped materials from inventory with full audit trail.

Vendor Return Tracking

Track returns to vendors for credit, replacement, or warranty claims.

Integrated Modules

Scraps Connected to Every Module

OxMaint's scrap management integrates seamlessly with all maintenance and compliance modules for complete operational visibility.

Work Orders
Link scrap to jobs
Inventory
Auto inventory updates
Assets
Track asset scrap rates
Reports & Analytics
Scrap cost analysis
EHS
Safety compliance
Purchasing
Vendor returns
Documents
Disposal certificates
Team
Approver assignment

We are proud of our results

We bring solutions to make scrap management easier for our customers.

target

35%

Reduced Waste Costs

bar-chart

25%

Avg Recovery Rate

employees

100%

EHS Compliance

"Scrap tracking with root cause analysis helped us reduce waste by 35%. We now identify problem areas before they escalate."

Manufacturing Co.

Manufacturing

"Hazardous waste tracking with manifest numbers keeps us fully EPA compliant."

Chemical Corp

Chemical

"Recovery value tracking maximizes our recycling revenue."

Metal Works Inc.

Metals

"EHS approval workflow is seamless."

Energy Plus

Energy

FAQ

Frequently Asked Questions

Everything you need to know about OxMaint's scraps inventory management.

Regular Inventory (Parts and Stocks) tracks usable materials available for maintenance work. Scraps tracks materials that have been identified as unusable—defective parts, expired materials, damaged goods, or obsolete items. Scraps are linked to work orders to understand where waste occurs, tracked for financial impact, and managed through disposal workflows to ensure proper handling and compliance.

Scrap Reason Codes are predefined categories that explain why materials were scrapped. Common codes include: Defective Part, Expired, Damaged in Transit, Damaged in Storage, Obsolete, Wrong Part Ordered, Contaminated, and Warranty Return. These codes enable trending and analysis to identify recurring issues and implement preventive measures.

When scrap is logged, it enters a Pending status. An assigned approver reviews the scrap details, disposition method, and supporting documentation. They can Approve or Reject with comments. For hazardous materials or high-value items, additional flags like Environmental Clearance and EHS Approval can be required before final approval, ensuring proper oversight and compliance.

A Waste Manifest Number is a tracking document required by EPA (Environmental Protection Agency) for transporting hazardous waste. It tracks the waste from your facility (generator) through transportation to the final disposal site. OxMaint lets you record manifest numbers for each scrap entry to maintain regulatory compliance and prove proper disposal during audits.

Recovery Rate = (Recovery Value ÷ Total Value) × 100%. It measures how much value you recover from scrapped materials through recycling, resale, or salvage. A higher recovery rate means less net loss. OxMaint tracks this metric across all scrap entries and displays the average recovery rate on your dashboard to help optimize your disposal strategy.

Take control of your waste management today.

Track scrapped materials, ensure EHS compliance, and maximize recovery value. Perfect for maintenance and operations teams.

OxMaint is available to download from both App Store and Google Play Store.

iphone