Transform how your organization manages documents. Upload any file, let AI extract insights, search in plain English, and discover hidden patterns—all with 99.7% accuracy across 50+ file formats.
From upload to insights, transform your document management with OxMaint's AI-powered document intelligence system.
Advanced AI extracts key information, metadata, and insights from any document format. OCR technology reads scanned documents with 99.7% accuracy, automatically tags content, and generates summaries.
Extract text from scanned documents and images.
AI categorizes and tags documents automatically.
Get AI-generated summaries and key points.
Process documents in 50+ languages.
Industry-leading processing accuracy.
PDF, DOCX, Excel, Images, and more.
Advanced AI extracts key information, metadata, and insights from any document format
Natural language queries that understand context and meaning across all documents. Ask questions in plain English and get intelligent, context-aware search results with cross-document relationship mapping.
Ask questions like you would ask a colleague.
AI understands intent behind your search.
Find relationships between documents.
AI-powered content suggestions.
Lightning-fast search results.
Results sorted by match percentage.
AI analyzes patterns in your maintenance logs, inspection reports, and other documents to predict future maintenance needs. Get early warnings, failure predictions, and performance optimization recommendations.
Predict equipment failures before they happen.
Analyze trends across document types.
Early warnings and risk identification.
AI-driven recommendations for improvements.
Identify recurring issues and causes.
Actionable maintenance recommendations.
AI analyzes patterns to predict maintenance needs and operational insights
Pump P-101: Bearing wear detected. Estimated failure in 18 days based on maintenance log analysis.
Documents are connected in an intelligent knowledge network. See relationships between assets, vendors, team members, and maintenance history. Complete traceability and compliance tracking.
Link documents directly to equipment.
Track vendor documents and metrics.
Complete audit trail and history.
Map documents to regulations.
Assign documents to team members.
Find related documents automatically.
Upload documents seamlessly with drag-and-drop functionality. Support for 50+ file formats including PDF, CSV, DOCX, JSON, TXT, EPUB, Photos, and Excel files. Link documents to assets, team members, and vendors.
PDF, CSV, DOCX, JSON, TXT, EPUB, Excel & more.
Associate documents with specific equipment.
Assign documents to responsible teams.
Connect documents to vendor records.
Custom tags for easy organization.
Upload from phone or tablet.
Upload a new document to the system. Only PDF, CSV, DOCX, JSON, TXT, EPUB, Photos, and Excel files are allowed.
Our AI can process and extract insights from any document type in your organization—from technical manuals to inspection reports.
Industry-leading accuracy and speed for document intelligence processing.
Processing Accuracy
Search Response
File Formats Supported
"The AI-powered search is incredible. We can ask questions in plain English and find exactly what we need in seconds."
Industrial Mfg Co.
Manufacturing
"OCR processing has eliminated manual data entry. Documents are automatically indexed and searchable."
Facility Services Inc.
Facility Management
"Predictive analytics from our maintenance logs has helped us prevent equipment failures before they happen."
PowerGen Utilities
Utilities
"Knowledge graph integration connects all our documents. We can trace any issue back to its source documentation."
Global Logistics
Transportation
Everything you need to know about OxMaint's AI-Powered Document Intelligence.
OxMaint Document Intelligence supports 50+ file formats including PDF, CSV, DOCX, JSON, TXT, EPUB, Photos (JPEG, JPG, PNG), and Excel files (XLSX, XLS). Our AI can process and extract insights from any document type commonly used in maintenance operations.
Our advanced OCR (Optical Character Recognition) technology automatically extracts text from scanned documents, images, and PDFs with 99.7% accuracy. The AI then processes this text to automatically tag, categorize, and index the content for semantic search. Multi-language support ensures documents in any language are properly processed.
Semantic search allows you to ask questions in plain English and get intelligent, context-aware results. Unlike traditional keyword search, semantic search understands the meaning and intent behind your query. For example, asking "What maintenance is due for pump P-101?" will find relevant documents even if they don't contain those exact words.
The Knowledge Graph creates an intelligent network connecting all your documents to assets, vendors, team members, and maintenance history. This allows you to see relationships between documents, trace compliance requirements, correlate vendor performance, and maintain complete traceability across your organization.
Predictive Analytics uses AI to analyze patterns in your maintenance logs, inspection reports, and other documents to predict future maintenance needs. It can identify failure patterns, provide early warnings, analyze trends across document types, and recommend performance optimizations—helping you prevent issues before they occur.
Intelligent document processing with 99.7% accuracy. OCR extraction, semantic search, predictive analytics, and knowledge graph integration—all in one platform.
OxMaint is available to download from both App Store and Google Play Store.
