In a plant, maintenance software earns its keep by protecting output. That means recording downtime against assets, having spares on the shelf, running PM on the hours machines actually work and keeping a failure history good enough for root cause reviews.
Limble lists downtime reporting on every plan, which is a real strength, while spare parts, meter scheduling and offline mode are on Premium+ and multi-location tools on Enterprise, according to its plan comparison on November 15, 2026. This page compares plant needs with Oxmaint AI Agentic.

The plant view: lost hours, spares and PM
Plants judge a CMMS by uptime. Compare where the features that protect uptime sit on each product.
Key takeaways
- Limble lists downtime reporting with MTBF and MTTR on every plan, including Standard.
- Spare parts, meter scheduling and offline mode are on Limble Premium+; multi-location on Enterprise.
- Oxmaint AI Agentic records downtime hours on work orders and includes parts and running-hours PM.
- Agentic is $49 per seat annually or $59 monthly; Oxmaint AI runs in a web browser and is not sold as an offline app.
What a plant needs
- Downtime recorded against the asset that caused it.
- Critical spares tracked with bins and minimums.
- PM on running hours for machines whose load varies.
- A deep asset tree from line to component.
- Failure history clear enough for root cause work.
How Limble's plans line up
Limble's Standard plan includes downtime reporting, unlimited PMs and asset hierarchies, which covers a lot. Spare parts, purchase orders, bills of materials, meter scheduling, anomaly detection and offline mode are listed on Premium+. Multi-location tools, custom roles and integrations with business systems are on Enterprise. Most plants with a storeroom will be comparing Premium+ at minimum.

How Oxmaint AI Agentic covers plant work
Agentic includes work orders with downtime hours recorded by people, PM on calendar time or a running-hours meter, an unlimited asset tree, the parts module with purchase orders, site records and the AI features listed on the plan. Oxmaint AI does not connect to PLCs or sensors to raise work, and it is not sold as an offline app.
| Plant need | Limble plan that lists it | Oxmaint AI Agentic |
|---|---|---|
| Downtime reporting | Standard and up | Downtime hours on work orders |
| Spare parts | Premium+ and up | Parts module |
| Meter PM | Premium+ and up | Running-hours meter |
| Offline phone work | Premium+ and up | Not offered |
| Multiple plants | Enterprise | Site records and all-sites view |
Turning downtime into decisions
Each month, rank assets by downtime hours. The top handful usually explain most lost output. For each, check three things: are its PMs on time, are its critical spares on the shelf, and does its failure history point to one recurring cause? That review turns raw downtime into a short list of fixes.
Building the tree for root cause
Model critical machines down to sub-assemblies and components, so failures are logged where they occur. A gearbox that fails three times shows up clearly only if the gearbox has its own node. Keep naming consistent so reports roll up by line.
Oxmaint AI Agentic is $49 per seat per month billed annually ($588 per seat per year), or $59 per seat billed monthly, with a 2-seat minimum. Downtime logging, parts and the AI features listed on Agentic are part of that seat price.
Where Limble has the edge
If technicians close work in areas with no signal, Limble Premium+ offers offline mode and Oxmaint AI does not. If you want IoT sensor integrations or threshold-driven actions, Limble lists those on Premium+ and above. For plants with good coverage that want parts, hours-based PM and downtime at a published price, Agentic is worth a trial.
Frequently asked questions
Does Limble Standard include downtime reporting?
Yes. Limble lists downtime reporting with MTBF and MTTR on every plan, as of November 15, 2026.
How does Oxmaint AI record downtime?
People record downtime hours on work orders against the asset.
Does Oxmaint AI integrate with PLCs or sensors?
No. It does not raise work orders from PLCs or sensors.
What does Oxmaint AI Agentic cost?
$49 per seat per month billed annually or $59 monthly, with a 2-seat minimum.
Editorial review
Written on November 15, 2026. Limble plan names and plan contents were read from limble.com/pricing on that date; Limble does not list prices there, so none are quoted. Oxmaint AI statements follow the October 13, 2026 price lock and current feature rulings.
Protect output, not just tickets
Model one line in Oxmaint AI Agentic and compare with the Limble plan you would need.
Related reading on Oxmaint
Sources
Oxmaint AI plan details reflect pricing locked October 13, 2026 and features as of November 15, 2026, and may change. Plant and team examples are illustrative composites, not customer results.
Limble is a trademark of its owner. Oxmaint AI is not affiliated with, endorsed by, or sponsored by Limble. Comparisons are based on Limble's publicly available pricing and plan comparison page as checked on November 15, 2026; plans may change, so confirm on limble.com before deciding.