A two-to-five person maintenance team covers everything: breakdowns, PM, parts, contractors and the occasional project. There is no planner and no storeroom clerk, so the CMMS has to be quick to use and cover the basics without a long setup.
UpKeep describes Essential as for small teams getting off paper, at $24 per user per month, but PM scheduling and inventory start on Premium, according to its pricing page on November 15, 2026. Oxmaint AI Pro includes PM and parts from a 2-seat minimum. This page helps small teams choose.

Small team, full toolkit
Two to five people still need PM, parts and a clear backlog. Here is how to choose without overbuying.
Key takeaways
- UpKeep Essential is listed at $24 per user per month without PM scheduling or inventory.
- PM scheduling, checklists and parts start on UpKeep Premium.
- Oxmaint AI Pro includes work orders, PM on calendar dates or meter readings, assets and parts from 2 seats.
- Two Pro seats cost $38 a month billed annually or $46 billed monthly.
What a small team really needs
- One list of open work, sorted by priority.
- PM on the machines that hurt most when they fail.
- Spares for critical assets, with a minimum level.
- A simple way for others to report problems.
- History on each asset, so nobody relies on memory.
Essential or Premium?
UpKeep Essential gives unlimited work orders and locations, requests and 250 Nova AI credits a month. That is enough to replace a whiteboard. Once you want scheduled PM or parts tracking, UpKeep lists those on Premium, at a higher per-user price. Most small teams that care about planned work end up comparing Premium.

What Oxmaint AI Pro includes
Pro includes work orders, requests that become work orders automatically or wait for a coordinator, PM on calendar dates or meter readings, an unlimited asset tree, the parts module and purchase orders with vendor, line items, value and an approve or deny step. Technicians use the web portal in a phone browser. Pro starts at two seats.
A one-week setup
- Day 1: list your ten most critical assets and add them.
- Day 2: write short PM task lists for each.
- Day 3: add spares for those assets with minimum levels.
- Day 4: agree how operators report problems.
- Day 5: close every job in the system and review on Friday.
Keeping it light
Small teams cannot afford admin work. Keep task lists short, ask for three things on each closed job (what was found, what was done, parts used) and add assets as you work on them instead of loading everything at once. The system should save time within the first month.
Costs side by side
| Item | UpKeep Premium | Oxmaint AI Pro |
|---|---|---|
| PM scheduling | Included | Included |
| Parts and inventory | Included | Included |
| AI | Credit allowance | Not on Pro; listed on Agentic |
| Two-seat monthly total | Two users at UpKeep's Premium list price | $38 annual billing or $46 monthly |
Covering absences
In a team of three, one person on holiday is a third of the workforce. Keep job notes and asset history good enough that anyone can pick up a machine they rarely touch. Schedule PMs so they are spread across the team, and use the open work list in your morning catch-up so nothing depends on one person's memory.
When to stay on UpKeep
If your team is happy on Essential without PM, or relies on UpKeep's AI credits, there may be little reason to move. If you want PM and parts without paying for a higher rung, compare the totals for your actual seat count.
Oxmaint AI Pro is $19 per seat per month billed annually ($228 per seat per year), or $23 per seat billed monthly, with a 2-seat minimum. Work orders, PM, assets and parts are part of Pro.
Frequently asked questions
Does UpKeep Essential include PM scheduling?
No. UpKeep lists PM scheduling from Premium, as of November 15, 2026.
What is the smallest Oxmaint AI plan?
Pro with a 2-seat minimum.
What do two Pro seats cost?
$38 a month billed annually or $46 billed monthly.
What does Oxmaint AI Pro cost per seat?
$19 per seat per month billed annually or $23 monthly, with a 2-seat minimum.
Editorial review
Written on November 15, 2026. UpKeep plan names, prices and plan contents were read from upkeep.com/pricing on that date. Oxmaint AI statements follow the October 13, 2026 price lock and current feature rulings.
Start with two seats
Set up your top ten assets on Oxmaint AI Pro in a week.
Related reading on Oxmaint
Sources
Oxmaint AI plan details reflect pricing locked October 13, 2026 and features as of November 15, 2026, and may change. Plant and team examples are illustrative composites, not customer results.
UpKeep is a trademark of its owner. Oxmaint AI is not affiliated with, endorsed by, or sponsored by UpKeep. Comparisons are based on UpKeep's publicly available pricing page as checked on November 15, 2026; plans and prices may change, so confirm on upkeep.com before deciding.