Complete CMMS solution for property management

Maximize tenant satisfaction, optimize maintenance workflows, and reduce costs with intelligent property management designed specifically for apartment complexes and rental properties.

Property Management CMMS Solution

Complete maintenance platform for rentals

Unit Tracking

Real-time property monitoring

Preventive PM

Automated scheduling

Work Orders

Digital management

Analytics

Performance insights

Our Features

Built for Property Management Operations

Complete maintenance management tools designed specifically for apartments, condos, multi-family housing, and rental properties

Digital Property Inspections

Customizable checklists for unit turnovers, move-in/move-out inspections, and preventive maintenance.

Preventive Maintenance Scheduling

Schedule maintenance based on time intervals, seasonal requirements, or property condition assessments.

Work Order Management

Create, assign, and track tenant requests with priority levels and real-time completion tracking.

Regulatory Compliance

Maintain compliance with housing codes, safety regulations, and HOA requirements effortlessly.

Property Performance Tracking

Monitor maintenance costs, tenant satisfaction, occupancy rates, and property value metrics in real-time.

Mobile-First Platform

Empower tenants and maintenance staff with mobile access to work orders, inspections, and property records.

MOBILE SOLUTION

Mobile App for Tenants & Maintenance Teams

Equip your tenants and maintenance staff with a mobile app designed for property management:

  • Submit maintenance requests directly from mobile devices
  • Access unit history, maintenance logs, and lease information
  • Report issues, damages, and repairs instantly with photos
  • Track work order status and communicate with staff
  • Complete inspections offline and sync when connected

Mobile Property Management App

For Tenants & Maintenance Staff

Tenant Request Portal

Submit requests from anywhere

Access History

Unit logs & lease information

Instant Reporting

Report issues & damages instantly

Photo Documentation

Photos, signatures & notes

Analytics Dashboard

Real-Time Property & Tenant Insights

Make data-driven decisions with comprehensive property management analytics:

  • Live dashboards showing unit status, maintenance schedules, and work order tracking
  • Tenant satisfaction scoring and retention analysis
  • Custom analytics on property performance and maintenance efficiency
  • Automated alerts for lease renewals and maintenance due dates
  • Historical reporting with trend analysis and predictive maintenance insights
See Dashboard Demo

Real-Time Analytics Dashboard

Property & Tenant Insights

Live Property Dashboard

Real-time status & schedules

Tenant Satisfaction

Scoring & retention analysis

Property Analytics

Performance & efficiency metrics

Automated Alerts

Lease & maintenance notifications

Safety & Compliance

Housing Standards & Audit-Ready Documentation

Pre-configured inspection templates ensure compliance with property safety regulations:

  • Inspection forms for apartments, common areas, amenities, and building systems
  • Move-in/move-out inspection checklists with condition documentation
  • Complete audit trails with timestamps, photos, and digital signatures
  • Automated compliance reporting for housing codes and safety regulations
  • Customizable templates for specific property types and HOA requirements
View Safety Checklists

Safety & Compliance Checklists

Audit-Ready Documentation

Property Inspection Forms

Units, common areas, amenities, systems

Move-In/Move-Out Inspections

Condition documentation checklists

Complete Audit Trails

Timestamps, photos, digital signatures

Compliance Reporting

Housing code automated reports

Why Choose Oxmaint

Benefits for Property Managers and Landlords

Increase Tenant Satisfaction

Improve tenant retention by up to 40% with faster response times and better communication throughout the maintenance process.

Ensure Compliance

Stay compliant with housing codes and safety standards through automated documentation and inspection records.

Reduce Operating Costs

Cut property maintenance costs by 30% through preventive maintenance and efficient vendor management.

Real Results from Property Managers Using Oxmaint

42% Increase in Tenant Retention

A multi-family property management company with 450 apartment units across 8 properties increased tenant retention by 42% and reduced maintenance costs by 35% after implementing Oxmaint's property management platform, saving over $380,000 annually.

35% Lower

Maintenance costs with Oxmaint

$380,000 Saved

Annual cost reduction with Oxmaint

100% Compliant

Perfect housing code compliance record

Trusted by Property Managers Nationwide

"Oxmaint transformed our property operations. Work order response time dropped from 48 hours to under 4 hours, and tenant complaints decreased by 65%. The mobile app is perfect for our residents and maintenance team, and compliance tracking helped us pass our housing inspection with perfect scores."

Property Operations Manager

Multi-Family Housing - 450 units

"The preventive maintenance scheduling is outstanding. We extended our appliance lifespan by 5 years and improved tenant satisfaction scores by 55%. The cost tracking helps us stay on budget, and the audit trail made our HOA inspection seamless."

Property Manager

Condominium Association - 280 units

Latest Posts

predictive-maintenance-for-elevator-ai-detection-of-door-fault
Read More

Predictive Maintenance for Elevator: AI Detection of Door Fault

Door faults don't happen suddenly—they develop over time. A door that will fail next week is already showing signs today: slightly longer close times, increased motor current, more frequent reopens....

elevator-inspection-guide-&-report-template
Read More

Elevator Inspection Guide & Report Template

State elevator inspections aren't optional—they're legally mandated annual requirements with serious consequences for failure. A failed inspection means shutdown orders, emergency repairs at premium rates, and...

elevator-controller-fault-checklist
Read More

Elevator Controller Fault Checklist

The controller is the elevator's brain—when it fails, everything stops. Unlike door faults that cause nuisance callbacks, controller failures mean complete shutdowns, stranded passengers, and emergency service...

elevator-door-fault-checklist
Read More

Elevator Door Fault Checklist

Door faults cause 80% of elevator service calls. Doors that won't close, reopen repeatedly, or slam shut create tenant complaints, entrapment risks, and expensive emergency callouts. Most door issues start...

asset-master-workflow-for-elevator-teams
Read More

Asset Master Workflow for Elevator Teams

Elevator maintenance isn't optional—it's legally mandated, safety-critical, and tenant-impacting. A single elevator outage in a high-rise creates immediate accessibility issues, ADA complaints, and frustrated...

tenant-maintenance-request-and-resolution-workflow-for-properties
Read More

Tenant Maintenance Request and Resolution Workflow for Properties

Every unanswered maintenance request is a lease renewal at risk. Tenants expect Amazon-speed responses—submit a request, get instant confirmation, see real-time status. Properties still using phone calls,...

planned-maintenance-shutdown-strategy-for-property-operations
Read More

Planned Maintenance Shutdown Strategy for Property Operations

Major building systems require periodic shutdowns for maintenance—boilers, chillers, elevators, electrical panels, water heaters. Without proper planning, these shutdowns become tenant nightmares. Surprise...

purchase-order-and-spare-parts-procurement-workflow-for-properties
Read More

Purchase Order and Spare Parts Procurement Workflow for Properties

Property maintenance purchasing is chaos without a system. Technicians buy parts on personal cards, invoices pile up unmatched, and nobody knows what was spent until month-end surprises. Maverick...

spare-parts-inventory-optimization-for-property-maintenance
Read More

Spare Parts Inventory Optimization for Property Maintenance

Nothing derails a maintenance repair faster than discovering the needed part isn't in stock. Technicians wait, tenants complain, and emergency orders cost 3-5x normal pricing. Yet the opposite...

workforce-management-and-labor-productivity-tracking-for-properties
Read More

Workforce Management and Labor Productivity Tracking for Properties

Property maintenance managers face a constant challenge: ensuring technicians are productive, accountable, and properly allocated across properties. Without visibility into where time goes, labor costs spiral...

document-intelligence-for-sops,-manuals,-and-compliance-records
Read More

Document Intelligence for SOPs, Manuals, and Compliance Records

Property maintenance teams drown in documentation. SOPs scattered across shared drives, equipment manuals buried in filing cabinets, compliance certificates stuffed in binders that nobody can find when...

maintenance-kpi-dashboards-for-property-asset-performance
Read More

Maintenance KPI Dashboards for Property Asset Performance

Property managers who rely on gut feelings and spreadsheets are flying blind. Without real-time visibility into maintenance performance, small problems become expensive emergencies, tenant complaints pile up,...

enterprise-integrations-for-property-management-(erp,-iot,-identity)
Read More

Enterprise Integrations for Property Management (ERP, IoT, Identity)

Property operations are often trapped in a web of disconnected systems: one login for leasing, another for maintenance, and a third for door access. This "swivel chair" management style results in rampant data...

property-maintenance-audit-and-compliance-readiness-guide
Read More

Property Maintenance Audit and Compliance Readiness Guide

Surprise inspections and regulatory audits often trigger a "mad scramble" in property management offices—frantically hunting for paper logs, calling vendors for missing certificates, and praying the inspector...

preventive-maintenance-scheduling-framework-for-property-operations
Read More

Preventive Maintenance Scheduling Framework for Property Operations

"Run-to-failure" is the most expensive maintenance strategy in existence—yet it remains the default for many property teams. Waiting for equipment to break leads to emergency overtime costs, expedited shipping...

work-order-management-workflow-for-property-maintenance-teams
Read More

Work Order Management Workflow for Property Maintenance Teams

Disorganized maintenance requests create immediate operational chaos—technicians drive back and forth for parts, residents call repeatedly for updates, and billable hours slip through the cracks. Yet most...

root-cause-analysis-of-parking-gate-failures-in-property-environments
Read More

Root Cause Analysis of Parking Gate Failures in Property Environments

Parking gate failures create immediate operational chaos—vehicles stack up at entrances, residents miss appointments, and unauthorized access goes unchecked until repairs are complete. Yet most properties...

parking-gate-inspection-checklist-for-property-access-control
Read More

Parking Gate Inspection Checklist for Property Access Control

Parking gates represent the first line of defense for property security and the first impression for every visitor, tenant, and delivery driver entering your facility. When these systems fail, the consequences...

root-cause-analysis-of-intercom-system-failures-in-property-assets
Read More

Root Cause Analysis of Intercom System Failures in Property Assets

Intercom system failures rarely occur in isolation—they emerge from underlying conditions that, left unaddressed, guarantee repeated breakdowns. Property managers responding only to symptoms find themselves...

intercom-system-predictive-maintenance
Read More

Predictive Maintenance for Intercom Systems Using AI Monitoring

Intercom systems serve as the communication backbone of modern properties—enabling secure access control, emergency notifications, and resident-to-visitor communication. When these systems fail unexpectedly,...

intercom-system-failure-scenarios-and-troubleshooting-for-property-managers
Read More

Intercom System Failure Scenarios and Troubleshooting for Property Managers

Lighting systems in commercial and residential properties fail at predictable rates—and when they do, the consequences extend far beyond inconvenience. Emergency exits go dark, parking structures become...

intercom-inspection-and-functionality-reporting-template-for-properties
Read More

Intercom Inspection and Functionality Reporting Template for Properties

Manual intercom testing logs create compliance gaps that expose property managers to security liability during building audits. A digital functionality reporting template standardizes testing protocols, forcing...

root-cause-analysis-of-rooftop-water-tank-failures-in-property-operations
Read More

Root Cause Analysis of Rooftop Water Tank Failures in Property Operations

Recurring tank failures are rarely accidents; they are evidence of missed root causes. Property managers often treat symptoms—patching leaks or repainting rust—while the underlying structural pathology...

predictive-maintenance-for-rooftop-water-tanks-using-ai-&-iot
Read More

Predictive Maintenance for Rooftop Water Tanks Using AI & IoT

Traditional water storage is a "black box" infrastructure: invisible degradation leads to reactive, costly failures. By integrating IoT telemetry and Machine Learning (ML) at...

predictive-maintenance-for-rooftop-water-tanks-using-ai-&-iot
Read More

Predictive Maintenance for Rooftop Water Tanks Using AI & IoT

Traditional water storage is a "black box" infrastructure: invisible degradation leads to reactive, costly failures. By integrating IoT telemetry and Machine Learning (ML) at...

rooftop-water-tank-failure-risks-and-troubleshooting-for-property-managers
Read More

Rooftop Water Tank Failure Risks and Troubleshooting for Property Managers

Neglected rooftop water tanks are silent ticking time bombs: hidden sediment buildup accelerates corrosion, while breached lids invite contamination from pests and debris. Without regular inspection, property...

rooftop-water-tank-inspection-and-hygiene-reporting-template
Read More

Rooftop Water Tank Inspection and Hygiene Reporting Template for Properties

Paper-based tank logs are prone to errors, loss, and falsification, leaving property managers legally exposed during health audits. A digital hygiene reporting template standardizes data collection, forcing...

rooftop-water-tank-inspection-checklist
Read More

Rooftop Water Tank Inspection Checklist for Property Water Storage

Neglected rooftop water tanks are silent ticking time bombs: hidden sediment buildup accelerates corrosion, while breached lids invite contamination from pests and debris. Without regular inspection, property...

lighting-system-failure-rca
Read More

Root Cause Analysis of Lighting System Failures in Property Assets

A flickering corridor light is often dismissed as a nuisance, but to a trained facility engineer, it is a data point indicating a deeper systemic failure. When property managers treat lighting failures as...

predictive-maintenance-for-lighting-systems-using-smart-analytics
Read More

Predictive Maintenance for Lighting Systems Using Smart Analytics

The alert pings at midnight: AI detects unusual vibration patterns in hallway lighting fixtures across 15 properties. Predictive analytics flags impending ballast failures 72 hours before outages occur. Without...

lighting-system-failure-causes-and-troubleshooting
Read More

Lighting System Failure Causes and Troubleshooting for Property Operations

The call comes at 2 AM: a tenant tripped in a dark hallway because the lighting system failed. Safety concerns escalate, emergency services struggle to navigate, and management faces liability questions about...

lighting-system-inspection-and-energy-reporting
Read More

Lighting System Inspection and Energy Reporting Template for Properties

The tenant complaint reads: "Parking garage lights have been flickering for weeks. My car was broken into last night in the dark corner." Now you're facing a liability claim, insurance investigation, and the...

access-control-system-failure-rca
Read More

Root Cause Analysis of Access Control System Failures in Properties

The same card reader fails for the third time this month. Your technician replaces it again, bills you $450 in labor and parts, and promises it's fixed. Two weeks later, you're back to square one—angry...

ai-enabled-predictive-maintenance-for-access-control-systems
Read More

AI-Enabled Predictive Maintenance for Access Control Systems

Your access control system just locked out 200 employees during the morning rush. The card readers showed no warning signs—until they all failed simultaneously. Now you're facing angry tenants, emergency...

access-control-system-common-failures
Read More

Access Control System Failure Risks and Troubleshooting for Property Managers

The call comes at 3 AM: residents locked out of their own building. The card reader shows a blinking red light. The keypad accepts no codes. Security footage shows a delivery driver holding the door open for...

parking-gate-inspection-and-safety-reporting
Read More

Parking Gate Inspection and Safety Reporting Template for Properties

The call comes at 6 AM: residents trapped inside the parking garage because the gate won't open, delivery trucks blocking the entrance, and frustrated commuters late for work. Security vulnerabilities escalate...

ai-driven-predictive-maintenance
Read More

Parking Gate Failure Causes and Troubleshooting for Property Operations

A parking gate that fails during morning rush hour doesn't just create traffic—it creates liability. When tenants can't enter, deliveries stack up, and emergency access becomes questionable, property managers...

ai-driven-predictive-maintenance-for-parking-gate
Read More

AI-Driven Predictive Maintenance for Parking Gate Systems

It's Monday at 7:43 AM. The parking gate won't lift. Forty-seven cars are backed up, tenants are calling the office, and your emergency technician quotes $3,400 for an urgent motor replacement. The same repair...

intercom-system-inspection
Read More

Intercom System Inspection Checklist for Property Communication Systems

The call comes at 2 AM: a tenant locked out because the building intercom won't connect to their unit. Security concerns escalate, emergency services struggle to reach residents, and management faces liability...

lighting-system-inspection-checklist
Read More

Lighting System Inspection Checklist for Property Infrastructure

The call comes at 11 PM: an entire parking garage level plunged into darkness. Three residents report near-misses on the stairs. Security cameras show nothing but black screens. By morning, you're drowning in...

access-control-system-inspection
Read More

Access Control Inspection and Audit Reporting Template for Properties

The unauthorized entry happens at 2:47 AM on a Saturday. By the time security reviews footage Monday morning, the intruder has had 55 hours inside your facility. This scenario isn't hypothetical—it's a pattern...

rooftop-water-tank-inspection-report-template
Read More

Rooftop Water Tank Inspection and Hygiene Reporting Template for Properties

The lab results arrive on a Tuesday morning: coliform bacteria detected. Within 24 hours, you must notify the health department, arrange emergency tank cleaning, and explain to 200 residents why their drinking...

fire-sprinkler-system-common-failures
Read More

Fire Sprinkler System Failure Risks and Troubleshooting for Property Managers

The fire department's post-incident report will list the cause: sprinkler system failure. But here's what actually happened—someone closed a valve during maintenance six months ago and never reopened it....

water-pump-inspection-checklist
Read More

Water Pump Inspection Checklist for Building Water Systems

A tenant calls at 7 AM—no water pressure on the 12th floor. By the time your maintenance team arrives, the booster pump has seized completely. The building's 200 residents are without adequate water for...

make-ready-and-turnover-maintenance-case-study-for-co-working-spaces
Read More

Make-Ready and Turnover Maintenance: Case Study for Co-Working Spaces | Oxmaint CMMS for P...

FlexHub Co-Working was losing members faster than they could replace them. At 8% monthly churn—well above the 5% benchmark that separates profitable co-working spaces from struggling ones—their operations...

parking-and-access-control-maintenance-onboarding-toolkit-for-industrial-parks
Read More

Parking and Access Control Maintenance: Onboarding Toolkit for Industrial Parks | Oxmaint ...

Your new industrial park tenant signs the lease on Monday. By Wednesday, their delivery trucks can't get through the gate because the barrier arm sensor failed overnight. By Friday, you're fielding angry calls...

firelife-safety-digital-recordkeeping-workflow-automation-for-malls
Read More

Fire/Life Safety Digital Recordkeeping: Workflow Automation for Malls | Oxmaint CMMS for P...

The fire marshal doesn't schedule appointments. When inspectors walk through your mall's 200+ tenant spaces, food court kitchens, and mechanical rooms, they expect documentation immediately—not promises to...

water-systems-and-legionella-prevention-energy-optimization-for-commercial-towers
Read More

Water Systems and Legionella Prevention: Energy Optimization for Commercial Towers | Oxmai...

The cooling tower on your commercial building runs 24/7. So does the liability clock. Legionnaires' disease cases in the United States increased 900% between 2000 and 2018, and the trajectory hasn't reversed. In...

tenant-satisfaction-via-response-slas-executive-brief-for-co-working-spaces
Read More

Tenant Satisfaction via Response SLAs: Executive Brief for Co-Working Spaces | Oxmaint CMM...

Your HVAC failed at 2 PM on a Tuesday. By 3 PM, twelve members had complained. By 4 PM, three had posted on social media. By end of week, two cancelled memberships worth $790/month each in recurring revenue. The...

water-systems-and-legionella-prevention-roi-calculator-approach-for-student-housing
Read More

Water Systems and Legionella Prevention: ROI Calculator Approach for Student Housing | Oxm...

Student housing managers face a hidden liability that most don't discover until it's too late: the water sitting in residence hall pipes during summer break, winter recess, and spring vacation creates ideal...

green-building-certifications-via-cmms-data-governance-for-residential-communities
Read More

Green Building Certifications via CMMS: Data Governance for Residential Communities | Oxma...

Your residential community's sustainability story is written in data points: kilowatt-hours saved, gallons conserved, carbon emissions avoided. But when certification auditors arrive, that story needs...

parking-and-access-control-maintenance-iot-integration-plan-for-commercial-towers
Read More

Parking and Access Control Maintenance: IoT Integration Plan for Commercial Towers | Oxmai...

When your commercial tower's parking gate fails at 8:47 AM on a Monday, the problem isn't just mechanical—it's a cascade of tenant complaints, security vulnerabilities, and revenue loss that compounds by the...

water-systems-and-legionella-prevention-ai-predictive-analytics-for-co-working-spaces
Read More

Water Systems and Legionella Prevention: AI & Predictive Analytics for Co-Working Spaces |...

Your co-working space thrives on trust. Members share desks, meeting rooms, and amenities expecting a safe, professional environment. But hidden within your building's water system lurks a threat that has caused...

energy-audits-and-maintenance-analytics-energy-optimization-for-mixed-use-properties
Read More

Energy Audits and Maintenance Analytics: Energy Optimization for Mixed-Use Properties | Ox...

Mixed-use properties present a unique energy management puzzle. When retail spaces, office suites, and residential units share the same building, you're juggling vastly different consumption patterns, operating...

make-ready-and-turnover-maintenance-onboarding-toolkit-for-residential-communities
Read More

Make-Ready and Turnover Maintenance: Onboarding Toolkit for Residential Communities | Oxma...

The clock starts ticking the moment a resident returns their keys. Every day that unit sits empty costs you money—not just in lost rent, but in the cascading expenses of cleaning, repairs, marketing, and...

roofing-and-envelope-preventive-plans-data-governance-for-malls
Read More

Roofing and Envelope Preventive Plans: Data Governance for Malls | Oxmaint CMMS for Proper...

Shopping malls present a unique challenge for property managers: massive roof footprints spanning hundreds of thousands of square feet, complex building envelopes integrating glass atriums with flat membrane...

make-ready-and-turnover-maintenance-risk-assessment-for-industrial-parks
Read More

Make-Ready and Turnover Maintenance: Risk Assessment for Industrial Parks | Oxmaint CMMS f...

Industrial park managers face a high-stakes race against the clock every time a tenant vacates. The interval between one tenant's departure and the next tenant's occupancy represents far more than lost...

work-order-routing-and-prioritization-the-ultimate-guide-for-mixed-use-properties
Read More

Work Order Routing and Prioritization: The Ultimate Guide for Mixed-Use Properties | Oxmai...

Managing a mixed-use property is like conducting an orchestra where retail tenants want the spotlight during business hours, residents demand quiet after dark, and office occupants expect climate control...

water-systems-and-legionella-prevention-2025-best-practices-for-co-working-spaces
Read More

Water Systems and Legionella Prevention: 2026 Best Practices for Co-Working Spaces | Oxmai...

Co-working spaces thrive on shared resources—conference rooms, break areas, restrooms, and the water systems that serve them all. But that shared infrastructure creates a hidden liability that most operators...

iot-sensors-for-indoor-air-quality-workflow-automation-for-industrial-parks
Read More

IoT Sensors for Indoor Air Quality: Workflow Automation for Industrial Parks | Oxmaint CMM...

Industrial parks house everything from light manufacturing to logistics operations, each generating distinct airborne contaminants that affect tenant health, regulatory compliance, and operational efficiency....

capital-planning-from-asset-histories-the-ultimate-guide-for-co-working-spaces
Read More

Capital Planning from Asset Histories: The Ultimate Guide for Co-Working Spaces

Your co-working space's HVAC system is 11 years old. The manufacturer rated it for 15 years, but your maintenance records tell a different story: repair frequency increased 340% in the last 18 months, energy...

elevatorsescalators-compliance-scheduling-case-study-for-industrial-parks
Read More

Elevators/Escalators Compliance Scheduling: Case Study for Industrial Parks

Industrial parks face unique elevator compliance challenges that commercial office buildings never encounter. Freight elevators handling 10,000-pound loads operate under different stress patterns than passenger...

iot-sensors-for-indoor-air-quality-workflow-automation-for-co-working-spaces
Read More

IoT Sensors for Indoor Air Quality: Workflow Automation for Co-Working Spaces

The post-pandemic workforce transformed air quality from an invisible amenity into a visible competitive differentiator. Co-working spaces that display real-time air quality data on lobby screens and member apps...

work-order-routing-and-prioritization-executive-brief-for-residential-communities
Read More

Work Order Routing and Prioritization: Executive Brief for Residential Communities

The difference between high-performing residential communities and those struggling with maintenance backlogs rarely comes down to staffing levels or budgets. It comes down to routing intelligence. When every...

smart-building-cmms-rollouts-regulatory-compliance-guide-for-student-housing
Read More

Smart Building CMMS Rollouts: Regulatory Compliance Guide for Student Housing

The sprinkler heads had been inspected. Every fire extinguisher had been checked. Emergency lighting tests were complete. But with documentation scattered across filing cabinets, email threads, and contractor...

iot-sensors-for-indoor-air-quality-sla-design-for-commercial-towers
Read More

IoT Sensors for Indoor Air Quality: SLA Design for Commercial Towers

Your building manager receives an urgent call at 2:15 PM on a Thursday afternoon. A Fortune 500 tenant occupying floors 14-18 of your premium commercial tower is threatening to break their $4.2 million annual...

green-building-certifications-via-cmms-change-management-for-mixed-use-properties
Read More

Green Building Certifications via CMMS: Change Management for Mixed-Use Properties

The certification auditor arrived at your mixed-use property last Tuesday with a checklist spanning 847 requirements. By Wednesday afternoon, your LEED recertification was in jeopardy—not because your building...

firelife-safety-digital-recordkeeping-executive-brief-for-data-centers
Read More

Fire/Life Safety Digital Recordkeeping: Executive Brief for Data Centers

The email arrives at 6:47 AM on a Tuesday: "AHJ inspection scheduled for Thursday—please have all fire suppression records, emergency lighting test logs, and VESDA maintenance documentation ready for review."...

hvac-and-chiller-predictive-maintenance-change-management-for-industrial-parks
Read More

HVAC and Chiller Predictive Maintenance: Change Management for Industrial Parks

It's July 15th, the hottest day of the year. Building 7 of your industrial park loses its 500-ton chiller at 2:47 PM—three pharmaceutical tenants watch their cold storage temperatures climb, a data...

parking-and-access-control-maintenance-data-governance-for-data-centers
Read More

Parking and Access Control Maintenance: Data Governance for Data Centers | Oxmaint CMMS fo...

The mantrap serving your Tier III data center's secure corridor fails at 2:47 AM—a contractor with valid credentials stands trapped between two locked doors while the biometric reader...

tenant-satisfaction-via-response-slas-troubleshooting-handbook-for-industrial-parks
Read More

Tenant Satisfaction via Response SLAs: Troubleshooting Handbook for Industrial Parks

The loading dock gate at Building 7 has been stuck for 11 hours. Your largest logistics tenant—representing 23% of park revenue—has 14 trucks idling outside, drivers burning hours, and a regional...

iot-sensors-for-indoor-air-quality-executive-brief-for-commercial-towers
Read More

IoT Sensors for Indoor Air Quality: Executive Brief for Commercial Towers

Tuesday morning, 9:47 AM—your building management system alerts you to a CO₂ spike on floor 18. By 10:15 AM, six tenant complaints flood your inbox: headaches, drowsiness, "stuffy...

common-area-asset-tracking-and-care-the-ultimate-guide-for-mixed-use-properties
Read More

Common Area Asset Tracking and Care: The Ultimate Guide for Mixed-Use Properties

The lobby fountain stopped working three days ago. Retail tenants are complaining about the HVAC—again. A resident just posted a photo of the flickering hallway lights tagging your building. Meanwhile, your...

Total Posts:

PROPERTY INTEGRATIONS

Connected Ecosystem

Seamlessly integrate with property management software, accounting systems, and smart building platforms for complete visibility.

Explore all integrations

Transform Your Property Management Operations

Join leading property managers who trust Oxmaint to optimize their maintenance operations and maximize tenant satisfaction.