Coast Integration for Fleet Management

Connect Coast fuel cards to automatically import every transaction in real-time. Track fuel expenses per vehicle, calculate MPG, detect fraud, and correlate costs with maintenance activities. Eliminate manual receipt entry and gain complete fuel visibility.

1200k+ Active users Automated fuel tracking

Live Fuel Transaction Dashboard

$31,892

Fuel Spend (Month)

9.6

Avg MPG (Fleet)

9,214

Gallons (Month)

Live

Spend Controls

Recent Fuel Transactions

Today Van #1653 - 26.8 gal, $93.80

Today Truck #3287 - 45.2 gal, $158.20

Synced QuickBooks - All expenses posted

Zero

Manual Coast Receipt Entry

Instant

Coast Transaction Import

100%

Fuel Expense Tracking

Auto

MPG Calculation Record

Why Coast Fuel Cards?

Modern Coast Expense Management Platform

Coast provides modern digital expense management with real-time spend controls and seamless integration for Oxmaint

Real-Time Spend Control

Instant spending limits with real-time transaction visibility, customizable controls per vehicle or driver, and immediate alerts

Accounting Integration

Native QuickBooks and Xero integration with automatic expense categorization and seamless GL coding

Multi-Expense Platform

Beyond fuel tracking - manage all fleet expenses including maintenance, tolls, parking, and supplies in one platform

Digital-First Experience

Modern API with instant data sync, mobile app for drivers and managers, and automated receipt capture

Simple Process

How Coast Integration Works

Seamless fuel transaction data flow from Coast cards to maintenance tracking

Capture
Every Transaction
Import
Instant Sync
Sync
Auto Updates

Automatic Coast Transaction Import

Connect to Coast's modern API to automatically import every fuel purchase instantly. Each transaction includes date, time, station location, vehicle number, driver name, expense category, gallons, price per gallon, total cost, receipt image, and odometer reading. Transactions link automatically to vehicles by card assignment. Historical data from the past 12 months imports during setup for fuel trend analysis.

  • Instant transaction sync
  • Complete purchase details
  • Auto vehicle matching
  • 12-month historical data

Real-Time MPG & Fuel Cost Analytics from Coast Data

Automatically calculate MPG by comparing Coast purchases to GPS odometer data or manual entries. Cost per mile metrics combine fuel expenses with mileage for true operating costs. Fleet dashboards display average MPG, total spend, and efficiency comparisons. Anomaly detection flags unusual consumption patterns—sudden MPG drops indicate maintenance needs like dirty filters, tire issues, or engine problems.

  • Automatic MPG calculation
  • Cost per mile tracking
  • Efficiency trend analysis
  • Anomaly detection alerts
Calculate
Auto MPG
Analyze
Cost Trends
Detect
Anomalies

Maintenance Correlation & Coast Fraud Detection

Link Coast data to maintenance activities to identify cost patterns. Track fuel costs before and after repairs to validate effectiveness. Fraud detection compares purchase locations to GPS positions—alerts trigger when purchases occur far from vehicle locations. Monitor for suspicious activity like multiple fill-ups in short periods or after-hours transactions. Driver-specific cards provide accountability and identify training needs.

  • Maintenance impact analysis
  • GPS location verification
  • Real-time fraud detection
  • Driver accountability tracking

Fuel Analytics & Controls

9.4

Current MPG +4%

$0.26

Cost Per Mile

Spend Controls Active

Real-time limits enforced per vehicle

Automated accounting sync complete

Why Choose Oxmaint

Why Coast Integration

1

Eliminate Manual Coast Receipt Entry

Stop collecting handwritten receipts and typing data into spreadsheets. Coast integration automatically imports every purchase with complete details including receipt images. Save 8-12 hours weekly on manual entry. Eliminate data entry errors from illegible receipts or lost paperwork. Instant import keeps fuel data current without administrative delay.

2

Streamline Accounting with Coast Expense Sync

Automatically sync Coast fuel expenses to QuickBooks or Xero with proper GL coding and categorization. Eliminate manual accounting entry and reconciliation. Track fuel costs alongside maintenance expenses for complete vehicle cost analysis. Generate accurate financial reports combining fuel, maintenance, and other fleet expenses. Close books faster with automated expense integration.

3

Control Coast Fleet Spending in Real-Time

Set spending limits per vehicle or driver with instant enforcement. Receive real-time alerts when limits are approached or exceeded. Prevent unauthorized purchases before they happen. Monitor all fleet expenses beyond fuel including maintenance, tolls, and supplies. Use Coast's digital platform combined with Oxmaint's maintenance tracking for complete fleet cost control.

Powerful Features

Complete Fuel Management Capabilities

Everything you need for comprehensive fuel tracking and cost management

Automatic Coast Transaction Import

Instant import of every Coast purchase with complete details including date, time, station, driver, vehicle, gallons, price, receipt images, and cost from Coast's API.

Real-Time MPG from Coast Data

Automatic fuel efficiency calculation comparing Coast gallons to miles driven with historical trending and fleet-wide benchmarking.

Cost Per Mile from Coast Expenses

Precise cost per mile metrics combining Coast expenses with vehicle mileage for accurate operating cost analysis.

Coast Purchase Location Verification

Cross-reference Coast purchase locations with GPS vehicle positions to detect fraud and validate purchases occurred near actual locations.

Real-Time Spend Controls

Customizable spending limits per vehicle or driver with instant enforcement and real-time alerts when limits are approached.

Driver Accountability with Coast Cards

Individual driver Coast cards with transaction tracking showing who purchased fuel, when, and where for complete accountability.

Maintenance Impact with Coast Data

Correlate Coast fuel efficiency with maintenance activities to validate repair effectiveness and identify if maintenance improved MPG.

Accounting System Integration

Automatic sync to QuickBooks and Xero with proper GL coding, expense categorization, and automated reconciliation.

Comprehensive Coast Reports

Detailed reporting including Coast spend by vehicle, MPG by driver, cost per mile, efficiency trends, and exception reports.

More Integrations

Related Integrations

Explore other powerful integrations to enhance your CMMS

GPS Integration

Combine Coast data with GPS odometer for precise MPG calculation and location-based fraud detection.

Learn More

Accounting Integration

Sync Coast expenses to QuickBooks, Xero, or NetSuite for automated GL coding and allocation.

Learn More

OEM Telematics

Correlate Coast data with manufacturer diagnostics to identify engine issues impacting fuel efficiency.

Learn More

FAQ

Frequently Asked Questions

Everything you need to know about Coast fuel card integration

Oxmaint connects to Coast's modern API for instant transaction imports. Transaction data includes date, time, location, driver, vehicle, expense category, gallons, price, cost, receipt images, and odometer. Transactions match to fleet vehicles automatically. Historical data from the past 12 months imports during setup. Integration takes 2-3 business days with Coast API credentials.

MPG calculation compares fuel purchases to vehicle mileage. With GPS integration, Oxmaint uses GPS odometer readings for automatic calculation. Without GPS, drivers enter odometer at pump or manually. System calculates: (Current Odometer - Previous Odometer) ÷ Gallons. Historical trending tracks 30-day, 90-day, and 12-month averages. Anomaly alerts trigger when MPG drops 10-15% below normal.

Coast offers native QuickBooks and Xero integration. Fuel transactions automatically sync with proper GL coding and expense categorization. Oxmaint pulls Coast data including accounting codes for unified reporting. This eliminates duplicate entry—expenses sync from Coast to accounting systems and Oxmaint simultaneously. Combined fuel and maintenance costs appear in both accounting software and Oxmaint for complete vehicle cost tracking.

Yes. Coast provides real-time spend controls with customizable limits per vehicle or driver. Set daily, weekly, or monthly limits with instant enforcement. Receive immediate alerts when limits are approached or exceeded. Controls prevent unauthorized purchases before they occur. Oxmaint tracks actual fuel usage against these limits, providing visibility into both spending controls and fuel efficiency for comprehensive fleet management.

Reports include: Fuel Expense Summary (total spend, gallons, price trends), MPG Analysis (efficiency by vehicle/driver), Cost Per Mile Analysis, Driver Fuel Efficiency Reports, Exception Reports (anomalies and unauthorized purchases), Budget Variance Reports, and Transaction Detail Exports. All reports export to Excel, PDF, or CSV.

Coast offers modern digital expense management with real-time spend controls, native QuickBooks and Xero integration, multi-expense platform managing fuel plus maintenance/tolls/parking, instant transaction visibility, automated receipt capture, mobile app for drivers and managers, and customizable spending limits. Coast combines fuel card functionality with comprehensive expense management for complete fleet cost control. Oxmaint also integrates with WEX, Voyager, Comdata, and other providers.

Ready to Automate Fuel Tracking with Coast Integration?

Join thousands of fleets using Coast with Oxmaint to eliminate manual logs, control spending in real-time, sync with accounting systems, and optimize fuel efficiency.