Connect Titan GPS fleet tracking to Oxmaint and automatically sync vehicle locations, odometer readings, engine hours, driver behavior alerts, fuel levels, and maintenance reminders. Schedule preventive maintenance based on actual Titan GPS usage data and receive instant alerts from Titan GPS monitoring systems.
1200k+ Active users Certified Titan GPS Partner
Titan GPS Devices
Driver Safety Score
Maintenance Alerts
GPS Update Rate
Recent Titan GPS Alerts
Maintenance Truck #2451 - PM due 72,450 mi
Fuel Van #1204 - Low fuel level alert
Driver Unit #3567 - Harsh acceleration event
Titan GPS Updates
Automatic Odometer Sync
Manual Mileage Entry
Fuel Monitoring
Live GPS Location
Safety Monitoring
Level Tracking
HOS Tracking
Plus geofencing, route history, idle time alerts, and custom notifications from Titan GPS
Direct API connection to Titan GPS for real-time fleet data synchronization
Connect Oxmaint to your Titan GPS account using Titan GPS API with secure authentication. Sync Titan GPS data every 20 seconds including vehicle locations, odometer readings, engine hours, and fuel levels. Import Titan GPS maintenance reminders and service alerts configured in your dashboard. Pull driver behavior data with harsh braking, speeding, rapid acceleration, and excessive idling events from Titan GPS.
Titan GPS monitors service intervals and fuel levels, triggering maintenance and fuel alerts when thresholds are reached. When Titan GPS generates a reminder (oil change due, low fuel level, tire rotation needed), Oxmaint automatically imports the alert and creates a work order. Monitor fuel consumption patterns from Titan GPS sensors to identify fuel theft or inefficient driving. Sync custom maintenance schedules and fuel thresholds configured in Titan GPS.
Import Titan GPS driver behavior data showing individual driver performance with harsh braking, rapid acceleration, speeding, and excessive idling events. Correlate Titan GPS driver behavior with maintenance costs—aggressive drivers cause increased wear. Schedule PM based on actual Titan GPS odometer and engine hours. Titan GPS's precise mileage tracking triggers services at exact intervals without manual collection.
Driver Safety Score
Titan GPS Odometer Due
Engine Hours Tracked
Titan GPS monitors service intervals and automatically generates maintenance alerts when mileage or time thresholds approach. When Titan GPS detects a vehicle nearing service (oil change at 75,000 miles, inspection in 30 days), Oxmaint imports the alert and creates a work order with service details. Titan GPS fuel monitoring adds low fuel alerts preventing unexpected downtime. No spreadsheet tracking or manual reminders. Titan GPS automated alerts ensure you never miss critical preventive maintenance.
Titan GPS tracks odometer automatically from GPS calculations, syncing current mileage to Oxmaint every 20 seconds. No collecting driver logs, no walking to vehicles, no chasing missing reports. Preventive maintenance triggers automatically when Titan GPS odometer reaches exact thresholds—oil change at 5,000-mile intervals, transmission at 100,000 miles. Engine hour meters from Titan GPS schedule maintenance for vehicles with significant idle time where hour-based intervals are more accurate than mileage.
Titan GPS fuel monitoring tracks fuel levels in real-time, alerting when levels drop below thresholds. Detect fuel theft by correlating Titan GPS fuel data with mileage—sudden fuel drops without corresponding travel indicate theft. Monitor fuel consumption patterns from Titan GPS to identify inefficient driving or vehicle problems. Titan GPS fuel sensors provide accurate fuel level readings helping optimize refueling schedules and reduce fuel costs by 10-15% through theft prevention and efficiency improvements.
Everything you need for Titan GPS fleet maintenance integration
Automatic odometer readings from Titan GPS sync every 20 seconds, eliminating manual entry and triggering PM at exact mileage intervals based on GPS data.
Automatic import of Titan GPS maintenance alerts and service reminders with alert details, due dates, and vehicle information for work order creation.
Real-time fuel level tracking from Titan GPS sensors with low fuel alerts, fuel theft detection, and consumption pattern analysis for cost optimization.
Import Titan GPS driver behavior events including harsh braking, rapid acceleration, speeding, and excessive idling that correlate with increased maintenance costs.
Real-time vehicle locations from Titan GPS with 20-second updates, geofence alerts for shop arrivals, and location verification for service calls.
Titan GPS engine hour meters enable hour-based maintenance intervals for equipment with significant idle time, more accurate than mileage-only tracking.
Sync Titan GPS geofence boundaries and alerts including shop arrival notifications, unauthorized zone warnings, and customer location verification.
Sync Titan GPS ELD hours of service data for compliance tracking, correlating driver fatigue with vehicle incidents and maintenance needs.
Import past trip history, odometer logs, maintenance alerts, fuel data, and driver events from Titan GPS for complete maintenance history and analysis.
Explore other integrations to enhance your CMMS
Combine Titan GPS fuel data with fuel card purchases to validate fuel consumption, detect discrepancies, and identify fuel theft through cross-verification.
Learn MoreBeyond Titan GPS, integrate with Geotab, Samsara, Verizon Connect, and 25+ other GPS telematics providers for complete coverage.
Learn MoreUse Titan GPS mileage and fuel data for precise cost-per-mile tracking and automated expense allocation to QuickBooks or Xero accounting systems.
Learn MoreEverything you need to know about Titan GPS integration
Oxmaint connects to your Titan GPS account via Titan GPS API using secure authentication. Oxmaint automatically syncs Titan GPS data every 20 seconds including vehicle locations, odometer, engine hours, fuel levels, trip logs, driver behavior, and maintenance alerts. Titan GPS maintenance reminders automatically create work orders in Oxmaint with service type, due date, and vehicle details. The integration is bi-directional—when work orders complete in Oxmaint, service records sync back to Titan GPS logs.
Titan GPS monitors vehicle mileage and time intervals to generate maintenance alerts when service is due. When Titan GPS triggers an alert (oil change at 75,000 miles, inspection in 30 days, tire rotation needed), the alert syncs to Oxmaint within minutes. Oxmaint automatically creates a work order with Titan GPS alert details including service type, current odometer, due date, and vehicle information. You configure which Titan GPS alerts trigger automatic work orders and customize service templates.
Titan GPS fuel sensors track real-time fuel levels and transmit data to Oxmaint every 20 seconds. Oxmaint correlates Titan GPS fuel data with odometer readings to calculate expected fuel consumption. Sudden fuel drops without corresponding mileage indicate potential theft. Titan GPS fuel monitoring generates alerts when fuel levels drop unexpectedly (10+ gallons in 5 minutes without refueling). Historical fuel data from Titan GPS identifies patterns of fuel theft by driver, location, or time, helping recover 10-15% of fuel costs through theft prevention.
Yes. Titan GPS tracks driver behavior events including harsh braking, rapid acceleration, speeding, and excessive idling. Oxmaint imports these Titan GPS behavior events and correlates them with maintenance costs. Drivers with frequent Titan GPS behavior alerts cause 30-50% higher maintenance due to premature brake wear, transmission damage, and tire replacement. Harsh braking wears brake pads 2-3x faster. Rapid acceleration stresses transmissions. Use Titan GPS behavior data to identify aggressive drivers for coaching, reducing maintenance costs by 15-25%.
Oxmaint provides comprehensive reports combining Titan GPS data with maintenance metrics: Titan GPS Maintenance Alert Reports showing all triggered alerts by vehicle. Fuel Consumption Reports with Titan GPS fuel data identifying theft and inefficiency. Driver Behavior vs Maintenance Cost Analysis correlating Titan GPS events with repair expenses. Titan GPS Trip History with routes, distances, and idle time. Geofence Activity Logs from Titan GPS. Fleet Utilization Reports with daily mileage, engine hours, and idle time. All reports export to Excel, PDF, or CSV.
Titan GPS integration typically completes in 2-3 business days. Process: Titan GPS Authentication (1 day) providing your account credentials for secure API access. Vehicle Mapping (1 day) matching Titan GPS device IDs to fleet vehicles using VIN or unit numbers. Maintenance Alert Configuration (1 day) selecting which Titan GPS alerts trigger automatic work orders. Historical Data Import (1 day optional) loading past 90 days of odometer, fuel data, alerts, and trip history. Testing (1 day) verifying odometer sync, fuel monitoring, alert import, and behavior data. For fleets actively using Titan GPS, integration is often live within 48 hours.
Join fleets using Titan GPS telematics for automated maintenance scheduling, fuel monitoring, and driver behavior analytics. Connect your Titan GPS account and start preventing missed services with automated alerts.