Connect Verizon Telematics to automatically import vehicle location, diagnostics, and performance data. Track maintenance needs, monitor vehicle health, and correlate telematics with service activities for complete fleet visibility.
1200k+ Active users Automated vehicle tracking
Active Vehicles
Miles (Today)
Service Alerts
Fleet Uptime
Recent Vehicle Updates
Live Truck #2847 - En route, 847 miles
Alert Van #1429 - Service due 200 miles
Connected Fleet-wide - All vehicles tracked
Verizon Telematics
Diagnostic Data Import
Fleet Visibility percentage
Service Real Alerts
Verizon Telematics provides comprehensive vehicle tracking and diagnostics integration for Oxmaint
Real-time location monitoring with route history and geofencing capabilities
Vehicle health monitoring with diagnostic codes and performance metrics
Track mileage, engine hours, and usage patterns for maintenance planning
Automated data sync with continuous updates and reporting
Seamless vehicle data flow from Verizon Telematics to maintenance management
Connect to Verizon Telematics to automatically import vehicle location, mileage, engine hours, diagnostic codes, and performance data. Each update includes timestamp, location coordinates, odometer reading, and vehicle status. Data links automatically to vehicles for complete tracking history.
Automatically schedule maintenance based on mileage and engine hours from Verizon Telematics. Trigger service alerts when vehicles reach maintenance intervals. Track usage patterns to optimize service schedules. Monitor vehicle health to identify potential issues before breakdowns.
Track fleet performance with comprehensive analytics from Verizon Telematics data. Monitor vehicle utilization, identify underused assets, and optimize fleet size. Analyze maintenance costs per vehicle to make data-driven decisions. Generate reports on fleet health and performance trends.
Miles (Today)
Fleet Uptime
Fleet Health
148 vehicles actively monitored
12 service alerts scheduled
Stop manually tracking mileage and service intervals. Verizon Telematics integration automatically triggers maintenance alerts based on real odometer readings and engine hours. Service schedules adjust dynamically to actual usage patterns. Eliminate missed services and prevent breakdowns through automated tracking.
Receive diagnostic codes and vehicle health data directly from Verizon Telematics. Identify potential issues before they cause breakdowns. Track check engine lights and fault codes automatically. Correlate diagnostic data with maintenance history to identify recurring problems. Proactive monitoring reduces unexpected downtime.
Analyze vehicle utilization patterns from Verizon Telematics to optimize fleet size. Identify underused vehicles that can be reallocated or removed. Track maintenance costs per vehicle to inform replacement decisions. Monitor driver behavior and vehicle performance. Use data-driven insights to reduce total cost of ownership.
Everything you need for comprehensive vehicle tracking and fleet management
Track vehicle positions in real-time with location history, route tracking, and geofencing capabilities from Verizon Telematics.
Sync odometer readings automatically from Verizon Telematics for accurate mileage tracking and maintenance scheduling.
Receive diagnostic trouble codes and check engine light alerts directly from Verizon Telematics for proactive maintenance.
Monitor engine hours from Verizon Telematics to schedule maintenance based on actual usage rather than just mileage.
Automatic maintenance alerts triggered by mileage or engine hours from Verizon Telematics data.
Track vehicle usage patterns from Verizon Telematics to optimize fleet size and identify underused assets.
Access complete route history from Verizon Telematics for trip analysis and mileage verification.
Monitor overall vehicle health with data from Verizon Telematics including battery voltage, fuel level, and system status.
Generate detailed reports combining Verizon Telematics data with maintenance records for complete fleet visibility.
Explore other powerful integrations to enhance your CMMS
Combine Verizon Telematics location data with fuel card transactions for complete expense tracking.
Learn MoreSync maintenance costs and vehicle expenses to accounting systems for complete financial tracking.
Learn MoreIntegrate manufacturer-specific diagnostics with Verizon Telematics for comprehensive vehicle data.
Learn MoreEverything you need to know about Verizon Telematics integration
Oxmaint connects to Verizon Telematics for vehicle data imports. Data includes location, odometer readings, engine hours, diagnostic codes, and vehicle status. Information syncs automatically and links to fleet vehicles. Historical data imports during setup for complete tracking history.
Maintenance schedules trigger automatically based on odometer readings and engine hours from Verizon Telematics. System compares current readings against service intervals. Alerts generate when vehicles approach scheduled maintenance. Service due dates adjust dynamically based on actual usage patterns from telematics data.
Verizon Telematics provides diagnostic trouble codes, check engine light status, battery voltage, fuel level, and system alerts. Oxmaint receives this data automatically and creates service alerts for diagnostic codes. Technicians can view diagnostic history alongside maintenance records to identify patterns and recurring issues.
Yes. Oxmaint displays current vehicle locations from Verizon Telematics on fleet maps. Route history shows where vehicles have traveled. Location data helps verify service locations and track vehicle movements. Geofencing alerts can trigger when vehicles enter or exit designated areas.
Reports include: Vehicle Utilization Analysis, Mileage Reports, Engine Hours Tracking, Diagnostic Code History, Maintenance Cost per Vehicle, Fleet Health Summary, and Service Compliance Reports. All reports combine Verizon Telematics data with maintenance records. Reports export to Excel, PDF, or CSV.
Verizon Telematics provides comprehensive vehicle tracking with location monitoring, diagnostic data, and performance metrics. Integration eliminates manual odometer entry and automates maintenance scheduling. Real-time vehicle health monitoring enables proactive maintenance. Complete fleet visibility helps optimize utilization and reduce costs.
Join thousands of fleets using Verizon Telematics with Oxmaint to automate maintenance scheduling, monitor vehicle health, and optimize fleet performance.