IBM offers real estate and facilities capabilities in Maximo Application Suite, and large property portfolios use them for space, leases and capital planning. Many in-house facilities teams need something narrower: requests that reach the right technician, HVAC and life-safety PMs that happen on time, and a record of what was done. This page compares the two paths and shows where Oxmaint AI Pro fits.

Buildings need dependable PMs and fast requests, not an enterprise program
Where Maximo's facilities capabilities shine, and where a smaller in-house team is better served by a lighter tool.
Key takeaways
- IBM lists Maximo Space Management, Capital Planning and Lease Management in Essentials packages starting under US$40K per year each, per its pricing page.
- Those applications suit portfolio-scale real estate work; a building maintenance team may mainly need work orders, PMs and inspections.
- Oxmaint AI Pro covers the maintenance modules without AI: requests via QR labels, work orders, PMs, inspections with photos and the parts module.
- Pro is $19 per seat per month billed annually or $23 monthly, with a 2-seat minimum.
What Maximo brings to facilities
IBM's pricing page lists Space Management, Capital Planning and Lease Management as Essentials options, each starting under US$40K per year, alongside the maintenance package. Space Management lists up to 2,000 reserve users and Lease Management up to 500 leases. These are portfolio tools: they help real estate teams plan space, manage leases and prioritise capital across many buildings.
What an in-house team usually needs
A hospital engineering team, a school district crew or a corporate campus team spends most of its day on requests and planned work. Air handlers need filter changes and belt checks. Fire doors, emergency lights and backflow preventers need inspections on a schedule. Occupants need a simple way to report a problem. The team needs a record of what was done, with photos, for when someone asks.

How Oxmaint AI Pro covers the daily work
Requests can be raised by scanning a QR label on an asset or a room. Supervisors turn them into work orders with a priority and an assignee. PMs run on a calendar or on running-hours readings for equipment such as chillers and pumps. Inspections capture pass or fail results with photos. The parts module keeps the shop's filters and belts in order. Technicians do all of it on mobile web. Our facility management overview shows how teams set this up.

Price for a building team
Oxmaint AI Pro is $19 per seat per month billed annually ($228 per seat per year), or $23 per seat billed monthly, with a 2-seat minimum. You can start monthly and move to annual once the building is set up.
A six-person building team on annual billing comes to $1,368 a year at Pro list. Our team loads your existing asset list as a services step; there is no Maximo-specific importer. Admins can also add assets in bulk from a CSV or Excel file.
Inspections that stand up to questions
Facilities teams are often asked to show that a check happened: a fire door, an emergency light, a backflow test. In Oxmaint AI, an inspection records who did it, when, the pass or fail result for each item and any photos taken. That record is easy to pull up when a manager or an inspector asks. We describe this as keeping your inspections aligned with your own policies; Oxmaint AI does not certify anything, and the standard you follow is still yours to set.
When Maximo is the better choice
- You manage a large portfolio and need space, lease and capital planning in one suite.
- Your organisation already runs Maximo for maintenance across many buildings.
- You need IBM's industry solutions or regulated validation options.
If you keep Maximo for portfolio work, Oxmaint AI can still be the crew tool for building maintenance, with records moved as files. See asset management for facility equipment for what to track first.
Frequently asked questions
Does IBM Maximo cover facilities?
Yes. IBM offers Space Management, Capital Planning and Lease Management in Maximo Application Suite, with Essentials options starting under US$40K per year each.
Can occupants report problems in Oxmaint AI?
Yes. Requests can be raised against an asset or room by scanning its QR label.
Can Oxmaint AI schedule HVAC PMs by runtime?
Yes. PMs can use running-hours readings as their interval, as well as calendar intervals.
What does Pro cost?
$19 per seat per month billed annually ($228 per seat per year) or $23 monthly, with a 2-seat minimum.
Editorial review
Maximo facilities packaging was read from IBM's pricing page on November 15, 2026. Building examples are illustrative. Oxmaint AI features are described as shipped on Pro and above.
Give the building team a lighter tool
Create an Oxmaint AI workspace and set up your first building this week.
Related reading on Oxmaint
Sources
IBM Maximo is a trademark of its owner; Oxmaint AI is not affiliated with or endorsed by IBM Maximo. Comparisons are based on publicly available information as of November 2026. Oxmaint AI plan details are as of November 15, 2026 and may change. Examples on this page are illustrative, not customer results.