The efficiency of granulators, as essential size reduction equipment in plastic recycling, is crucial in maintaining high-quality waste reduction. Regular maintenance, backed by an effective checklist, is instrumental in keeping the granulator blades sharp, regulating energy consumption, and managing regrind quality control. This checklist also delves into detailed screenings of crucial granulator functionalities.
Equipment Identification: ▢ID/Number: ________ ▢Hours/Mileage: ________
Operator: _______ ▢ Date: _______
Document observed issues here
Signature: _______ Date: ________
Take a personalized tour with our product expert to see how OXmaint can help you streamline your maintenance operations and minimize downtime.
Book a Tour