A large public university with over 200 facilities assets discovered that nearly a third of its internal repair costs were going toward equipment still under OEM warranty — work that should have cost nothing. Without a centralized system to tag, track, and surface warranty status at the point of work order creation, technicians were unknowingly billing in-house labor and parts against covered assets. Over five years, the facilities team — working with Oxmaint CMMS — reversed that pattern entirely, recovering $3.2 million in warranty-eligible repairs, reducing disputed vendor invoices by 74%, and cutting mean time to warranty claim submission from 19 days to under 48 hours. Sign Up Free to see how Oxmaint warranty tagging works for university asset portfolios. The shift required no new headcount — only the structured asset data and automated workflow triggers that Oxmaint placed directly in front of technicians at job creation time. Book a Demo to walk through the university warranty recovery configuration live.
Start Recovering Warranty Costs Today
Your Campus Is Paying for Repairs That Should Be Free
Most university facilities teams have no way to know if an asset is under OEM warranty at the moment a work order is created. Oxmaint changes that — surfacing warranty status automatically before a single dollar of in-house labor is logged. Set up takes days, not months, and the first recovered claim typically covers the cost of onboarding.
Warranty alerts at work order creation
OEM claim documentation in one click
Expiry tracking with automated alerts
The Challenge
Invisible Warranty Spend
No system linked work orders to asset warranty records. Technicians had no way to know if a repair was OEM-covered before starting work.
Paper-Based Warranty Files
Warranty documents lived in filing cabinets across 12 departments. Retrieval averaged 3–4 days — too slow to meet most vendor claim windows.
Expired Claims Left Unclaimed
Without automated expiry tracking, the facilities team routinely discovered warranty coverage after the claim window had already closed.
No Recovery Audit Trail
Reimbursement disputes with vendors required documentation the team could not consistently produce — costing an estimated $410K annually in unrecovered claims.
The Solution
01
Warranty Tag at Asset Creation
Every asset in Oxmaint was configured with OEM warranty start date, expiry date, covered components, and vendor contact — visible directly on the asset profile and surfaced automatically when a work order was created against that asset.
02
Warranty Alert on Work Order Creation
Oxmaint triggers a real-time warranty status alert when a technician creates a work order for a covered asset — halting in-house billing and routing the request through the OEM claim workflow instead.
03
Photo and Labor Documentation for Claims
Technicians captured timestamped photos and labor notes directly in Oxmaint mobile. This documentation was packaged automatically into warranty claim submissions — reducing vendor disputes by 74%.
04
Expiry Alerts and Renewal Tracking
Automated 90-day and 30-day expiry notifications ensured the facilities team never missed a claim window. Extended warranty renewals were tracked in the same asset record, eliminating the gap between original and extended coverage.
Results After 5 Years
$3.2M
Total warranty recovery across 5 years — repairs previously billed in-house, now funded by OEM warranty claims.
74%
Reduction in disputed vendor invoices — supported by Oxmaint timestamped work order documentation and photo evidence.
48 hrs
Mean time to warranty claim submission — down from 19 days when files were paper-based and manually retrieved.
Zero
New headcount required — the entire recovery program was built on existing staff using Oxmaint mobile and automated alerts.
Key Business Impact
| Area |
Before Oxmaint |
After Oxmaint |
| Warranty visibility at work order creation |
None — technicians checked paper files manually |
Automatic alert on every covered asset work order |
| Claim submission time |
19 days average |
Under 48 hours |
| Vendor dispute resolution |
74% dispute rate — insufficient documentation |
Disputes reduced 74% with timestamped photo records |
| Missed claim windows |
Frequent — no expiry tracking system |
Zero missed windows — 90/30-day automated alerts |
| Annual warranty recovery |
~$120K — manual, inconsistent |
$640K average annually over 5 years |
Built for University Facilities Teams
Turn Your Asset Register Into a Warranty Recovery Engine
Oxmaint CMMS is used by facilities teams at colleges and universities to track OEM coverage across thousands of assets — from HVAC units and lab equipment to elevators and generators. Every work order created against a covered asset triggers an automatic warranty check. Every repair is documented with timestamped photos and labor records ready for vendor submission. The result is a systematic recovery program that runs in the background of your normal maintenance operations — no extra staff, no extra process.
4,800+ assets tracked in a single account
Mobile-first technician experience
Vendor claim documentation auto-packaged
Frequently Asked Questions
How does Oxmaint surface warranty information during work order creation?
When a technician creates a work order against an asset, Oxmaint checks the asset's warranty record and displays an alert if the asset is under active OEM coverage — before any labor or parts are logged.
Can we import existing warranty records from spreadsheets or paper files?
Yes. Oxmaint supports bulk asset import with warranty fields. The university migrated 5 years of paper warranty records in a single structured import during onboarding.
Does Oxmaint support both original and extended OEM warranties?
Both are tracked on the same asset record with separate date ranges. Alerts are triggered across the full coverage period, including extended warranty renewals.
What documentation does Oxmaint generate for vendor warranty claims?
Oxmaint packages timestamped work orders, technician labor notes, and mobile-captured photos into a structured claim record — the same documentation that cut this university's vendor disputes by 74%.
How many assets can be tracked under warranty in Oxmaint?
There is no asset limit. The university tracked warranty coverage across 4,800+ assets spanning HVAC, electrical, laboratory equipment, and building systems — all within a single Oxmaint account.
Join Facilities Teams Already Recovering Warranty Costs
Stop Leaving OEM Money on the Table — Start Today
The university in this case study recovered $3.2 million over five years — not through a capital project or a new hire, but through a CMMS that made warranty status visible at the moment it mattered most and configure warranty tracking for your highest-value assets today. Already managing a large portfolio to see a guided walkthrough of the university warranty recovery workflow, including bulk import, expiry alerts, and vendor claim packaging.
No credit card required to sign up
Onboarding support included
Works alongside your existing BAS or ERP