A coal feeder does one job: deliver the right amount of coal to the mill, steadily. When it does not, the boiler feels it quickly, through unstable firing, load swings and trips. Most feeder problems are not sudden. A belt drifts off centre, a skirt seal wears, a load cell drifts, coal starts to bridge in the inlet, and each one is visible on a walk-down before it becomes a trip. This 33-point coal feeder maintenance checklist follows the coal path from inlet to discharge so nothing gets missed. OxMaint AI maintenance management software turns each stop into a scheduled inspection with recorded findings and follow-up work orders.
Coal Feeder Maintenance Checklist for Thermal Power Plants.
Missed feeder checks show up as unstable coal flow, drifting feed rate and avoidable trips. OxMaint AI connects feeder inspections, issues found, work orders and recurring PM in one platform, so every shift check is recorded and every defect gets an owner and a due date.
the checklist, on a phone
belt, bearing, sensor, flow
assigned with a due date
next round raised automatically
The Coal Feeder Walk-Down Checklist
Follow the route from the hopper to the discharge and tick each item as you go. Tags show how often each check is typically done. Critical marks safety items, so never skip them. Intervals are typical; your manufacturer's manual and plant procedures decide the final schedule. Book a demo to see each stop become a scheduled round.
- Weekly
- Every shift
- Weekly
- Every shift
- Monthly
- Weekly
- Weekly
- Weekly
- Weekly
- Monthly
- Every shift
- Weekly
- Weekly
- Monthly
- Monthly
- Every shift
- Weekly
- Outage
- Monthly
- Monthly
- Weekly
- CriticalMonthly
- Every shift
- Weekly
- Weekly
- Monthly
- CriticalOutage
- CriticalEvery shift
- CriticalMonthly
- CriticalEvery shift
- CriticalMonthly
- CriticalMonthly
- Every shift
Six Feeders, Four Shifts, One Paper Checklist. Who Checked Feeder 3B on Tuesday?
OxMaint AI assigns each round by feeder and shift, collects readings and photos on a phone, flags missed checks and keeps the history per asset, so the answer is always on record.
Coal Feeder Troubleshooting: Symptom to First Check
When something goes wrong, start with these checks before opening anything up, and always isolate and lock out first. Start free and log faults against each feeder.
How OxMaint AI Supports Coal Feeder Reliability
Frequently Asked Questions
Keep Coal Flowing and Every Check on Record.
Schedule the rounds, record the findings and close every defect. Start with one feeder and see how much clearer the picture gets.