A 25-technician facilities team in Phoenix budgeted $11,000 for their first-year CMMS deployment. By month four, they were paying $1,375 per month for UpKeep Premium — and discovering that preventive maintenance optimization, custom checklists, inventory management, and time tracking sat behind the Premium tier they were on. To unlock workflow automation and full offline support, they needed Professional. To get multi-site management, they needed Enterprise. The same team running OxMaint at $8/user/month would have paid $200 per month, with AI predictive maintenance, multi-site rollup, and full mobile offline mode included from day one. UpKeep is a credible CMMS — but the per-user pricing and aggressive feature tiering punish growing teams. If you're evaluating the two, sign up to try OxMaint free or book a demo.
OxMaint vs UpKeep — 2026 Comparison
$8/User/Month vs $55/User/Month: The Pricing Gap That Defines This Comparison for Most Teams
$8
OxMaint per-user/month
AI predictive maintenance, multi-site rollup, full mobile offline included at all paid tiers
$55
UpKeep Premium per-user/month
PMs, inventory, time tracking start here; offline mode requires Professional tier
7-day
UpKeep trial only
No permanent free tier; OxMaint free tier is genuinely functional with no time limit
85%
Cost reduction switching
Typical savings for 20+ tech teams moving from UpKeep Premium to OxMaint
The 30-Second Verdict — Which CMMS Wins for Your Team
Both platforms solve the core CMMS problem. The choice comes down to team size, feature scope, and total cost trajectory over 3-5 years. Here's the honest breakdown for the most common scenarios.
Choose OxMaint if
+Your team is 10+ technicians and growing
+You need multi-site or portfolio management
+AI predictive maintenance matters at SMB pricing
+You want a truly free tier to evaluate first
+Industrial / heavy manufacturing environment
+Deep asset hierarchies (5+ levels)
Choose UpKeep if
+Your team is under 5 technicians
+Single-site facilities management focus
+You're already using Nova AI workflows
+Light maintenance, low complexity assets
+Hospitality or property management vertical
+Budget unconstrained for per-user growth
Pricing Comparison — The Numbers Most Teams Don't Calculate Until It's Too Late
UpKeep's per-user model creates a compounding cost curve as your team scales. OxMaint's flat-rate paid tier breaks that math. Here's what monthly spend looks like across team sizes for the equivalent feature set.
Monthly Cost Comparison: OxMaint vs UpKeep Premium ($/month)
OxMaint ($8/user/mo, $499/mo flat at scale)
UpKeep Premium ($55/user/month)
A 25-tech team saves $14,100 in year one with OxMaint. A 100-tech team saves $60,000+ annually. Numbers exclude UpKeep implementation fees ($500-$5,000+) which OxMaint does not charge.
Feature Comparison — Where Each Platform Actually Stands
| Feature | OxMaint | UpKeep |
| Free tier (no time limit) |
Yes — full work orders |
No — 7-day trial only |
| Entry tier monthly cost |
$8/user — all features |
$20/user — limited |
| Preventive maintenance |
All paid tiers |
Premium tier only ($55) |
| Inventory management |
All paid tiers |
Premium tier only ($55) |
| AI predictive maintenance |
All paid tiers |
Nova AI from Essential |
| Workflow automation |
Included |
Enterprise tier only |
| Full offline mobile mode |
Standard at all tiers |
Professional tier only |
| Multi-site management |
All paid tiers |
Enterprise tier only |
| Custom dashboards |
Included |
Enterprise (15+ chart types) |
| REST API access |
All paid tiers |
Enterprise tier only |
| Reporting history |
Unlimited |
30-day on Premium |
| Implementation fee |
$0 — self-serve |
$500-$5,000+ |
| Asset hierarchy depth |
Unlimited levels |
Standard 3-level |
See the Difference Yourself
OxMaint Free Tier — Try the Full Workflow Before You Commit
No credit card. No 7-day clock. No "starter" tier that's actually a demo. Just a real CMMS workspace your team can evaluate against the work you do every day.
Side-by-Side Capability Scorecard
Scoring across the dimensions that determine real-world fit: pricing transparency, mobile experience, AI capability, asset depth, and total cost of ownership over a 3-year horizon. Both platforms score well on core mobile usability — the gaps emerge on the dimensions that matter at scale.
AI & Predictive Capability
3-Year Total Cost of Ownership
Where Each Platform Genuinely Wins
Where OxMaint Wins
Industrial & Multi-Site Operations. OxMaint's portfolio > property > system > asset > component hierarchy was built for plant managers running multi-facility operations. UpKeep flattens out at single-site facilities work and only unlocks multi-site at Enterprise pricing.
Pricing That Doesn't Punish Growth. A 50-technician team pays $400/month on OxMaint vs $2,750/month on UpKeep Premium. Over 3 years, that's $84,600 saved — enough to fund 1.5 additional technicians.
AI Without the Premium Gate. OxMaint includes AI predictive maintenance, fault pattern detection, and AI-generated PMs at all paid tiers. UpKeep Nova AI is included from Essential, but the deeper AI capabilities ride along the per-tier escalation.
Where UpKeep Wins
Mature Brand Recognition. UpKeep has been in market since 2014 and has stronger brand recognition in the SMB facilities segment. If your procurement team requires "established vendor" credentials, that matters.
Single-Site SMB Simplicity. For a 3-5 person team running a single facility with light maintenance needs, UpKeep's Lite tier at $20/user/mo with Nova AI access is a credible choice — though OxMaint's free tier covers the same use case.
Hospitality & Property Management Templates. UpKeep has shipped industry-specific templates for hotels and property management for years. OxMaint matches in coverage but UpKeep has more vertical-specific case studies in those segments.
Frequently Asked Questions
Is the OxMaint free tier really free, or is it a 14-day trial?+
OxMaint's free tier is genuinely free with no time limit. It includes full mobile work order management, basic preventive maintenance scheduling, and asset records — sufficient for 2-5 person teams evaluating digital maintenance for the first time. UpKeep offers a 7-day free trial only — no permanent free tier exists.
Sign up free to evaluate OxMaint against your actual workflows before any commitment.
Can we migrate our UpKeep data to OxMaint?+
Yes — OxMaint provides free migration support for teams switching from UpKeep, including assets, work order history, PM schedules, parts inventory, and user accounts. The typical migration completes in 1-2 weeks for a 25-tech team, with parallel running for 5-7 days to validate data integrity before cutover.
How does OxMaint AI compare to UpKeep Nova AI?+
UpKeep Nova AI runs as a background agent monitoring CMMS data and flagging issues — it's a credible feature available from the Essential tier. OxMaint AI covers the same workflow plus predictive maintenance scheduling, AI-generated PM templates from asset manuals, fault pattern detection across work order history, and condition-based work order auto-generation. Both platforms include AI without separate add-on pricing.
Why is UpKeep Premium so much more expensive than OxMaint?+
UpKeep operates a per-user subscription model with aggressive feature tiering — preventive maintenance, inventory, time tracking, and offline mobile sit behind Premium ($55/user/month) or higher. OxMaint operates a flat-rate paid tier where all paid customers get the same feature set. The pricing gap reflects different business models, not feature differences.
Does UpKeep offer multi-site management?+
Multi-site management on UpKeep requires Enterprise tier — pricing is custom and quote-only. OxMaint includes multi-site management at all paid tiers including the $8/user/month entry. For organizations managing 2+ facilities, this is typically the deciding factor in the comparison.
OxMaint vs UpKeep — The Bottom Line
For 90% of Teams, the OxMaint Math Just Works.
Same core CMMS capability. Same mobile-first execution. Same AI features. At 1/7th the cost per user, with multi-site rollup, full offline mobile, and AI predictive maintenance included from the entry tier. Try the workflow free, on your own assets, before you commit.
$8/u/mo
vs UpKeep $55/user/month
$0
Implementation fee vs $500-$5,000+
All tiers
Multi-site & offline mobile included
2 min
Sign up to live workspace