School grounds are the first thing students, parents, and visitors see — and the last thing that gets a structured maintenance programme. Lawn mowing and litter collection happen reactively. Tree inspections, irrigation audits, and drainage checks rarely happen at all until a branch falls or a car park floods. A structured grounds maintenance programme aligned to the academic calendar prevents the avoidable: a drainage failure that closes a car park on parents' evening, a tree limb over a play area that was never assessed, or an irrigation system left running through a wet autumn because no one scheduled the shutdown. This checklist covers every grounds maintenance task for a school campus, organised by frequency and seasonal window, and built for deployment in OxMaint to auto-schedule every task before it is due.
School Grounds and Landscaping Maintenance Checklist
Lawn care, tree and shrub maintenance, irrigation, parking lots, sidewalks, fencing, and drainage — complete grounds PM schedule aligned to the academic calendar with seasonal task windows.
Academic Calendar Alignment
Tasks are aligned to school year timing: Weekly Monthly Each Term Annual After Storm. Items marked Safety create a risk to students or staff and must be actioned before the next school day. All deficiencies logged in OxMaint with location and photo before the inspector leaves site.
1. Lawn Care
2. Trees and Shrubs
Tree maintenance is the highest-consequence grounds management task. A branch failure over a student play area or car park creates injury risk and legal liability. Trees must be inspected by a competent person — not just visually assessed during a general grounds walk — at least annually, with immediate response to any newly developing structural concern.
Tree Risk Work Orders Auto-Raised from OxMaint Inspection
Arborist recommendations entered in OxMaint as priority work orders the same day the report is received — Category 1 risks flagged before the next school day, Category 2 scheduled into the maintenance programme automatically. No recommendation is ever filed and forgotten.
3. Irrigation System
4. Parking Lots and Access Roads
5. Paths, Sidewalks, and Steps
Grounds PM Auto-Scheduled in OxMaint — Every Season, Every Zone
Weekly path walks, monthly tree inspections, autumn irrigation winterisation, and annual arborist surveys all auto-scheduled in OxMaint before they fall due — assigned to the correct groundskeeper, contractor, or specialist before the task window opens.
6. Fencing and Gates
7. Drainage and Surface Water Management
8. Seasonal Grounds Tasks
Frequently Asked Questions
School Grounds PM — OxMaint CMMS
Every Season. Every Zone. Every Task — Scheduled Before It's Due.
Auto
seasonal task scheduling
Safety
items flagged same day
All
zones in one dashboard
✓Weekly, monthly, seasonal, and post-storm tasks auto-scheduled per zone
✓Arborist recommendations logged as priority work orders — never filed and forgotten
✓Trip hazard and safety deficiencies tracked to closure with photo evidence
✓Complete grounds maintenance history — exportable for insurance or legal review