A maintenance assistant is only worth asking if you can check its answer. Oxmaint AI answers questions about your plant, such as what is overdue, which machine keeps failing or who is carrying the most work, by reading your own records in the portal, and every record it used comes back as a link you can open. It answers from what is there, says what it left out, and never needs a separate data export. Sign up to see Oxmaint AI on a sample plant.
AI Maintenance Assistant That Cites Your Records
Questions answered from your records, with a link to every record used. Sign up and explore.
Questions Teams Ask It
The late work orders and PMs, with links to each.
Parts below minimum or out, and the jobs that need them.
Open work by technician.
The figure and the schedules behind it.
How an Answer Is Built
In your own words, such as "the forklift with the soft brakes"; records are found by meaning, not only by matching words.
What the question names is written out in full first, then open work, PMs, requests and inspections, then the rest as room allows.
The model is told to answer only from that text, and each list says how many records it left out.
Every record carries a reference, and the references come back with the answer as links into the portal.
Ask the Sample Plant a Question
See how answers link back to the work orders, assets and parts they used. Sign up to the micro app and explore.
Illustrative Example
Why is the screw compressor service not done yet?
WO-2735 Screw compressor 2,000 h service, On Hold
The hold reason recorded on the job
A link to open WO-2735
Illustrative example built on a real sample-plant work order; not a captured answer.
Limits, Stated Plainly
| Limit | What it means |
|---|---|
| Prompt size | Up to 12,000 characters of your records per question, chosen for that question |
| Rate | 30 questions in ten minutes per person |
| Who can ask | People signed in to your organisation's own portal |
| Plan | The Oxmaint AI chat is part of the Agentic plan; it is checked before any record is read |
| Where it runs | An on-premise model server, or the iFactory gateway when that is set up |
The chat still answers the common questions, such as what is overdue, with answers worked out in the browser from the same records, rather than by a language model.
Ask the assistant to find, not to decide. It is good at pulling together the overdue jobs or the history of one machine in seconds; the decision about what to do next is still yours. Open the linked records before acting on an answer, as you would check a colleague's note. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Answers You Can Check, From Your Own Records
Oxmaint AI reads your portal and links to every record it used. Sign up and explore the micro app.







