How to Set Up a Plant CMMS from Sample Data

By William Jerry on November 28, 2026

how-to-set-up-a-plant-cmms-from-sample-data

Setting up a plant CMMS usually stalls on an empty screen. Oxmaint starts the other way round: the portal opens on a ready-made sample metal fabrication and assembly plant, with about two months of work orders, so you learn the screens on real-looking records before you type a single one of your own. Then you invite your team, add or import your machines, parts and jobs, and remove the sample when you are ready. Sign up to start from the sample plant today.

How-To · Setup · Sample Data · Import

How to Set Up a Plant CMMS from Sample Data

Learn on a sample plant, bring in your own records, then switch the sample off. Sign up and start.

What the Sample Plant Gives You

64
Assets
75
Jobs open
51
PM schedules running
70
Part lines
$58,180
Stock at cost

Sample plant records from the Oxmaint portal's Getting Started screen, captured 26 Nov 2026. These records are sample, not yours, and never count toward usage or a plan limit.

A Setup Path in Five Steps

Step 1
Explore the sample

Open a work order, a PM schedule, an asset and the Kanban board to see how they connect.

Step 2
Invite your team

Add the people who will raise, do and approve work, so jobs can be assigned.

Step 3
Add your machines

Start with the ones that stop the line. Add by hand, or import a spreadsheet.

Step 4
Load parts and PMs

Bring in the parts you stock and the PM schedules you run.

Step 5
Remove the sample

Switch off the sample data so the screens show only your records.

Manager showing technicians a tablet in the workshop

Start From the Sample Plant

Learn the screens on real-looking records, then add your own. Sign up to the micro app and begin.

Pick the Path That Fits Where You Are

You are starting fromThe welcome card suggests
Excel or Google SheetsImport your spreadsheet yourself, or email it and it is loaded for you
Another maintenance productSend the export: assets, parts and stock, PM schedules and work order history
Paper job cardsAdd the machines you look after most and print a QR label for each
Nothing yetAdd your machines, invite your team, or send your current data

Whichever path you take, anything you add or change is saved for everyone signed in to your portal. Sign up to see your welcome card.

Removing the Sample Data

What disappears

The sample machines

Its work orders and schedules

Its parts and people

From every screen, for your company only

What stays

Everything your company entered

Exactly as it is

The option to show the sample again later

Technician standing at a machine with a tablet to add it
Send us your data

If you would rather not import yourself, the portal offers to load your asset list, parts, PM schedules and job history for you, in place of the starting records.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Do not wait for a perfect asset list. Load the machines that stop the line, put their PM schedules in, and run real work orders on them for a few weeks. The gaps you find while working are the ones worth fixing; the rest of the register can follow. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Why does the portal start with sample data?
So every screen has records from the first sign-in and you can learn how work orders, PMs, assets and parts connect before entering your own. Sign up to explore it.
Do sample records count toward my plan?
No. Sample records never count toward usage or an asset limit. Only the records your company adds do. Sign up and start.
Can I import my existing spreadsheet?
Yes. Import sites, lines, assets, parts and work orders from Excel or a CSV, or send the file and it is loaded for you. Sign up to import.
What happens when I remove the sample data?
The sample machines, jobs, schedules, parts and people disappear from every screen for your company. Your own records stay, and the sample can be shown again. Sign up to see the option.
Who can see what I add?
Everyone signed in to your company's portal. What you add or change is saved for the whole team, not only on your device. Sign up and invite your team.
Where should I start with my own assets?
With the machines that stop the line when they fail. Add them, their PM schedules and the parts they use first, then widen. Sign In to Access Micro App

Set Up Your Plant CMMS the Easy Way

Start on a sample plant, bring in your records, switch the sample off. Sign up and explore the micro app.


Share This Story, Choose Your Platform!