Asset Register Software for Manufacturing Plants

By William Jerry on November 28, 2026

asset-register-software-for-manufacturing-plants

Every maintenance question eventually becomes a question about one machine: how old is it, how critical is it, is it still under warranty, and what has been done to it? Oxmaint's Assets Master keeps each machine as one record with its type, serial, maker, model, location, criticality, warranty and running hours, and puts its work orders, PM schedules, inspections, certificates and QR label one click away. Sign up to try the micro app and open a sample register of 64 machines.

Assets Master · Asset Detail · Assets QR

Asset Register Software for Manufacturing Plants

One record per machine, with everything that has happened to it beside it. Sign up and open a sample plant's register.

One Machine, One Page

This is a real asset page from the sample plant. Everything below is on one screen, gathered from the jobs, checks, inspections and costs recorded against the crane. Sign up to open Overhead Crane 01.

Overhead Crane 01 · CMH-OC-001Operational · Medium criticality
Maker and model
Kessler Crane Systems M549
In service since
23 Dec 2022
Running hours
22,767 h
Warranty
Until 27 Jul 2026
Health score
86%
Work orders raised
2, no breakdowns
Labor and downtime
21 h labor, 6 h downtime
Inspections
11, 1 failed, mean 79%

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. The page also listed six passed pre-start checks from 20 to 26 Nov and $2,118 of maintenance spend across 2 closed jobs.

What the Asset Page Gathers

Basic information
Who made it and where it is

Type, manufacturer, model, serial, site, location, external ID and description.

Condition
How it is doing

Health score, running hours, warranty date and the latest pre-start checks.

Performance
What it has cost you in time

Work orders raised, breakdowns, labor booked and downtime logged.

Maintenance
What is next

Last maintained, next due, open work orders and PM schedules.

Inspections
How it scores

Inspections done, failed items and the mean score.

Financial
What it has cost you in money

Maintenance spend, the jobs it came from and the mean cost per job.

Engineer fixing an asset tag to an electric motor in a factory

The Sample Register in Numbers

64
Assets
56
Operational
5
Under maintenance
3
Down
24
High criticality
Criticality across the 64 assets
High: failure stops the line24
Medium12
Low28
Warranty cover
Out of warranty11
Expires within 90 days7
Covered beyond 90 days46

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. Your numbers will differ.

Open the Sample Register

Filter by criticality, open a machine and follow its history. Sign up to the micro app and explore 64 sample assets.

Plants, Areas and Lines Are Places, Not Assets

The hierarchy keeps places and machines apart. A plant, an area and a line are places that hold machines; they are not machines themselves, so they are not mixed into the asset counts. A machine can also be part of another, such as a gearbox on a conveyor, and the asset page shows the full path.

Area (Columbus Plant, sample)AssetsArea (continued)Assets
CNC Machining12Assembly & Test6
Fabrication & Welding9Warehouse & Mobile Equipment5
Packaging & Shipping7Paint & Finishing4
Utilities: air, chilled water and dust7Receiving & Raw Material3
Stamping6Electrical & Controls3
Maintenance Shop & Stores2Distribution Center (2nd site)0

Sample plant records, captured 26 Nov 2026: 12 locations over 2 sites.

A Register That Does Not Invent Things

What many registers do

Fill a blank warranty with a year from today

Mark a new machine as serviced today

Delete sub-assets with their parent

What Oxmaint does

A date left blank stays blank

An in-service date cannot be in the future, and a warranty cannot end before it

Removing a machine offers to move its sub-assets up a level, with their history

Overhead view of machine rows and areas on a manufacturing floor

Actions From the Asset

Raise work orderA job already linked to this machineJob
Log readingA running-hours reading for meter-based PMsMeter
Pre-start checkFor machines with a daily check, such as cranes and forkliftsCheck
QR labelPrint the machine's tag so anyone can report a problemLabel
Expert Review
Reviewed by the Oxmaint AI maintenance team

Get criticality right before anything else. Mark as high only the machines whose failure stops a line, and be honest about it: on the sample plant that is 24 of 64. Then log running hours on those first, because meter-based PMs and MTBF both depend on them, and a register without readings cannot tell you which machine is working hardest. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What does an asset record hold in Oxmaint?
Type, manufacturer, model, serial, site and location, criticality, warranty, running hours, an external ID and a description, with its work orders, PM schedules, inspections, certificates and QR label beside it. Sign up to open an asset.
Can I build a hierarchy of plants, areas and lines?
Yes. Plants, areas and lines are kept as places in Plants & Lines, and machines sit inside them. A machine can also be part of another machine, and its page shows the full path. Sign up to see the hierarchy.
How is the health score set?
It is shown as a percentage on the register and the asset page. When you add or edit a machine you rate it from 1 to 5, stored as 20 to 100 percent. It is your team's rating, not a prediction. Sign up and rate a machine.
Can I export the register?
Yes. Assets Master has an Export button, and the asset list can be filtered by criticality and type first. Sign up to export the sample register.
What happens if I remove a machine that has sub-assets?
The portal asks what to do with them and offers to move them up a level, where they stay in the register with their history. Sign up to try it on the sample plant.
Can I try this without setting anything up?
Yes. The portal starts with 64 sample machines. When you are ready, add your own under Assets, or send your asset list and it is loaded in place of the starting records. Sign In to Access Micro App

Know Every Machine You Look After

One register, one page per machine, and its whole history beside it. Sign up and open the sample register.


Share This Story, Choose Your Platform!