Inspection Management Software for Plants

By William Jerry on November 28, 2026

inspection-management-software-for-plants

An inspection on paper proves that someone walked past the machine. An inspection in the maintenance system proves what they found, and what was done about it. Oxmaint records planned inspections against the machines they cover, with a frequency and a list of items to walk. It starts you with templates for mechanical power presses, CNC start-of-shift checks and overhead crane frequent inspections, and a failed item can raise a corrective work order. Sign up to try the micro app with 40 sample inspections.

Inspection Reports · Daily Checks · Checklists

Inspection Management Software for Plants

Planned inspections against each machine, with their items, scores, overdue list and the jobs they raise. Sign up and open a sample inspection register.

The Sample Plant's Inspection Register

portal.oxmaint.ai · Inspection Reports · All Sites
40
Inspections
22
Completed
16
Passed
3
Failed
18
Overdue
How the register reads
Completion rate: 22 of 4055%
Pass rate: 16 of 22 completed73%
Average score across completed81.5

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. The portal also flagged 19 findings with no work order yet. Your numbers will differ.

Starting Templates, Item by Item

Each template names the machines it applies to, how often it is due and the items to walk. The standard in brackets is the basis the template follows; it is not a promise that using it makes you compliant. Sign up to open the templates.

Mechanical power press inspection · weekly (after OSHA 1910.217(e))
Clutch and brake operate correctlyPass
Stopping time within the guard distancePass
Light curtain muting and blanking correctFail
Two-hand controls anti-tie-down worksPass
Point-of-operation guards fitted
Air and hydraulic pressure normal
No cracked or loose dies or bolsters
Emergency stop tested

Items read from the portal's template. The pass and fail marks are an illustrative example, not real data.

Inspector testing a light curtain on a press with a test rod
TemplateDueApplies toItems include
CNC cell start-of-shift checkEvery shiftCNC machines and surface grindersWay lube above minimum, coolant concentration, chip conveyor, air pressure, door interlock stops spindle, no alarms, spindle warm-up
Overhead crane frequent inspectionMonthly (after OSHA 1910.179(j))Overhead cranesUpper limit switch, hook latch, wire rope, pendant and e-stop, brakes hold rated load, capacity marked both sides
Forklift pre-shift inspectionEvery shiftForkliftsTires, forks and chains, hydraulic leaks, horn and lights, brakes, seat belt, LPG coupling, hour meter reading

Walk a Sample Inspection

Open an overdue power press inspection, mark the items and see what a failed item does. Sign up to the micro app and try it.

From a Failed Item to a Job

Item fails
Marked on the inspection
Corrective job
Raised against the same machine
Finding closed
When the job is done
History
Kept on the asset page

Two real rows from the sample register show both ends: INS-1400 on Mechanical Power Press 02 was in progress and overdue, and INS-1401, a CNC cell start-of-shift check on CNC Lathe 03, was completed with a fail. Findings that have no work order yet are counted, so they cannot sit unnoticed.

Inspection, Daily Check or Checklist?

Daily checks and checklists

Daily Checks: a short pre-start check on forklifts, aerial lifts and cranes, done before use

Checklists: a list you build or generate and walk on a phone, for any routine

Sample plant: 5 active checklists, 6 of 12 runs due today walked

Inspection Reports

A planned inspection with a frequency and a list of items

Scored, with a completion rate, pass rate and average score

Overdue inspections and findings without a job are counted

Operator doing a start-of-shift check on a CNC lathe
Overdue is the number to watch

The sample plant had 18 overdue inspections against 22 completed. An overdue list that is longer than the done list is the earliest sign that the inspection plan is bigger than the time given to it.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Keep inspections short and specific to the machine. Eight clear items that are walked every week beat thirty that are skimmed. Raise a job from every failed item, even a small one, so the finding has an owner, and review the findings with no work order at the weekly maintenance meeting. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Which inspection templates does Oxmaint start with?
Mechanical power press inspection (weekly), CNC cell start-of-shift check (every shift), overhead crane frequent inspection (monthly) and forklift pre-shift inspection (every shift), each with its own items. Sign up to open them.
Does a failed item create a work order?
A failed item can raise a corrective work order against the same machine, and findings that have no work order yet are counted on the getting started page. Sign up and fail an item on the sample plant.
Does using these templates make me OSHA compliant?
No software can promise that. The templates follow the inspections named in the standards, such as 1910.217(e) for power presses, but your own procedures, training and local rules still apply. Sign up to read the items.
How is the inspection score shown?
Each completed inspection has a score, and the register shows the completion rate, the pass rate of completed inspections and the average score, beside the overdue count. Sign up to see the sample scores.
What is the difference between an inspection and a daily check?
A daily check is a short pre-start check done before a forklift, aerial lift or crane is used. An inspection is planned on a frequency, with more items and a score. Sign up to compare them.
Can I try this without setting anything up?
Yes. The portal starts with 40 sample inspections on a ready-made plant. When you are ready, add your machines and build your own inspection types on the same pattern. Sign In to Access Micro App

Inspections That End in Action

Planned, scored and linked to the jobs they raise. Sign up and open the sample inspection register.