Preventive Maintenance Software: Run Hours & Dates

By William Jerry on November 27, 2026

preventive-maintenance-software-run-hours-dates

Preventive maintenance fails in two quiet ways: the schedule is set on the wrong trigger, or the due job is never actually raised. Oxmaint lets each PM schedule run on a calendar date, on an hour meter, or on whichever comes first. Due schedules raise their work orders one at a time or in a single click, the forecast shows the weeks ahead, and finished PMs stay in each machine's history beside its breakdowns. Sign up to try the micro app and open 55 sample schedules.

PM Schedules · Run Hours · Forecast · Notices

Preventive Maintenance Software: Run Hours & Dates

Dates, hours or both, raised on time and counted honestly. Sign up and open the sample plant's PM register.

Three Ways a PM Can Fall Due

Time
On the calendar

Every week, month or year. Right for work driven by time whatever the machine does: water treatment, annual inspections, statutory checks.

Meter
On running hours

Every 250, 500 or 2,000 hours. Right for wear that follows use: compressors, forklifts, spindles and gearboxes.

Both
Whichever comes first

Every 500 hours or 1 month. The machine that runs hard gets serviced on hours; the one that sits idle still gets seen.

Technician checking belt tension on an industrial machine during planned maintenance

A Schedule Card from the Sample Plant

CNC way lube, spindle and coolant checkActive · Both
Trigger
Every 500 hours or 1 month, whichever first
Assets
CNC machining centres and lathes, one schedule each
Estimate
2 h per service
Action
Generate work order

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. One schedule per machine, each with its own next due date and technician; CNC Machining Center 01's copy was Paused.

The Register at a Glance

portal.oxmaint.ai · PM Schedules · All Sites
55
Schedules
51
Active
6
Overdue
10
Due this week
10
Meter based

Sample plant records, captured 26 Nov 2026. Your numbers will differ.

Raising the Work, Not Just Listing It

A due PM that nobody turns into a job is still a missed PM. Each schedule card has a Generate work order button, and the register has one button that raises every due PM at once. On the sample plant it read Raise jobs for due PMs (10). Sign up and raise them on the sample plant.

30 days out
Notice: schedule an upcoming PM
2 days out
Notice: PM about to happen
Due
Raise the job, one or all
Done
Kept in the asset history

On 26 Nov 2026 the sample plant had 15 open notices at 30 days and 2 at 2 days. Notices are shown in the portal; email and SMS delivery was not connected on the sample plant.

Generate a PM Work Order

Open a due schedule, raise its job and watch it appear on the board and the calendar. Sign up to the micro app and try it.

Two PM On-Time Numbers, and Why Both Are Right

The sample plant's dashboard shows 88% PM on time in one place and 20% in another. They are not a contradiction; they answer two different questions over two different windows, and the portal shows both.

Where shownQuestion it answersWindowSample plant
Overview tileOf the schedules running, how many are not overdue right now?Today88% (45 of 51)
Plant KPIsOf the preventive jobs that fell due, how many were done on or before the due date?Last 30 days20% (2 of 10)

Sample plant records, captured 26 Nov 2026. Definitions read from the portal's KPI registry.

Read them together

A high overview figure with a low 30-day figure usually means schedules are being caught up late rather than missed entirely. The fix is in the raising and the scheduling, not in adding more schedules.

Technician taking an oil sample from a gearbox into a clear bottle

Where PMs Show Up

DashboardPMs on time and schedules overdueOverview
PM ForecastThirteen weeks of work on hours and dates90 days
CalendarEach due PM on its day, next to work ordersMonth
Maintenance Notices30-day and 2-day noticesRules
Asset historyEvery completed PM on that machineAll time
Expert Review
Reviewed by the Oxmaint AI maintenance team

Pick the trigger from how the part wears, not from what is easy to schedule. Anything that wears with use belongs on hours, or on hours with a calendar back-stop. Then judge your programme on the 30-day on-time figure, because that is the one that shows whether due work is done when it is due. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Can a PM run on both hours and dates?
Yes. A schedule can be time based, meter based, or both, in which case it falls due on whichever comes first, like every 500 hours or one month. Sign up to open a schedule.
How do I raise all the due PMs at once?
The PM register has a single button that raises a work order for every due schedule, and each schedule card also has its own Generate work order button. Sign up and try it.
Why does the dashboard show two PM on-time figures?
One counts running schedules not overdue today. The other counts preventive jobs due in the last 30 days that were finished on or before the due date. Both are labelled with their window. Sign up to see the definitions.
Can I pause a schedule?
Yes. A schedule can be set to Paused, for example while a machine is out of service, and the register shows it as Paused rather than Active. Sign up to look at a paused schedule.
Will my team be reminded before a PM is due?
Maintenance Notices shows schedules due within 30 days to plan, and within 2 days as about to happen. Notices appear in the portal. Sign up and open Notices.
Can I try this without setting anything up?
Yes. The portal starts with a ready-made plant and 55 PM schedules. When you are ready, send your PM schedules and asset list and they are loaded in place of the starting records. Sign In to Access Micro App

Preventive Work That Actually Gets Raised

Dates, hours or both, one-click job raising and honest on-time figures. Sign up and open the sample PM register.


Share This Story, Choose Your Platform!