How to Connect SAP S/4HANA with OxMaint for Cement Plants

By John Snow on February 21, 2026

how-to-connect-sap-and-4hana-with-oxmaint-for-cement-plants

Connecting SAP S/4HANA with Oxmaint transforms how cement plants manage maintenance operations. This guide walks you through every step: from gathering prerequisites and configuring SAP communication channels, to setting up authentication, enabling specific modules, and running your first data synchronization. A typical cement plant completes the full integration setup in 2-3 weeks. Sign up for Oxmaint to get your integration credentials and begin the process.

How-To Guide / SAP Integration

How to Connect SAP S/4HANA with OxMaint for Cement Plants

Complete step-by-step guide covering prerequisites, SAP configuration, authentication setup, module activation, and initial data synchronization for cement manufacturing operations.

1
Prerequisites
2
SAP Config
3
Authentication
4
Module Setup
5
Initial Sync

Step 1: Verify Prerequisites

Before beginning the SAP configuration process, ensure all prerequisites are in place. Missing requirements cause delays—verify everything upfront to maintain your timeline.

SAP System Requirements
SAP S/4HANA 1909 or later
PM/EAM module activated
Communication user created
OData services enabled
Access & Permissions
Basis administrator access
Communication arrangement rights
Network firewall rules approved
SSL certificate access
Oxmaint Setup
Oxmaint enterprise account
Integration credentials generated
Plant structure configured
Admin user designated
Get Integration Credentials First: Sign up for Oxmaint and navigate to Settings → Integrations → SAP to generate your integration credentials.

Need Help with Prerequisites?

Our integration team can review your SAP landscape and confirm readiness.

Step 2: Configure SAP Communication Channel

SAP S/4HANA uses Communication Arrangements to manage external system connections. This step creates the technical pathway for data synchronization between SAP and Oxmaint.

2.1

Create Communication System

Duration: 15-20 minutes

The Communication System defines Oxmaint as a trusted external system in SAP. This is a one-time setup that enables all subsequent module configurations.

A
Open Communication Systems App
In SAP Fiori Launchpad, search for "Communication Systems" or navigate via SAP GUI transaction SM59.
B
Create New System Entry
Click "New" and enter System ID: OXMAINT_PROD (or OXMAINT_DEV for test environments).
C
Configure Host Details
Enter Host Name: api.oxmaint.ai, Port: 443, enable SSL certificate verification.
Communication System Settings
System ID: OXMAINT_PROD
System Name: Oxmaint CMMS Integration
Host Name: api.oxmaint.ai
Port: 443
SSL: Active (Certificate Required)
2.2

Create Communication User

Duration: 10-15 minutes

A dedicated communication user provides the credentials that Oxmaint uses to authenticate with SAP. This user should have limited permissions—only what's required for the integration.

A
Open Communication Users App
Navigate to "Maintain Communication Users" in Fiori Launchpad or use transaction SU01.
B
Create Technical User
Create user OXMAINT_API with type "Communication User" (not dialog user).
C
Assign Required Roles
Assign role SAP_BR_MAINTENANCE_PLANNER or custom role with equivalent PM authorizations.
Security Note: Store the communication user password securely. You'll enter it in Oxmaint during Step 3. Never share credentials via email.
2.3

Create Communication Arrangement

Duration: 20-30 minutes

The Communication Arrangement links the system and user together with specific communication scenarios (APIs). This defines which SAP services Oxmaint can access.

Swipe horizontally to view full table
OData ServiceService NamePurpose
API_EQUIPMENTEquipment MasterSync equipment records
API_MAINTORDERMaintenance OrderCreate and update work orders
API_MAINTNOTIFICATIONNotificationSync maintenance requests
API_MAINTPLANMaintenance PlanPM schedules
API_FUNCLOCATIONFunctional LocationPlant structure hierarchy

Step 3: Configure Authentication in Oxmaint

With SAP configured, enter the connection details into Oxmaint. This authentication setup establishes the secure link between the systems.

3.1

Enter SAP Connection Details

Duration: 10 minutes

Navigate to Settings → Integrations → SAP S/4HANA in the Oxmaint dashboard. Enter your SAP system details to establish the connection.

Oxmaint SAP Connection Settings
SAP System URL: https://[your-s4hana-host]:443/sap/opu/odata/sap/
Client: [Your SAP Client Number, e.g., 100]
Username: OXMAINT_API
Password: [Communication User Password]
Plant: [Your Plant Code, e.g., 1000]

Stuck on Configuration?

Our SAP integration specialists can assist with complex configurations.

Step 4: Configure Module Settings

Configure which SAP modules participate in the integration. For cement plants, Plant Maintenance (PM) is required, while Materials Management (MM) and Controlling (CO) are recommended.

Plant Maintenance (PM)
Equipment, work orders, maintenance plans
Required
Materials (MM)
Spare parts, inventory management
Recommended
Controlling (CO)
Cost centers, budget tracking
Recommended

Step 5: Run Initial Data Synchronization

The initial sync imports master data from SAP into Oxmaint—equipment, functional locations, maintenance plans, and open work orders. Plan this step during low-activity periods.

5.1

Sync Equipment Master Data

Duration: 15-60 minutes

Start with equipment master data—this forms the foundation for all other sync operations. For a typical cement plant with 2,000-5,000 equipment records, expect 30-45 minutes.

Go-Live Timing: Run the final work order sync immediately before go-live so technicians see the most current assignments.

Frequently Asked Questions

QHow long does the complete integration setup take?

Most cement plants complete the full integration configuration in 2-3 weeks. This includes prerequisites verification (2-3 days), SAP configuration (3-5 days), authentication and testing (2-3 days), and initial synchronization (2-3 days).

QCan we test the integration in a sandbox first?

Yes, and we strongly recommend it. Connect Oxmaint to your SAP development or quality system first. Run through all sync operations, test bidirectional data flow, and validate field mappings. Book a demo to discuss your testing strategy.

QWhat happens if SAP connectivity is interrupted?

Oxmaint queues all transactions locally during connectivity interruptions. Technicians continue working normally using cached data. When connectivity resumes, queued changes sync automatically in chronological order.

QDo we need SAP Cloud Connector for on-premise S/4HANA?

For on-premise S/4HANA systems that aren't directly accessible from the internet, yes. SAP Cloud Connector provides secure tunneling from Oxmaint cloud to your on-premise SAP. Sign up for Oxmaint and our team can guide Cloud Connector setup.

QCan we sync only specific equipment or work order types?

Yes. Filter settings in both SAP and Oxmaint allow selective synchronization by plant code, equipment category, order type, or maintenance planner group. This lets you start with a subset and expand gradually.

Ready to Connect SAP S/4HANA?

Get your integration credentials and begin configuration today. Our SAP integration specialists are available to assist with complex setups.


Share This Story, Choose Your Platform!

Related Posts