A data center preventive maintenance checklist has to name the critical asset and the window it is done in. Oxmaint's Data centers type brings five checklists, four inspection types and maintenance windows with window plans (MOP). Equipment is a critical asset, places are data halls and zones, and the inspections cover generator load tests, UPS and battery rounds, cooling systems and fire suppression. Stored records never change with the switch. Sign up to choose Data centers on the sample site.

Data centers · Critical assets · Maintenance windows

Data Center Preventive Maintenance Checklist

Checklists and windows for UPS, generators and cooling. Sign up and choose Data centers.

A Data Center Preventive Maintenance Checklist by Critical Asset

Choose Data centers under Type of facilities and the words change. The site stays a Site, places become Data halls and zones, equipment becomes a critical asset, and an outage is called an Outage. The tile for equipment that matters most reads Full data hall loss. Halls and zones are places, never assets.

Maintenance windows with window plans beside the five data center checklists

Illustrative example, not sample site data.

Four Inspection Types

Inspection typeFrequencyApplies to
Generator Load TestMonthlyDiesel generators, fuel tanks
UPS and Battery InspectionWeeklyUPS modules, UPS battery strings
Cooling System InspectionMonthlyCRAH units, chillers
Fire Suppression and Detection InspectionQuarterlyClean agent suppression, aspirating smoke detection

Each type has six lines. The UPS round includes battery terminals tight and clean, no swelling or leakage on cells, status LEDs normal, battery room ambient temperature, hydrogen detector readings and load within design capacity. The cooling round looks at filter pressure drop, refrigerant leaks, pump seals, condensate drains, air temperatures and unusual noise.

Four data center inspection types with their frequencies: Generator Load Test, UPS and Battery Inspection, Cooling System Inspection and Fire Suppression and Detection Inspection

Illustrative example, not sample site data.

Five Checklists for the Hall and the Plant

The checklists are Daily Data Hall Walk, Generator Monthly Load Test, UPS and Battery Room Weekly Check, Maintenance Window Close-Out and Quarterly Fire System Verification. The hall walk covers cold and hot aisle temperatures, building management system alarms, leak detection, UPS output voltage, generator fuel level and doors latched.

Choose Data Centers on the Sample Site

Switch the type of facilities and read the checklists. Sign up to the micro app and try it.

Maintenance Windows and Window Plans

Planned work runs in named maintenance windows. The Window plans (MOP) page lists each window with its status, which reads Planned, In Progress, Completed or Cancelled, and counts the tasks outstanding. The sample windows include UPS module annual service, chiller condenser coil cleaning, switchgear infrared scan and torque check, a generator load bank test and a battery string specific gravity check.

Cards for Critical Assets

The dashboard shows Availability, Critical PM on time, Critical assets at risk, Cooling and power alarms to jobs, PUE and MTTR on critical assets. PUE appears only when both the facility and IT meters are connected, and otherwise says to connect them. Critical assets at risk counts those that are down, have an open corrective job or have a preventive job past due.

Your procedure comes first

The checklists are starting points. Edit the lines to match your own written procedure for each critical asset, and keep lockout and permits in the safety registers where the work is controlled.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Write the window close-out before the window opens. Name the critical asset, the person who owns the window and the lines to confirm on the way out, then walk them. Review Critical assets at risk before every window so that nothing already down is left waiting behind the planned work. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What inspection types come with the Data centers type?
Generator Load Test, UPS and Battery Inspection, Cooling System Inspection and Fire Suppression and Detection Inspection. Sign up to see them.
How often is each inspection set to run?
The generator test and cooling inspection are monthly, the UPS and battery round is weekly, and fire suppression is quarterly. Sign up to see the frequencies.
What is a window plan?
A maintenance window with its tasks, shown on the Window plans (MOP) page with a status of Planned, In Progress, Completed or Cancelled. Sign up to open the windows.
When does the PUE card show a value?
Only when both the facility and IT load meters are connected. Until then it says to connect them rather than showing a guess. Sign up to see the card.
Are data halls assets?
No. A data hall, zone, UPS or battery room and generator yard are places. UPS modules, PDUs and chillers are the critical assets. Sign up to see places and assets.
Can I edit the checklists?
Yes. They are starting points, and your own lines and checklists can replace them. Sign up to open the checklist builder.

Run Every Window with a Checklist

Critical asset checklists and window plans. Sign up and choose Data centers.