State Departments of Transportation manage infrastructure portfolios measured in billions of dollars — pavements, bridges, tunnels, culverts, signs, signals, and facilities — under a federal requirement to do it systematically. The MAP-21 Transportation Asset Management Plan mandate from FHWA requires every state DOT to maintain an approved TAMP that demonstrates how the agency will achieve and sustain specified performance targets for NHS pavement condition and bridge condition. Meeting that mandate requires data — current condition data, lifecycle cost data, and treatment history data — that can only come from a structured asset management system. Start a free trial with Oxmaint to structure your DOT maintenance data program, or book a 30-minute session with our transportation asset management specialists.
What MAP-21 and FHWA Actually Require in a State TAMP
Condition Data, Lifecycle Cost, and Performance Targets: What CMMS Tracks
NHS Asset Condition Benchmarks: Where State DOTs Stand
| Asset Class | Metric | National Average | FHWA Good Threshold | FHWA Poor Threshold | TAMP Target Requirement |
|---|---|---|---|---|---|
| NHS Pavement | IRI (International Roughness Index) | 68 in/mile | <95 in/mile | >170 in/mile | Maintain or improve % good; reduce % poor |
| NHS Pavement | Cracking (% cracked area) | 14% | <5% | >20% | Set 2-yr and 4-yr targets; report biannually |
| NHS Bridges | NBI Deck/Super/Sub Rating | 7.2 avg | Rating ≥7 (Good) | Rating ≤4 (Poor) | <10% of deck area in poor condition |
| NHS Bridges | Structurally Deficient % | 7.4% nationally | <5% target | >10% critical | Must not exceed 10% SD by deck area |
Oxmaint CMMS captures inspection results, treatment history, and cost data against every NHS asset — giving your TAMP team the complete data foundation for lifecycle cost analysis and performance target reporting.
State DOT Asset Managers on TAMP Data Quality
State DOT TAMP and Asset Management: Common Questions
Oxmaint captures treatment history, inspection results, and lifecycle costs against every NHS asset — giving your TAMP team the validated data foundation for FHWA approval.







