A melt shop does not stop for paperwork, and its maintenance has to fit around heats, relines and crane lifts. Oxmaint's Metals & Foundry setup arranges the plant as shops and bays, registers furnaces, ladles and overhead cranes as equipment, and adds furnace availability, days since reline, crane inspections on time and downtime by shop to the dashboard. EHS, lubrication routes, incidents and the crane checks stay on. Sign up to try the micro app and choose the metals setup.
CMMS for Steel Plants, Metals and Foundries
Furnaces on run hours, cranes on inspections, and downtime counted by shop. Sign up and explore the metals setup.
A Sample Steelworks, Shop by Shop
Choose the metals setup and the starting plant is Steelworks Plant in Youngstown, Ohio, laid out the way a metals plant talks: plants, shops and bays, with cranes in every bay. Sign up to walk it.
Sample plant records from the starting content of the portal's Metals & Foundry setup, not a named mill.
Four Indicators Made for Metals
| Indicator | How it is counted |
|---|---|
| Furnace availability | Furnace run time as a share of planned production time: planned time minus unplanned stops on the furnace, divided by planned time |
| Days since reline | The mean number of days since the last completed reline or refractory job on each furnace and ladle that has one |
| Crane inspections on time | Crane and hoist inspection jobs due in the period completed on or before their due date; target 100% |
| Downtime by shop | Unplanned downtime hours in each shop, with the shop that lost the most shown first |
They sit beside availability, unplanned downtime, MTBF and PM on time, each counted from your own records with its definition one click away.
Choose the Metals Setup
See the shops and bays, the furnace and crane indicators and the starting PM programmes. Sign up to the micro app and explore.
PM Programmes on Heats, Hours and Dates
Refractory wears with use, so the furnace programmes run on hours; cranes and calibrations run on the calendar. The starting programmes are a base you can change.
Read from the metals setup's starting content. Programmes removed in the product's own content review are not offered.
Cranes, Checked Daily and Monthly
Walked before the crane is used, on a phone
Basis: ASME B30.2 pre-shift, OSHA 1910.179(j)(2)
A failed critical item marks the crane do not use and can raise a job
A planned inspection with items such as the upper limit switch, hook latch, wire rope, pendant, brakes and capacity marking
Counted in crane inspections on time
Failed items can raise corrective work
Rounds Through the Plant
The metals setup keeps EHS on: hot-work permits and lockout procedures sit on the same furnaces and cranes as the work orders, and incidents are recorded against the shop where they happened.
Put refractory work on hours from the first day and close every reline as a job, because days since reline is only as good as the last completed refractory job. Treat crane inspections on time as a 100 percent target, not a trend, and read downtime by shop weekly to see which bay is quietly losing the most hours. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Maintenance Built Around the Melt Shop
Furnaces, ladles, cranes and bays in one portal. Sign up and explore the metals setup.







