CMMS for Steel Plants, Metals and Foundries | Oxmaint

By William Jerry on November 28, 2026

cmms-for-steel-plants-metals-and-foundries

A melt shop does not stop for paperwork, and its maintenance has to fit around heats, relines and crane lifts. Oxmaint's Metals & Foundry setup arranges the plant as shops and bays, registers furnaces, ladles and overhead cranes as equipment, and adds furnace availability, days since reline, crane inspections on time and downtime by shop to the dashboard. EHS, lubrication routes, incidents and the crane checks stay on. Sign up to try the micro app and choose the metals setup.

Metals & Foundry · Furnaces · Cranes · Shops and Bays

CMMS for Steel Plants, Metals and Foundries

Furnaces on run hours, cranes on inspections, and downtime counted by shop. Sign up and explore the metals setup.

A Sample Steelworks, Shop by Shop

Choose the metals setup and the starting plant is Steelworks Plant in Youngstown, Ohio, laid out the way a metals plant talks: plants, shops and bays, with cranes in every bay. Sign up to walk it.

Melt Shop2 bays
Furnace Bay 1
Electric arc furnace, overhead crane, dust collector
Furnace Bay 2
Induction furnace, overhead crane, dust collector
Casting Shop2 bays
Molding Bay 1
Sand molding line, die casting machine, crane
Molding Bay 2
Sand molding line, die casting machine, crane
Forging Shop2 bays
Press Bay 1
Forging press, heat treat furnace, compressor
Press Bay 2
Forging press, heat treat furnace, compressor
Finishing Shop2 bays
Machining Bay 1
CNC machining centre, shot blast, robot
Machining Bay 2
CNC machining centre, shot blast, robot

Sample plant records from the starting content of the portal's Metals & Foundry setup, not a named mill.

Four Indicators Made for Metals

IndicatorHow it is counted
Furnace availabilityFurnace run time as a share of planned production time: planned time minus unplanned stops on the furnace, divided by planned time
Days since relineThe mean number of days since the last completed reline or refractory job on each furnace and ladle that has one
Crane inspections on timeCrane and hoist inspection jobs due in the period completed on or before their due date; target 100%
Downtime by shopUnplanned downtime hours in each shop, with the shop that lost the most shown first

They sit beside availability, unplanned downtime, MTBF and PM on time, each counted from your own records with its definition one click away.

Rolling mill stand and rolls in a steel plant

Choose the Metals Setup

See the shops and bays, the furnace and crane indicators and the starting PM programmes. Sign up to the micro app and explore.

PM Programmes on Heats, Hours and Dates

Refractory wears with use, so the furnace programmes run on hours; cranes and calibrations run on the calendar. The starting programmes are a base you can change.

Starting programmes on run hours
Electric arc furnace refractory inspectionevery 200 h
Induction furnace lining checkevery 500 h
Frequent overhead crane inspectionEvery bay's crane1 month
Periodic overhead crane load testCranes12 months
Heat treat furnace temperature calibrationHeat treat furnaces12 months
Die casting machine hydraulic filter changeDie casting1 month
Sand molding line belt tension checkMolding lines4 weeks
Shot blast machine abrasive flow checkShot blast2 weeks

Read from the metals setup's starting content. Programmes removed in the product's own content review are not offered.

Cranes, Checked Daily and Monthly

Pre-shift crane check (daily)

Walked before the crane is used, on a phone

Basis: ASME B30.2 pre-shift, OSHA 1910.179(j)(2)

A failed critical item marks the crane do not use and can raise a job

Frequent crane inspection (monthly)

A planned inspection with items such as the upper limit switch, hook latch, wire rope, pendant, brakes and capacity marking

Counted in crane inspections on time

Failed items can raise corrective work

Rounds Through the Plant

Scrap Yard and Charging
Inspection
Melting Furnace and Refractory
Check
Sand Molding Line
Walk
Die Casting and Shot Blast
Audit
Forging and Heat Treatment
Review
Machining and Finishing
Patrol
Overhead crane above a steel plant hall in daylight
Hot work and lockout on the same records

The metals setup keeps EHS on: hot-work permits and lockout procedures sit on the same furnaces and cranes as the work orders, and incidents are recorded against the shop where they happened.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Put refractory work on hours from the first day and close every reline as a job, because days since reline is only as good as the last completed refractory job. Treat crane inspections on time as a 100 percent target, not a trend, and read downtime by shop weekly to see which bay is quietly losing the most hours. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What changes when I choose the metals setup?
The plant is arranged as shops and bays, machines are called equipment such as furnaces, ladles and cranes, EHS, lubrication and incidents are on, and the dashboard adds furnace and crane indicators. Sign up to choose it.
How is days since reline worked out?
It is the mean number of days since the last completed reline or refractory job on each furnace and ladle that has one, as of now. Close relines as jobs and it stays current. Sign up to read the definition.
Can furnace PMs run on hours?
Yes. The starting electric arc furnace refractory inspection runs every 200 hours and the induction furnace lining check every 500 hours. You can change either or add a calendar back-stop. Sign up and open a programme.
Are overhead cranes covered?
Yes. A daily pre-shift crane check and a monthly frequent inspection are both built in, and crane inspections on time is a dashboard indicator for this setup. Sign up to see the crane checks.
Does this make my plant compliant with crane standards?
No software can promise that. The checks follow the inspections the standards describe, but your own procedures, competent inspectors and local rules still apply. Sign up to read the items.
Can I try this without setting anything up?
Yes. Choose the metals setup and explore the sample steelworks. When you are ready, send your equipment list, parts and PM schedules and they are loaded in place of the starting records. Sign In to Access Micro App

Maintenance Built Around the Melt Shop

Furnaces, ladles, cranes and bays in one portal. Sign up and explore the metals setup.


Share This Story, Choose Your Platform!