Kanban Work Order Board for Maintenance Teams

By William Jerry on November 27, 2026

kanban-work-order-board-for-maintenance-teams

A maintenance list tells you how many jobs are open. A board tells you where each one is stuck. Oxmaint shows every work order as a card in its status column, from Open through Assigned, In Progress and On Hold to Completed, and each move asks for what the next stage needs: who is on the job, why it is waiting, or what work was done. Cards also show whether the parts a job lists are on the shelf. Sign up to try the micro app and open a sample plant with 133 cards already on the board.

Kanban Board · Work Orders · Parts Readiness

Kanban Work Order Board for Maintenance Teams

Drag a card, or use its Move control, and the board asks the questions a supervisor would. Sign up and open a sample board with real-looking jobs on it.

The Sample Plant's Board, Column by Column

The portal opens on a sample metal fabrication plant with about two months of work orders. This is how its board read on 26 November 2026. Open is empty because every open job already has someone on it, so those cards sit under Assigned. Sign up to open the real board.

portal.oxmaint.ai · Kanban Board · All Sites
Open0
No open jobs without someone on them
The column fills when a job has nobody assigned
Assigned28
WO-2734 Coolant pump replacement
Coolant Recycling System 01 · Jake Sullivan
WO-2612 Switchgear infrared scan
Main Switchboard 01 · Emily Novak
In Progress35
WO-2717 Band saw blade change and guide adjustment
Band Saw 01 · Ryan Foster
WO-2679 Coil feed line roll adjustment
Coil Feed Line 01 · Carlos Ramirez
On Hold12
WO-2735 Screw compressor 2,000 h service
Screw Air Compressor 01 · Jake Sullivan
WO-2632 Robot torch liner and contact tip change
Robotic Welding Cell 01 · Tyler Brooks
Completed58
WO-2694 Motor overload trip
Belt Conveyor 01 · Done 25 Nov
WO-2688 Laser nozzle and protective window
Fiber Laser Cutter 01 · Done 23 Nov

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. 140 work orders in total; 7 cancelled jobs are counted but not shown, and the Completed column shows the latest 15. Your numbers will differ.

Every Move Asks One Question

The same rules sit behind the board, the job page and the work order list, so a job cannot skip a step through one door that another door would have stopped. These are the questions, by the column a card enters.

Card moves toRequiredAlso captured
AssignedWho is doing the jobInstructions for the technician; a due date filled in from the priority
In ProgressA person on the job, if nobody is yetA start note; "Safety steps done?" when the job or its asset has a permit, a lockout or a safety checklist
On HoldThe reason it is waitingAn expected date; for parts, the part or purchase order it waits for
CompletedA summary of the work doneTime, downtime, parts used, the cause, photos and whether a follow-up job is needed
Back a step or CancelledThe reasonA line in the job's activity with who moved it and when
Maintenance crew holding a short morning stand-up in front of a job board in a bright workshop

Why a Card Is Waiting

On Hold is where jobs go quiet. Oxmaint makes the reason part of the move, picked from a short list, so the twelve held cards on the sample board each say why they are there.

Reason 1
Waiting for parts

Links the part or the purchase order the job is waiting on, so the store and the buyer see it too.

Reason 2
Waiting for a production stop window

The machine cannot come down until the line does. The card says so instead of looking forgotten.

Reason 3
Waiting for another trade

An electrician, a fitter or an outside service firm has to come first.

Reason 4
Waiting for approval

Someone has to sign off cost, scope or access before work continues.

Reason 5
Other

Allowed, but only with your own words written in, so nothing is held without a reason.

Plus
An expected date

Each held card can show when the job is expected to move again.

Move a Card on the Sample Board

Open the board, drag a job to On Hold and see what the portal asks. Sign up to the micro app and try it on the sample plant.

Due Dates Set by Priority

When a job is assigned, the board fills in a due date from its priority. The planner can change it, but the starting point is the same for everyone.

Days from assignment to due date, by priority
Critical1 day
High3 days
Medium7 days
Low14 days

Read from the portal's status map (lib/stageMap.js). On the sample board, red dates on a card mean the job is past due.

Parts on the Card, Before Anyone Walks to the Store

A work order can list the parts it needs. Oxmaint hands the stock on the shelf out across every open job in the order the work would be done: started jobs first, then priority, due date and age. The card then shows Parts ready, or how many parts are short. A filter narrows the board to jobs with parts ready, jobs waiting on parts, or jobs with no parts listed. Sign up to try the parts filter.

Job lists its parts
Part and quantity on the work order
Stock is allocated
Started work first, then priority and due date
Card shows the answer
Parts ready, or N parts short
Technician updating a job status on a tablet beside a machine in daylight

Board or List?

Work order list

Search by number, title, asset or manufacturer

Filter by status, priority, type and asset

Export to CSV or PDF

Best for finding one job or reporting on many

Kanban board

Every job by stage, at a glance

Drag or Move, with the stage questions built in

Filter by person, priority and parts state

Best for the daily stand-up and the planner's morning

Expert Review
Reviewed by the Oxmaint AI maintenance team

A board helps most when the columns are honest. Keep Open for jobs nobody owns yet, and look at On Hold every morning: a held card without a fresh expected date is usually a job that has been forgotten. List the parts on planned jobs before they are assigned, so the card can warn you about a short part before the technician finds out at the store counter. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Which columns does the Oxmaint board show?
Open, Assigned, In Progress, On Hold and Completed. Open is split by whether anyone is on the job, and draft, closed and cancelled jobs stay off the board, with cancelled jobs counted beside the total. Sign up to open the board.
Can I drag cards, or do I have to use a menu?
Both. Drag a card to another column, or use the Move control on the card. Either way the portal asks the same questions for the stage the card enters, such as who is assigned or why the job is on hold. Sign up and move a card.
What happens when I put a job on hold?
You pick a reason: waiting for parts, a production stop window, another trade, approval, or Other with your own words. You can add an expected date, and for parts, link the part or the purchase order. Sign up to try it.
How does a card know if parts are available?
The job lists its parts. Oxmaint allocates the stock on hand across all open jobs, started work first, then by priority and due date, and the card shows Parts ready or how many parts are short. Sign up to see Parts Readiness.
Is the board a separate list of jobs?
No. The board, the work order list, the calendar and My Tasks all read the same work orders, so a move on the board is the same change a technician sees on the job page. Sign up and compare the views.
Can I try this without setting anything up?
Yes. The portal starts with a ready-made plant, so you can look at the board straight away. When you are ready, add your own machines under Assets, or send your asset list and work order history and they are loaded in place of the starting records. Sign In to Access Micro App

Every Job, Every Stage, One Board

See where each work order is, why the held ones are waiting, and which jobs have their parts. Sign up and open the sample board.