Maintenance KPI Software: MTBF, MTTR & PM

By William Jerry on November 28, 2026

maintenance-kpi-software-mtbf-mttr

A maintenance KPI is only useful if everyone reading it means the same thing. Oxmaint calculates its KPIs from the plant's own work orders, stops, inspections and parts, and puts a written definition on every card, so two people reading PM on time are looking at the same rule. The catalogue holds 43 indicators across assets, work orders, inspections, inventory and the team, including MTBF, MTTR, backlog and downtime cost. Sign up to open the KPI catalogue on a sample plant.

KPIs · MTBF · MTTR · PM On Time · Backlog

Maintenance KPI Software: MTBF, MTTR & PM

Indicators from your own records, each with its definition and window. Sign up and read the catalogue.

43 Indicators in Five Groups

Indicators by group
15
10
7
7
4
Work OrderAssetInspectionInventoryTeam

From the Oxmaint portal's KPIs page on the sample plant, captured 26 Nov 2026: 43 indicators, 6 highlighted.

Core Definitions

IndicatorDefinition
MTBFRun time divided by the number of unplanned stops
MTTRMean duration of the unplanned stops closed in the period
PM on timePreventive jobs due in the period done on or before the due date
AvailabilityRun time as a share of planned production time; target 90%
Backlog hoursEstimated hours sitting in the open queue
BacklogOpen planned work, in weeks of the department's planned-work hours
Downtime costUnplanned downtime hours times each line's cost per hour
Critical spares shortParts for line machines below minimum or out, as of now
Technician finishing a repair with a timer visible on a phone

Read the KPI Catalogue

Open each indicator's definition and click through to the records behind it. Sign up to the micro app and look.

Sample Values, With Their Windows

MTBFLast 30 days, 152 stops23.1 h
MTTRLine stops closed, last 30 days0.8 h
PM on timePreventive jobs due, last 30 days (2 of 10)20%
PM on timeRunning schedules not overdue, today (45 of 51)88%
Inspection pass rateInspections carried out (3 failed)73%
Downtime costUnplanned hours x line rate, last 30 days$193,463

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. The two PM on time figures count different things over different windows; both are shown with theirs.

Indicators for Your Industry

Food
CIP on time

Cleaning-in-place jobs done on time, target 95%, and sanitation stops.

Process
Rounds and safety PM

Operator rounds done, target 95%, and safety PM on time, target 100%.

Metals
Furnaces and cranes

Furnace availability, days since reline and crane inspections on time.

Discrete
Changeovers

Changeover time alongside OEE and critical spares short.

Maintenance manager reviewing indicators on a tablet on the shop floor
No data is not zero

An indicator without the records it needs says what is missing, such as add production counts to see OEE, instead of showing 0.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Pick five indicators and read them every week rather than forty once a quarter. For most plants that is availability, MTBF, MTTR, PM on time and backlog. Always read a KPI with its window: a figure as of today and a figure over 30 days can both be right and still disagree. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Which maintenance KPIs does Oxmaint track?
43 indicators across assets, work orders, inspections, inventory and the team, including MTBF, MTTR, PM on time, backlog, availability and downtime cost. Sign up to see them.
How is MTBF calculated?
Run time divided by the number of unplanned stops in the period. On the sample plant it was 23.1 h over the last 30 days. Sign up to read it.
How is MTTR calculated?
The mean duration of the unplanned stops closed in the period. Read it with its window, because other screens may show wrench time instead. Sign up to compare.
What does PM on time measure?
Preventive jobs due in the period that were completed on or before their due day, as a share of those due. Sign up to see the definition.
Are there industry-specific KPIs?
Yes. Food, process, metals and discrete setups add their own, such as CIP on time, operator rounds done, days since reline and changeover time. Sign up to choose a setup.
Where do the numbers come from?
From your own records: work orders, stops, inspections and parts. Nothing is typed into a separate scorecard. Sign In to Access Micro App

KPIs Everyone Reads the Same Way

MTBF, MTTR, PM on time and backlog from your records, with a definition on every card. Sign up and explore the micro app.