Maintenance buys from two kinds of outside firm: suppliers that send parts and contractors that send people. Oxmaint keeps both in one vendor register, with contact, payment terms, lead time, the parts they supply and their open purchase orders, and uses the same names on purchase orders, on work orders assigned to a contractor and on contractor labour, so the history of each firm builds in one place. Sign up to open the sample vendor register with 8 vendors and 12 open orders.
Vendor Management for Maintenance Parts & Work
One register for the firms you buy from and the firms you send work to. Sign up and see the sample vendors.
The Sample Vendor Register
Sample plant records from the Oxmaint portal's Vendors, captured 26 Nov 2026.
| Vendor | Terms | Lead time |
|---|---|---|
| Tolliver Industrial Supply | Net 60 | 5 days |
| Tolliver Bearings & Drives | Net 30 | 6 days |
| Orrin Power Transmission | Net 30 | 19 days |
| Linden Fasteners | Net 60 | 5 days |
| Orrin MRO Supply | Net 60 | 16 days |
| Hartwell CNC Service | Net 60 | 18 days |
| Pinecrest Gas & Welding | Net 45 | 3 days |
| Greenfield Lift Truck Service | Net 30 | 3 days |
Open the Sample Vendor Register
See terms, lead times, parts and open orders for each vendor. Sign up to the micro app and look.
Lead Times at a Glance
Sample plant records, captured 26 Nov 2026. Tolliver Industrial Supply supplies 9 parts and has 2 open POs.
Where a Vendor Shows Up
PO-4101 to Tolliver Bearings & Drives, 2 lines, $4,040; PO-4103 to Linden Fasteners, $8,377, received.
A job can be assigned to a vendor or contractor, so it reads as theirs from the start.
Contractor hours are booked on the job; Greenfield Lift Truck Service booked 1 visit, 3 h, $282.
Sample plant records from Purchase Orders and Labor, captured 26 Nov 2026: contractors booked 24 h, 4% of labour hours.
Besides contractor time, a job can carry other costs in the Contractor category, so the full cost of outside work sits on the work order it belongs to.
Keep lead times honest by updating them from real deliveries, then set minimums with them: a part from a 19-day supplier needs more cover than one from a 3-day supplier. Assign contractor jobs to the vendor, not to a person's name, so their history builds in one place. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Every Supplier and Contractor in One Place
Terms, lead times, open orders and contractor work, beside your jobs. Sign up and explore the micro app.